IP Library Granted Patent US 10,685,754
Granted Patent B2
US 10,685,754 · App. 15/451,643 · Granted Jun 16, 2020

Integration of real-time measurements and atomistic modeling to license nuclear components

Inventors: Edward J. Lahoda (Edgewood, PA); Sumit Ray (Columbia, SC)
Assignee: Westinghouse Electric Company LLC
G21D3/001G06F30/20G21D3/04G21C17/00Y02E30/40
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,685,754
App. No.
15/451,643
Granted
Jun 16, 2020
Kind
B2
Abstract

An improved testing and data gathering method is described herein with reference to testing a new fuel, as an exemplary component to be tested for licensure purposes. The method includes generally: generating models for the new system; making samples and getting them accepted for a reactor; and testing the samples in a test or commercial reactor until the exposure time is reached for the expected cycle length of the fuel at final use. The method is preferably done concurrent to submitting a license application for commercial use of the new component to the relevant government body to expedite license testing review.

Claims (16)

1. A process for demonstrating parameters required for licensure of components for use in a nuclear reactor comprising:

preparing a computer generated atomistic model of at least one physical property of a component and a computer generated model predicting the behavior of the component under conditions of interest in the operation of a nuclear reactor;

preparing and submitting a preliminary application for license of the component to a regulatory body responsible for approval of use of the component in a nuclear reactor based on the computer generated physical property and behavior models;

placing at least one component samples in a nuclear reactor;

placing sensors in the nuclear reactor to monitor parameters of interest during operation of the nuclear reactor;

operating the nuclear reactor for a predetermined reactor cycle time;

retrieving data from the sensors in the reactor in real time during the cycle time for instantaneous analysis of the parameters of interest;

comparing the real-time data to the physical property and component behavior models;

applying the compared real-time data and physical property and component behavior models to (i) validate the models and component predictions based on the models when the retrieved real-time data conforms to the model predictions, or (ii) adjusting the computer generated models and component predictions to incorporate and conform to the retrieved real-time data during and prior to completion of the reactor cycle time when the retrieved real-time data does not conform to the model predictions;

when adjusted computer generated models and component predictions are generated, repeating the data retrieving, comparing real-time data and using the compared real-time data steps during the cycle time until the models and component behavior predictions are validated;

communicating with the regulatory body to advance and complete the application for license of the component during and prior to completion of the cycle time based on the validated real-time data and physical property and component behavior models.

2. The process recited in claim 1 wherein the component is nuclear fuel.

3. The process recited in claim 1 wherein the component is a safety related component in a nuclear power plant.

4. The process recited in claim 1 wherein the parameters of interest are selected from the group consisting of pressure, temperature, change in component volume, stress and strain tension, energy, heat capacities, thermal conductivity, fission gas release, fuel swelling, fuel melting point, and combinations thereof.

5. The process recited in claim 1 wherein the conditions of interest in the operation of a nuclear reactor are selected from normal and accident conditions and combinations thereof.

6. The process recited in claim 1 wherein the sensors are selected from the group consisting of thermocouples, thereto-acoustic sensors, vacuum micro-electronic devices, spark gap transmitters, strain gauges, motion sensors, melting point sensors, neutron flux sensors, power sensors, and combinations thereof.

Assignments (5)
RELEASE OF SECURITY INTEREST IN PATENTS Recorded Jan 30, 2024
From: BANK OF MONTREAL, AS COLLATERAL AGENT
To: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC
Reel/Frame 066380/0599 →
SECURITY INTEREST Recorded Jan 26, 2024
From: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC; STONE & WEBSTER, L.L.C. (FORMERLY STONE & WEBSTER, INC.)
To: DEUTSCHE BANK AG NEW YORK BRANCH, AS COLLATERAL AGENT
Reel/Frame 066373/0604 →
PATENT SECURITY AGREEMENT Recorded May 27, 2022
From: WESTINGHOUSE ELECTRIC COMPANY LLC; BHI ENERGY I SPECIALTY SERVICES LLC
To: BANK OF MONTREAL, AS COLLATERAL AGENT
Reel/Frame 060791/0372 →
CONFIRMATORY LICENSE Recorded Nov 7, 2017
From: WESTINGHOUSE ELECTRIC COMPANY, LLC
To: UNITED STATES DEPARTMENT OF ENERGY
Reel/Frame 044052/0815 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2017
From: LAHODA, EDWARD J.; RAY, SUMIT
To: WESTINGHOUSE ELECTRIC COMPANY LLC
Reel/Frame 041482/0944 →