IP Library Granted Patent US 10,287,924
Granted Patent B2
US 10,287,924 · App. 15/507,103 · Granted May 14, 2019

Combined heat and power plant for the decentralized supply of electricity and heat

Inventors: Uwe Lenk (Zwickau, DE); Jochen Schaefer (Nuremberg, DE); Alexander Termel (Moehrendorf, DE); Nicolas Vortmeyer (Erlangen, DE)
Assignee: SIEMENS AKTIENGESELLSCHAFT
F01K23/065F01K3/02H01M10/3909H01M10/399H01M10/615H01M10/627H01M10/6561H01M10/66H01M10/663H01M16/006F02G5/02H01M2220/10Y02E20/14Y02P80/15Y02T10/166
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,287,924
App. No.
15/507,103
Granted
May 14, 2019
Kind
B2
Abstract

A combined heat and power plant for the decentralized supply of power and of heat may include at least one prime mover for providing electrical energy while providing waste gas, at least one thermal store for storing thermal energy provided by the waste gas, and at least one high-temperature battery in which the electrical energy provided by the prime mover can be stored. The high-temperature battery can be supplied by the waste gas provided by the prime mover to keep the high-temperature battery warm.

Claims (18)

1. A combined heat and power plant for the decentralized supply of electricity and heat, the combined heat and power plant comprising:

an engine configured to provide electrical energy while providing exhaust gas,

a thermal store configured to store thermal energy provided by the exhaust gas,

a high-temperature battery configured to store the electrical energy provided by the engine,

wherein the exhaust gas provided by the engine is supplied to the high-temperature battery to warm the high-temperature battery, and

an electrical heating device configured to heat the thermal store,

wherein the electrical heating device is electrically connected to the high-temperature battery, and is supplied and operated with electrical energy stored in the high-temperature battery.

2. The combined heat and power plant of claim 1 , wherein the electrical heating device is integrated into the thermal store.

3. The combined heat and power plant of claim 1 , comprising a heat exchanger configured to transfer thermal energy from the exhaust gas to the thermal store, with cooling of the exhaust gas,

herein the heat exchanger is arranged between the engine and the high-temperature battery along a flow direction of the exhaust gas.

4. The combined heat and power plant of claim 1 , comprising a further heat exchanger con-figured to transfer the thermal energy provided by the exhaust gas to the thermal store,

wherein the further heat exchanger is arranged down-stream from the high-temperature battery along the flow direction of the exhaust gas.

5. The combined heat and power plant of claim 1 , comprising at least one electrical heating element configured to heat the high-temperature battery.

6. The combined heat and power plant of claim 5 , wherein the electrical heating element is electrically connected to the high-temperature battery and is supplied and operated with electrical energy stored in the high-temperature battery.

7. The combined heat and power plant of claim 1 , comprising a fan configured to generate a gas stream,

wherein the high-temperature battery is supplied with the gas stream to cool the high-temperature battery.

8. The combined heat and power plant of claim 1 , comprising a recirculation unit configured to return the exhaust gas from (a) a branch-off point disposed downstream from the high-temperature battery to (a) at least one of the high-temperature battery or an infeed point disposed upstream from the high-temperature battery.

9. The combined heat and power plant of claim 1 , comprising a control unit configured to detect a demand for electricity and for heat, and operate individual components of the combined heat and power plant to at least partially service the demand for electricity and for heat by the combined heat and power plant.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 5, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 056501/0020 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 27, 2017
From: LENK, UWE; SCHAEFER, JOCHEN; TREMEL, ALEXANDER; VORTMEYER, NICOLAS
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 041386/0243 →
Priority Claims (1)
DE 10 2014 217 114 · Aug 28, 2014 · national
Continuity (1)
Related Publication 20170248041A1 · Aug 31, 2017