IP Library Granted Patent US 10,345,193
Granted Patent B2
US 10,345,193 · App. 15/371,419 · Granted Jul 9, 2019

Bearing gauge arrangement

Inventor: Jeppe Jakobsen (Brande, DK)
Assignee: SIEMENS GAMESA RENEWABLE ENERGY A/S
G01M13/04F16C19/364G01B7/144F16C2233/00F16C2360/31
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,345,193
App. No.
15/371,419
Granted
Jul 9, 2019
Kind
B2
Abstract

A bearing gauge arrangement including a holding frame dimensioned to replace a load-carrying element between an inner race and an outer race of a bearing, at least one distance gauge arranged in the holding frame to measure a distance between the inner race and the outer race during operation of the bearing, and an evaluation unit configured to evaluate measurements from a distance gauge relative to a bearing reference dimension. A generator including a main bearing between rotor and stator, and a bearing gauge arrangement, and a method of detecting a deformation of a bearing is also provided.

Claims (24)

1. A bearing gauge arrangement comprising:

a holding frame dimensioned to replace a load-carrying element between an inner race and an outer race of a bearing;

at least one distance gauge arranged in the holding frame to measure a distance between the inner race and the outer race during operation of the bearing; and

an evaluation unit configured to evaluate measurements from a distance gauge relative to a bearing reference dimension.

2. The bearing gauge arrangement according to claim 1 , wherein a position of a distance gauge is fixed relative to the holding frame.

3. The bearing gauge arrangement according to claim 1 , wherein a position of the holding frame is fixed relative to a bearing ring.

4. The bearing gauge arrangement according to claim 1 , further comprising two distance gauges.

5. The bearing gauge arrangement according to claim 1 , wherein a distance gauge comprises a displacement transducer.

6. The bearing gauge arrangement according to claim 1 , further comprising a wireless interface between the distance gauge and the evaluation unit.

7. The bearing gauge arrangement according to claim 1 , further comprising at least one spring-loaded contact against a raceway surface.

8. The bearing gauge arrangement according to claim 1 , wherein the holding frame is constructed to fit within a bearing roller cage.

9. The bearing gauge arrangement according to claim 1 , wherein the evaluation unit is configured to relate a distance gauge measurement to a point along the bearing circumference.

10. The bearing gauge arrangement according to claim 1 , wherein the evaluation unit also receives data relating to an external bearing load, and is configured to identify a relationship between a bearing deformation and the external bearing load.

11. A wind turbine generator assembly, comprising: a bearing between a rotor and a stator, and a bearing gauge arrangement according to claim 1 arranged such that the holding frame of the bearing gauge arrangement replaces a load-carrying element of the bearing.

12. The generator assembly according to claim 11 , wherein the bearing comprises a tapered roller bearing.

13. The generator assembly according to claim 11 , wherein the bearing comprises a double-row roller bearing.

14. A method of detecting a deformation of a bearing, comprising:

providing a bearing gauge arrangement with a plurality of distance gauges in a holding frame, dimensioned according to a rolling element of the bearing;

substituting a rolling element of the bearing by the holding frame;

applying the plurality of distance gauges to measure distance between an inner race and an outer race of the bearing during operation of the bearing; and

evaluating the measurements relative to a bearing reference dimension.

15. The method according to claim 14 , further comprising: evaluating the measurements prior to an installation procedure;

performing the installation procedure; and

evaluating the measurements after the installation procedure.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 048003/0631 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 2, 2017
From: SIEMENS WIND POWER A/S
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 041157/0139 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 1, 2017
From: JAKOBSEN, JEPPE
To: SIEMENS WIND POWER A/S
Reel/Frame 041144/0134 →
Priority Claims (1)
EP 16156317 · Feb 18, 2016 · regional
Continuity (1)
Related Publication 20170241865A1 · Aug 24, 2017
Cited By (1)
US 12,194,622