IP Library Granted Patent US 10,739,494
Granted Patent B2
US 10,739,494 · App. 15/463,747 · Granted Aug 11, 2020

Electroseismic surveying in exploration and production environments

Inventors: Arthur Thompson (Houston, TX); Alan Katz (Dallas, TX); Robert England (Flower Mound, TX); Todd W. Benson (Dallas, TX); Mark Griffin (Dallas, TX)
Assignee: EX Explore, L.L.C.
G01V11/007E21B49/00G01V1/181G01V1/20G01V1/28G01V1/306G01V1/40G01V2210/32G01V2210/62G01V2210/624G01V2210/6224G01V2210/6244G01V2210/6246
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,739,494
App. No.
15/463,747
Granted
Aug 11, 2020
Kind
B2
Abstract

Systems, methods, and computer programs for monitoring production of fluids from a subterranean formation includes receiving, from a first sensor array at a first time, a first set of electromagnetic signals generated by an electroseismic or seismoelectric conversion of seismic signals caused, at least in part, by the production of fluid from the subterranean formation; receiving, from the first sensor array at a second time, a second set of electromagnetic signals generated by an electroseismic or seismoelectric conversion of seismic signals caused, at least in part, by the production of fluid from the subterranean formation; and determining one or more reservoir properties based, at least in part, on the first and second sets signals received from the first sensor array. The first sensor array are arranged to monitor the production operation.

Claims (54)

1. A method for monitoring production of fluids from a subterranean formation, the method comprising:

receiving, from a first sensor array at a first time, a first set of electromagnetic signals generated by an electroseismic or seismoelectric conversion of seismic signals caused, at least in part, by the production of fluid from the subterranean formation;

receiving, from the first sensor array at a second time, a second set of electromagnetic signals caused by a seismic wave and generated by an electroseismic or seismoelectric conversion of seismic signals caused by the production of fluid from the subterranean formation;

determining one or more reservoir properties based, at least in part, on the first and second sets signals received from the first sensor array;

wherein the production of fluids from the subterranean formation causes the movement of the fluids in the subterranean formation that, in turn, generates one or more seismic signals and further wherein the one or more electromagnetic signals are caused by electroseismic or seismoelectric conversion of the one or more seismic signals;

and wherein the first sensor array is located above the water table.

2. The method of claim 1 , wherein determining one or more reservoir properties based, at least in part, on the first and second sets signals received from the first sensor array further comprises:

determining one or more zones of production based, at least in part, on the first and second sets signals received from the first sensor array.

3. The method of claim 2 , wherein determining one or more zones of production is further based, at least in part, on one or more seismic surveys of the subterranean formation.

4. The method of claim 2 , wherein determining one or more zones of production is further based, at least in part, on one or more production surveys.

5. The method of claim 1 , wherein determining one or more reservoir properties based, at least in part, on the first and second sets signals received from the first sensor array further comprises:

determining one or more delineations of one or more reservoirs based, at least in part, on the first and second sets signals received from the first sensor array.

6. The method of claim 1 , further comprising:

receiving, from a reference sensor located at the wellhead at the third time, a third set of electromagnetic signals; and

determining a reservoir property based, at least in part, on the first and third sets of electromagnetic signals.

7. The method of claim 6 , further comprising:

performing a cross correlation of the first set of electromagnetic signals with the third set of electromagnetic signals.

8. The method of claim 1 , wherein determining a reservoir property based, at least in part, on the first and second sets of electromagnetic signals further comprises:

determining a connectedness of a reservoir interval based, at least in part, on the first and second sets of electromagnetic signals.

9. The method of claim 1 , wherein determining a reservoir property based, at least in part, on the first and second sets of electromagnetic signals further comprises:

measuring a flow rate of fluid in the subterranean formation.

10. A method for monitoring a subsurface formation, the method comprising:

receiving, from a first sensor array, one or more seismic signals, wherein production of fluids from the subsurface formation causes movement of the fluids in the subsurface formation that, in turn, generates the one or more seismic signals;

receiving, from the first sensor array, one or more electromagnetic signals wherein the one or more electromagnetic signals are caused by electroseismic or seismoelectric conversion of the one or more seismic signals;

determining a property of the subsurface formation based, at least in part, on the signals received from the first sensor array; and

wherein the first sensor array of seismic sensors is located above the water table.

11. The method of claim 10 , wherein determining a property of the subsurface formation based, at least in part, on the signals received from the first sensor array includes:

determining an amount of fluid produced at a location based, at least in part, on the signals received from the first sensor array.

12. The method of claim 10 , further comprising:

altering the production operation based on the determined property of the subsurface formation.

13. The method of claim 10 , further comprising:

receiving, from an array of sensors at a first time, a first set of electromagnetic signals generated by an electroseismic or seismoelectric conversion of seismic signals caused, at least in part, by the production of fluid from the subterranean formation;

receiving, from the array of sensors at a second time, a second set of electromagnetic signals generated by an electroseismic or seismoelectric conversion of seismic signals caused, at least in part, by the production of fluid from the subterranean formation;

monitoring the production of fluids from the subterranean formation based, at least in part, on the first and second sets signals received from the first sensor array;

and wherein the array of sensors are arranged to monitor the production operation.

14. The method of claim 10 , wherein the sensors in the array of sensors include an electrode configured to be electrically coupled to a ground, the electrode responsive to a vertical electromagnetic signal, the vertical electromagnetic signal generated by a subsurface earth formation in response to an electroseismic or seismoelectric conversion of a passive electromagnetic source signal.

15. The method of claim 10 , wherein the subterranean formation includes a fluid, the method further comprising:

injecting the subterranean formation with a flooding agent; and

determining an interface between the fluid and the flooding agent based, at least in part, on the first and second sets signals received from the first sensor array.

16. The method of claim 10 , wherein the subterranean formation includes a fluid, the method further comprising:

determining an amount of fluids that can be produced from the subterranean formation based, at least in part, on the first and second sets signals received from the first sensor array.

17. The method of claim 10 , further comprising:

detecting bypassed fluids in the subterranean formation based, at least in part, on the first and second sets signals received from the first sensor array.

18. The method of claim 17 , further comprising:

performing one or more infill or step out drilling operations based on the detected bypassed fluids in the subterranean formation.

19. The method of claim 10 , further comprising:

detecting unintended fluid migration in the subterranean formation based, at least in part, on the first and second sets signals received from the first sensor array.

20. A system comprising:

a first sensor array to detect one or more electromagnetic signals, wherein the first sensor array is located above the water table;

a processor;

a memory comprising non-transitory executable instructions, that, when executed cause the processor to:

receive, from the first sensor array at a first time, a first set of electromagnetic signals generated by an electroseismic or seismoelectric conversion of seismic signals caused by the production of fluid from the subterranean formation; receive, from the first sensor array at a second time, a second set of electromagnetic signals caused by a seismic wave and generated by an electroseismic or seismoelectric conversion of seismic signals caused by the production of fluid from the subterranean formation;

determine one or more reservoir properties based, at least in part, on the first and second sets signals received from the first sensor array; and

wherein the production of fluids from the subterranean formation causes the movement of the fluids in the subterranean formation that, in turn, generates one or more seismic signals and further wherein the one or more electromagnetic signals are caused by electroseismic or seismoelectric conversion of the one or more seismic signals.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 1, 2017
From: HUNT ENERGY ENTERPRISES, L.L.C.
To: ES XPLORE, L.L.C.
Reel/Frame 043157/0744 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 18, 2017
From: THOMPSON, ARTHUR; KATZ, ALAN; ENGLAND, ROBERT; BENSON, TODD W.; GRIFFIN, MARK
To: HUNT ENERGY ENTERPRISES, L.L.C.
Reel/Frame 042425/0515 →
Continuity (4)
Continuation 14512931 · Oct 13, 2014
Provisional Application 61891096 · Oct 15, 2013
Provisional Application 61890682 · Oct 14, 2013
Related Publication 20170261643A1 · Sep 14, 2017
Cited By (1)
US 12,416,623