IP Library Granted Patent US 9,885,171
Granted Patent B2
US 9,885,171 · App. 15/373,830 · Granted Feb 6, 2018

Corrugated stormwater chamber having sub-corrugations

Inventors: David J. Mailhot (Coventry, CT); Nimish Gandhi (Wethersfield, CT); Timothy J. McGrath (Arlington, MA)
Assignee: Stormtech LLC
E03F1/003E02B11/005
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 9,885,171
App. No.
15/373,830
Granted
Feb 6, 2018
Kind
B2
Abstract

A chamber is disclosed. The chamber may include a base, a plurality of alternating crest corrugations and valley corrugations running transverse to a length of the chamber, wherein the crest corrugations decrease in width with elevation from the base, and the valley corrugations increase in width with elevation from the base, at least one crest sub-corrugation running along at least a portion of a crest corrugation, at least one valley sub-corrugation running along at least a portion of a valley corrugation an end crest corrugation positioned at a terminal end of the chamber, and an end crest sub-corrugation running along at least a portion of the end crest corrugation.

Claims (37)

1. A chamber, comprising:

a base;

a plurality of alternating crest corrugations and valley corrugations running transverse to a length of the chamber, wherein the crest corrugations decrease in width with elevation from the base, and the valley corrugations increase in width with elevation from the base;

at least one crest sub-corrugation running along at least a portion of a crest corrugation;

at least one valley sub-corrugation running along at least a portion of a valley corrugation, wherein the at least one valley sub-corrugation includes a constant width along the entire valley sub-corrugation;

an end crest corrugation positioned at a terminal end of the chamber; and

an end crest sub-corrugation running along at least a portion of the end crest corrugation.

2. The chamber of claim 1 , wherein the end crest corrugation includes a substantially constant width.

3. The chamber of claim 1 , wherein the end crest corrugation includes a tapering width.

4. The chamber of claim 1 , wherein the end crest corrugation includes a height less than a height of the crest corrugations.

5. The chamber of claim 1 , wherein the end crest sub-corrugation is positioned along a top portion of the end crest corrugation.

6. The chamber of claim 1 , wherein the end crest sub-corrugation includes terminal ends positioned above the base.

7. The chamber of claim 1 , wherein the end crest sub-corrugation includes terminal ends positioned at the base.

8. The chamber of claim 1 , wherein the end crest sub-corrugation includes a substantially constant width.

9. The chamber of claim 1 , wherein the end crest sub-corrugation includes a tapering width.

10. The chamber of claim 1 , wherein the end crest sub-corrugation includes a tapering height.

11. The chamber of claim 1 , wherein the end crest sub-corrugation includes a substantially constant height.

12. The chamber of claim 1 , wherein the at least one valley sub-corrugation includes a tapering height towards the base.

13. A chamber, comprising:

a base;

a plurality of alternating crest corrugations and valley corrugations running transverse to a length of the chamber, wherein the crest corrugations decrease in width with elevation from the base, and the valley corrugations increase in width with elevation from the base;

at least one valley sub-corrugation running along a valley corrugation from the base of the chamber, wherein a width of the at least one valley sub-corrugation is constant along the entire valley sub-corrugation;

an end crest corrugation positioned at a terminal end of the chamber; and

an end crest sub-corrugation running along a portion of the end crest corrugation.

14. The chamber of claim 13 , wherein the valley sub-corrugation includes a tapering height.

15. The chamber of claim 13 , wherein the end crest sub-corrugation includes terminal ends positioned above the base.

16. A chamber system, comprising:

a chamber including:

a base;

a plurality of alternating crest corrugations and valley corrugations running transverse to a length of the chamber, wherein the crest corrugations decrease in width with elevation from the base, and the valley corrugations increase in width with elevation from the base;

at least one valley sub-corrugation running along a valley corrugation from the base of the chamber, wherein the at least one valley sub-corrugation includes a constant width along the entire valley sub-corrugation;

an end crest corrugation positioned at a terminal end of the chamber; and

an end crest sub-corrugation running along at least a portion of the end crest corrugation; and

an end cap coupled to the chamber, the end cap including a flange configured to overlap the end crest corrugation of the chamber.

17. The chamber system of claim 16 , wherein the flange of the end cap includes a recess having a protrusion configured to engage the end crest sub-corrugation.

18. The chamber system of claim 17 , wherein the protrusion is shaped to follow contours of the end crest corrugation and the end crest sub-corrugation.

19. The chamber system of claim 17 , wherein the protrusion is configured to abut against the end crest sub-corrugation to couple together the chamber and the end cap.

Assignments (1)
SECURITY INTEREST Recorded Dec 13, 2019
From: ADVANCED DRAINAGE SYSTEMS, INC.
To: BARCLAYS BANK PLC, AS ADMINISTRATIVE AGENT
Reel/Frame 051287/0273 →
Continuity (4)
Continuation 14175477 · Feb 7, 2014
Continuation In Part 12802483 · Jun 7, 2010
Provisional Application 61217905 · Jun 5, 2009
Related Publication 20170089054A1 · Mar 30, 2017