Method for producing a forged crankshaft

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,350,671
App. No.
15/325,101
Granted
Jul 16, 2019
Kind
B2
Abstract

A method for producing a forged crankshaft includes: a preforming step of forming a preformed blank with no flash, the preformed blank including a shape of the crankshaft, wherein the crank arm have excess projecting portions at an outer peripheries of side portions of the crank arm near the crank pin; a die forging step of forming a forged blank with flash by pressing the preformed blank with a pair of first dies; and a trimming step of removing the flash from the forged blank. In the die forging step, while a second die is abutted against a journal-side surface of the crank arm and holds the surface, the excess projecting portions of the crank arm are deformed by the first dies so as to increase the side portions of the crank arm in thickness.

Claims (20)

1. A method for producing a forged crankshaft, the crankshaft including: journals that define a center of rotation; crank pins that are eccentric with respect to the journals; and crank arms, each of the crank arms connecting a corresponding one of the journals to a corresponding one of the crank pins,

the method comprising:

a preforming step of forming a preformed blank with no flash, the preformed blank including a shape of the crankshaft, wherein the crank arm has an excess projecting portion at an outer periphery of each of side portions near the crank pin, the excess projecting portion projecting from the outer periphery;

a die forging step of forming a forged blank with flash by pressing the preformed blank formed in the preforming step with a pair of first dies; and

a trimming step of removing the flash from the forged blank formed in the die forging step, wherein:

in the die forging step, while a second die is abutted against an area in a surface of the crank arm to hold the area, the surface being adjacent to the journal, the area not including areas of the side portions of the preformed blank, deforming the excess projecting portions of the crank arm by the first dies so as to increase the side portions of the crank arm in thickness.

2. The method for producing a forged crankshaft according to claim 1 , wherein

the second die includes a guide groove so that excess material flowing out to be formed into the flash during the pressing in the die forging step is guided through the guide groove.

3. The method for producing a forged crankshaft according to claim 1 , wherein

during the pressing in the die forging step, the second die is moved in a pressing direction such that the second die is positioned in a center of a space between the paired first dies.

4. The method for producing a forged crankshaft according to claim 2 , wherein

during the pressing in the die forging step, the second die is moved in a pressing direction such that the second die is positioned in a center of a space between the paired first dies.

5. The method for producing a forged crankshaft according to claim 1 , wherein

every crank arm of the crankshaft has a counterweight.

6. The method for producing a forged crankshaft according to claim 5 , wherein

with regard to each and every one of the crank arms, the side portions of the crank arm increase in thickness.

7. The method for producing a forged crankshaft according to claim 1 , wherein

some crank arms of the crankshaft each have a counterweight.

8. The method for producing a forged crankshaft according to claim 7 , wherein

only with regard to the crank arms having the counterweight, the side portions of the crank arm having the counterweight increase in thickness.

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 10, 2017
From: TAMURA, KENJI; OKUBO, JUNICHI; ISHIHARA, KOICHIRO; YOSHINO, KEN; YABUNO, KUNIHIRO; KUROKAWA, HIROYUKI; YAMASHITA, TOMOHISA; TAKAMOTO, SHO
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 040914/0868 →