IP Library Granted Patent US 10,172,135
Granted Patent B2
US 10,172,135 · App. 15/302,721 · Granted Jan 1, 2019

MMW physical layer downlink channel scheduling and control signaling

Inventors: Tao Deng (Roslyn, NY); Yugeswar Deenoo (King of Prussia, PA); Philip J. Pietraski (Jericho, NY); Ravikumar V. Pragada (Collegeville, PA)
Assignee: IDAC Holdings, Inc.
H04W72/046H04W72/1289H04W84/045
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,172,135
App. No.
15/302,721
Granted
Jan 1, 2019
Kind
B2
Abstract

A wireless transmit/receive unit (WTRU) (e.g., a millimeter WTRU (mWTRU)) may receive a first control channel using a first antenna pattern. The WTRU may receive a second control channel using a second antenna pattern. The WTRU may demodulate and decode the first control channel. The WTRU may demodulate and decode the second control channel. The WTRU may determine, using at least one of: the decoded first control channel or the second control channel, beam scheduling information associated with the WTRU and whether the WTRU is scheduled for an mmW segment. The WTRU may form a receive beam using the determined beam scheduling information. The WTRU receive the second control channel using the receive beam. The WTRU determine, by demodulating and decoding the second control channel, dynamic per-TTI scheduling information related to a data channel associated with the second control channel.

Claims (40)

1. A control signaling and scheduling method performed by a wireless transmit/receive unit (WTRU), the method comprising:

receiving a first control channel using a first antenna pattern;

receiving a second control channel using a second antenna pattern;

demodulating and decoding the first control channel;

demodulating and decoding the second control channel;

determining, using at least one of the decoded first control channel or the decoded second control channel, beam scheduling information associated with the WTRU and whether the WTRU is scheduled for a millimeter wave (mmW) segment;

on a condition that the WTRU is scheduled for the mmW segment

forming a receive beam using the determined beam scheduling information,

receiving the second control channel using the receive beam, and

determining, using the demodulated and decoded second control channel, dynamic per-transmission time interval (TTI) scheduling information related to a data channel associated with the second control channel.

2. The method of claim 1 , further comprising receiving the data channel using the dynamic per-TTI scheduling information.

3. The method of claim 1 , wherein the first control channel is configured per beam of the WTRU.

4. The method of claim 1 , wherein the first control channel is one of: a common physical downlink directional control channel (PDDCCH), a physical downlink control channel (PDCCH), an enhanced PDCCH (EPDCCH), or a millimeter wave physical downlink control channel (mmPDCCH).

5. The method of claim 1 , wherein the first control channel is carried using a first mmW beam or an LTE beam and the second control channel is carried using a second mmW beam, wherein the first mmW beam or the LTE beam is wider than the second mmW beam.

6. The method of claim 1 , wherein the beam scheduling information associated with the WTRU comprises transmit and receive beam scheduling information.

7. The method of claim 1 , wherein the data channel is a physical downlink directional data channel (PDDDCH), and wherein the second control channel is a dedicated physical downlink directional control channel (PDDCCH) and comprises one or more of modulation and coding scheme (MCS), or new data indicator (NDI).

8. The method of claim 1 further comprising determining a validity period associated with the per-TTI scheduling information and applying the per-TTI scheduling information to one or more mmW TTIs.

9. The method of claim 8 , wherein the per-TTI scheduling information is identical for a plurality of consecutive TTIs within a subframe.

10. The method of claim 1 , wherein resource allocation of one or more of the first control channel or the second control channel is received from a network via higher layer signaling.

11. A wireless transmit/receive unit (WTRU) comprising:

a processor configured to at least:

receive a first control channel using a first antenna pattern;

receive a second control channel using a second antenna pattern;

demodulate and decode the first control channel;

demodulate and decode the second control channel;

determine, using at least one of the decoded first control channel or the decoded second control channel, beam scheduling information associated with the WTRU and whether the WTRU is scheduled for a millimeter wave (mmW) segment;

on a condition that the WTRU is scheduled for the mmW segment

form a receive beam using the determined beam scheduling information,

receive the second control channel using the receive beam, and

determine, using the demodulated and decoded second control channel, dynamic per-transmission time interval (TTI) scheduling information related to a data channel associated with the second control channel.

12. The WTRU of claim 11 , wherein the processor is further configured to receive the data channel using the dynamic per-TTI scheduling information.

13. The WTRU of claim 11 , wherein the first control channel is configured per beam of the WTRU.

14. The WTRU of claim 11 , wherein the first control channel is one of: a common physical downlink directional control channel (PDDCCH), a physical downlink control channel (PDCCH), an enhanced PDCCH (EPDCCH), or a millimeter wave physical downlink control channel (mmPDCCH).

15. The WTRU of claim 11 , wherein the first control channel is carried using a first mmW beam or an LTE beam and the second control channel is carried using a second mmW beam, wherein the first mmW beam or the LTE beam is wider than the second mmW beam.

16. The WTRU of claim 11 , wherein the beam scheduling information associated with the WTRU comprises transmit and receive beam scheduling information.

17. The WTRU of claim 11 , wherein the second control channel is a dedicated PDDCCH and comprises one or more of modulation and coding scheme (MCS), or new data indicator (NDI).

18. The WTRU of claim 11 , wherein the data channel is a physical downlink directional data channel (PDDDCH).

19. The WTRU of claim 11 , wherein the processor is further configured to determine a validity period associated with the per-TTI scheduling information and apply the per-TTI scheduling information to one or more mmW TTIs.

20. The WTRU of claim 19 , wherein the per-TTI scheduling information is identical for a plurality of consecutive TTIs within a subframe.

21. The WTRU of claim 11 , wherein resource allocation of one or more of the first control channel or the second control channel is received from a network via higher layer signaling.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2023
From: IDAC HOLDINGS, INC.
To: INTERDIGITAL PATENT HOLDINGS, INC.
Reel/Frame 063089/0085 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 15, 2017
From: DENG, TAO; DEENOO, YUGESWAR; PIETRASKI, PHILIP J.; PRAGADA, RAVIKUMAR V.
To: IDAC HOLDINGS, INC.
Reel/Frame 041264/0526 →
Continuity (2)
Provisional Application 61977613 · Apr 9, 2014
Related Publication 20170034812A1 · Feb 2, 2017