IP Library Granted Patent US 9,988,646
Granted Patent B2
US 9,988,646 · App. 15/338,413 · Granted Jun 5, 2018

Methods of anaerobic digestion of biomass to produce biogas

Inventors: Surya Raja Pidaparti (Maple Grove, MN); Jeffrey Ray Zierdt (Monticello, MN); Joseph Philip Burke (Edina, MN)
Assignee: Viresco AD, LLC
C12P5/023C12M21/04C12M23/36C12M23/52C12M25/16C12M29/00C12M41/00C12M41/28C12M41/48C12M45/02C12M45/04C12M45/06Y02E50/343
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,988,646
App. No.
15/338,413
Granted
Jun 5, 2018
Kind
B2
Abstract

Improved methods for anaerobic digestion of organic matter to produce biogas. Among the improvements given are including ferric iron in a hydrolysis reactor to increase the rate and efficiency of anaerobic hydrolysis to provide substrates for methanogenesis. A solids separation step is added after hydrolysis and before methanogenesis to improve the efficiency of the methanogenesis step. Other improvements involve using separate tanks for the hydrolysis and methanogenesis stages and using two (or more) methanogenesis tanks in sequence, and switching the order of the two (or more) methanogenesis tanks periodically.

Claims (30)

1. A method of producing biogas comprising:

(a)(i) transferring an organic substrate to a hydrolysis tank;

(a)(ii) hydrolyzing the substrate in anaerobic condition in a hydrolysis tank to produce a hydrolysis liquid effluent;

(b)(i) transferring the hydrolysis liquid effluent for a period of time 1 to a methanogenesis tank 1 comprising fixed film methanogens or granular methanogens and producing biogas and methanogenesis tank 1 liquid effluent;

wherein the hydrolysis tank and methanogenesis tank 1 each have a recirculation loop and one or more instrument detectors for monitoring one or more parameters of the liquid in the tank in the recirculation loop, and the method comprises recirculating liquid from each tank back into the same tank through the recirculation loop for that tank, and monitoring one or more parameters in each tank with the one or more instrument detectors in the recirculation loop of that tank, wherein the parameters are selected from the group consisting of pH, ORP, ionic strength, chemical oxygen demand, and dissolved methane concentration; wherein each recirculation loop has at least one valve separating the recirculation loop from its tank, and the at least one valve can be closed to allow the one or more instrument detectors to be removed for cleaning or service without allowing air to contact liquid in the tank connected to the recirculation loop.

2. The method of claim 1 wherein step (a)(i) comprises:

(a)(i)(a) grinding an organic substrate comprising solids to produce smaller solids particles;

(a)(i)(b) transferring the substrate with smaller solids particles to a hydrolysis tank.

3. The method of claim 1 wherein step (a)(ii) comprises hydrolyzing the substrate in anaerobic condition in a hydrolysis tank comprising Fe 3+ particles.

4. The method of claim 2 wherein step (a)(ii) comprises

(a)(ii)(a) transferring effluent from the hydrolysis tank to a solids separator

(a)(ii)(b) separating solids from the hydrolysis effluent to produce a solids fraction and a liquid hydrolysis effluent.

5. The method of claim 4 wherein the step of separating solids uses a solids separator that is a screw type solids separator.

6. The method of claim 1 further comprising after step (b)(i):

(b)(ii) transferring the methanogenesis tank 1 liquid effluent to a methanogenesis tank 2 comprising fixed film methanogens or granular methanogens during period of time 1 and producing biogas and methanogenesis tank 2 liquid effluent in methanogenesis tank 2;

(b)(iii) discharging methanogenesis tank 2 liquid effluent during period of time 1;

(c) and then switching the order of methanogenesis tanks 1 and 2 and

(c)(i) transferring the liquid hydrolysis effluent for a period of time 2 to said methanogenesis tank 2 and producing biogas and methanogenesis tank 2 liquid effluent;

(c)(ii) transferring the methanogenesis tank 2 liquid effluent to said methanogenesis tank 1 during period of time 2 and producing biogas and methanogenesis tank 1 liquid effluent in methanogenesis tank 1; and

(c)(iii) discharging methanogenesis tank 1 liquid effluent during period of time 2;

wherein the methanogenesis tank 2 has a recirculation loop and one or more instrument detectors for monitoring one or more parameters of the liquid in the tank in the recirculation loop, and the method comprises recirculating liquid from each tank back into the same tank through the recirculation loop for that tank, and monitoring one or more parameters in each tank with the one or more instrument detectors in the recirculation loop of that tank, wherein the parameters are selected from the group consisting of pH, ORP, ionic strength, chemical oxygen demand, and dissolved methane concentration; wherein each recirculation loop has at least one valve separating the recirculation loop from its tank, and the at least one valve can be closed to allow the one or more instrument detectors to be removed for cleaning or service without allowing air to contact liquid in the tank connected to the recirculation loop.

7. The method of claim 6 further comprising:

(d) switching the order of methanogenesis tanks 1 and 2 and repeating steps (b)(i), (b)(ii), and (b)(iii).

8. The method of claim 6 wherein the period of time 1 and the period of time 2 are each between 6 and 24 hours inclusive.

9. The method of claim 6 wherein the method comprises monitoring oxidization-reduction potential (ORP) in methanagenesis tank 1 and/or methanogenesis tank 2, wherein the methanogenesis tank receiving the hydrolysis liquid effluent is the lead methanogenesis tank, and the other methanogenesis tank, receiving methanogenesis tank liquid effluent from the lead methanogenesis tank, is the lag methanogenesis tank, wherein the switching step (c) occurs when the ORP in the lead methanogenesis tank rises to a preset value or the ORP in the lag methanogenesis tank falls to a preset value.

10. The method of claim 9 wherein the switching step (c) occurs when the ORP in the lead methanogenesis tank rises to a preset value between about −400 and −300 mV or the ORP in the lag methanogenesis tank falls to a preset value between about −450 and −550 mV.

11. The method of claim 6 wherein time period 1 and time period 2 are preset time periods.

12. The method of claim 1 further comprising:

(d) passing the biogas produced in methanogenesis tank 1 through a foam trap to trap foam and separate it from the biogas; and

(e) collecting the biogas downstream of the foam trap.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 20, 2019
From: PIDAPARTI, SURYA; ZIERDT, JEFF; BURKE, JOE
To: NOVUS ENERGY, LLC
Reel/Frame 050443/0436 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 26, 2018
From: NOVUS ENERGY, L.L.C.
To: VIRESCO AD, LLC
Reel/Frame 045039/0259 →
SECURITY INTEREST Recorded Dec 15, 2017
From: NOVUS ENERGY, L.L.C.; NOVUS-PACIFIC, L.L.C.
To: TRUBLU MANAGEMENT LLC
Reel/Frame 044409/0592 →
Continuity (3)
Division 14027121 · Sep 13, 2013
Provisional Application 61700743 · Sep 13, 2012
Related Publication 20170044573A1 · Feb 16, 2017