IP Library Granted Patent US 10,859,068
Granted Patent B2
US 10,859,068 · App. 15/305,176 · Granted Dec 8, 2020

Electric propulsion power circuit

Inventors: Michael Madigan (Woodinville, WA); Alexandr L. Kristalinski (Kirkland, WA); Brian Koch (Woodinville, WA)
Assignee: AEROJET ROCKETDYNE, INC.
F03H1/0018B64G1/405B64G1/428
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,859,068
App. No.
15/305,176
Granted
Dec 8, 2020
Kind
B2
Abstract

A circuit ( 400, 700, 800 ) comprising: a first power source ( 402 ) supplying first current to a load ( 470 ) during a first Period of Time (“PoT”); a second power source ( 416 ) supplying a second current to the load during a second POT; a Unidirectional Current Valve (“UCV”) in series with the first power source; a current detector ( 420, 702, 802 ) in series with the UCV ( 422 ); and a switch ( 424 ) in parallel with a series combination of the current detector and UCV to bypass the UCV during the second PoT. The current detector determines whether the second period of time has commenced and whether the switch has closed.

Claims (103)

1. A power supply circuit, comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the second power source;

a current detector in series with the unidirectional current valve such that (i) the unidirectional current valve resides between the second power source and the current detector, and (ii) current flows from the unidirectional current valve in a direction towards the current detector;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time;

wherein the current detector determines whether the second period of time has commenced based on an amount of energy stored by the current detector and determines whether the switch has closed based on generation of a negative pulse by the current detector.

2. The power supply circuit according to claim 1 , wherein current flow through the unidirectional current valve indicates that an electrical arc has been formed between two electrodes of a reaction thruster.

3. The power supply circuit according to claim 1 , further comprising a controller configured to perform operations to close the switch responsive to a detection by the current detector of current flow through the unidirectional current valve at an end of the first period of time.

4. The power supply circuit according to claim 1 , wherein closure of the switch is determined to have not occurred when current flow through the unidirectional current valve is still detected at a beginning of the second period of time.

5. A power supply circuit, comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the second power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time; and

a controller configured to perform operations to cause the power supply circuit to take at least one remedial measure responsive to a determination by the current detector that closure of the switch did not occur at a beginning of the second period of time.

6. The power supply circuit according to claim 5 , wherein the at least one remedial measure comprises ceasing a supply of power to the load.

7. The power supply circuit according to claim 1 , wherein the current detector comprises a current sense transformer with a saturating transformer core.

8. A power supply circuit, comprising:

a first power source configured to configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the second power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time;

wherein the current detector determines whether the second period of time has commenced and whether the switch has closed;

wherein the current detector comprises a current sense transformer with a saturating transformer core; and

wherein the current detector is configured to detect arc initiation of a reaction thruster based on saturation of the saturating transformer core.

9. A power supply circuit, comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the second power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time;

wherein the current detector determines whether the second period of time has commenced and whether the switch has closed;

wherein the current detector comprises a current sense transformer with a saturating transformer core; and

wherein the current detector is configured to detect closure of the switch based on a reset of the saturating transformer core.

10. A power supply circuit, comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the second power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time;

wherein the current detector determines whether the second period of time has commenced and whether the switch has closed; and

wherein the current detector produces arc detection on a separate output terminal pair than switch closure detection.

11. The power supply circuit according to claim 10 , wherein the current detector comprises

a transformer,

a diode bridge connected to the transformer,

a plurality of resistors connected to respective diodes of the diode bridge, and

a plurality of comparators, each having a non-inverting input terminal connected to a respective one of the plurality of resistors and an inverting terminal connected to a reference voltage supply.

12. A system, comprising:

a reaction thruster; and

a thruster power supply circuit comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the first power source;

a current detector in series with the unidirectional current valve such that (i) the unidirectional current valve resides between the second power source and the current detector, and (ii) current flows from the unidirectional current valve in a direction towards the current detector;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time; and

wherein the current detector determines whether the second period of time has commenced and determines whether the switch has closed based on generation of a negative pulse by the current detector.

13. The system according to claim 12 , further comprising a controller configured to perform operations to close the switch responsive to a detection by the current detector of current flow through the unidirectional current valve at an end of the first period of time.

14. The system according to claim 12 , wherein closure of the switch is determined to have occurred when an absence of current flow through the unidirectional current valve is detected at a beginning of the second period of time, and closure of the switch is determined to have not occurred when current flow through the unidirectional current valve is still detected at the beginning of the second period of time.

15. A system, comprising:

a reaction thruster; and

a thruster power supply circuit comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the first power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time; and

a controller configured to perform operations to cause the thruster power supply circuit to take at least one remedial measure responsive to a determination by the current detector that closure of the switch did not occur at a beginning of the second period of time.

16. The system according to claim 12 , wherein the current detector comprises a current sense transformer with a saturating transformer core.

17. A system, comprising:

a reaction thruster; and

a thruster power supply circuit comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the first power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time; and

wherein the current detector determines whether the second period of time has commenced and whether the switch has closed;

wherein the current detector comprises a current sense transformer with a saturating transformer core; and

wherein the current detector is configured to detect arc initiation of a reaction thruster based on saturation of the saturating transformer core.

18. A system, comprising:

a reaction thruster; and

a thruster power supply circuit comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the first power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time; and

wherein the current detector determines whether the second period of time has commenced and whether the switch has closed;

wherein the current detector comprises a current sense transformer with a saturating transformer core; and

wherein the current detector is configured to detect closure of the switch based on a reset of the saturating transformer core.

19. A system, comprising:

a reaction thruster; and

a thruster power supply circuit comprising:

a first power source configured to supply a first current to a load during a first period of time;

a second power source configured to supply a second current to the load during a second period of time;

a unidirectional current valve in series with the first power source;

a current detector in series with the unidirectional current valve;

a switch in parallel with a series combination of the current detector and the unidirectional current valve to bypass the unidirectional current valve during the second period of time;

wherein the current detector determines whether the second period of time has commenced and whether the switch has closed; and

wherein the current detector produces arc detection on a separate output terminal pair than switch closure detection.

Assignments (3)
TERMINATION AND RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jul 28, 2023
From: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
To: AEROJET ROCKETDYNE, INC.
Reel/Frame 064424/0098 →
NOTICE OF GRANT OF SECURITY INTEREST IN PATENTS Recorded Sep 27, 2018
From: AEROJET ROCKETDYNE, INC.
To: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT
Reel/Frame 047570/0964 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 19, 2016
From: MADIGAN, MICHAEL; KRISTALINSKI, ALEXANDR L.; KOCH, BRIAN
To: AEROJET ROCKETDYNE, INC.
Reel/Frame 040063/0172 →
Continuity (1)
Related Publication 20170074252A1 · Mar 16, 2017