IP Library Patent Application 15507829
Patent Application
App. No. 15/507,829

ARTICULATED TRAIN-TYPE RAIL VEHICLE

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/507,829
Abstract

A rail vehicle for transporting people, which is in the form of an articulated train-type multiple unit, includes at least two car bodies. Adjoining car bodies are supported on a common central running gear and end car bodies are additionally supported on end running gears. All of the running gears have a distance between the centers of the bogies of two adjoining running gears of from 18 to 21 m, and the end car bodies have a length of from 24 to 27 m.

Claims (12)

1 - 6 . (canceled)

7 . A rail vehicle in the form of an articulated train-type multiple unit for transporting people, the rail vehicle comprising:

at least two car bodies including adjacent car bodies and end car bodies, said end car bodies each having a length in a range of from 24 to 28 m;

common central running gears each supporting a respective two of said adjacent car bodies, and end running gears each additionally supporting a respective one of said end car bodies;

said running gears including bogies having centers, and all of said running gears defining a distance between said centers of said bogies of adjacent running gears of from 19 to 21 m.

8 . The rail vehicle according to claim 7 , wherein:

all of said running gears are equipped with internally mounted bogie frames having longitudinal supports, wheels and a transverse direction; and

said wheels of said running gears are situated further outside than said longitudinal supports in said transverse direction.

9 . The rail vehicle according to claim 7 , wherein said end car bodies have overhangs each extending from a center of a respective one of said end running gears to an end of the rail vehicle over a length of at least 5 m.

10 . The rail vehicle according to claim 9 , which further comprises heavy components including at least one of transformers, auxiliary systems or batteries being disposed at least partially in a vicinity of said overhangs of said end car bodies.

11 . The rail vehicle according to claim 7 , wherein said central running gears ( 11 ) each have more than two axles.

12 . The rail vehicle according to claim 11 , wherein said running gears have wheels with wheel diameters, and said wheel diameters of said central running gears are smaller than said wheel diameters of said end running gears.

Assignments (6)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2020
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS MOBILITY GMBH
Reel/Frame 052060/0205 →
CHANGE OF NAME Recorded Dec 17, 2019
From: SIEMENS MOBILITY GMBH
To: SIEMENS MOBILITY AUSTRIA GMBH
Reel/Frame 051322/0650 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 21, 2019
From: SIEMENS AG OESTERREICH
To: SIEMENS MOBILITY GMBH
Reel/Frame 049242/0941 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 16, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS MOBILITY GMBH
Reel/Frame 048079/0310 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2017
From: BILSTEIN-HEMMER, BERND; GLINKA, MARTIN; GOERNER, MICHAEL; GOTTWALD, MARC; KAMMLER, MICHAEL; PAFFRATH, KLAUS
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 041481/0495 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 7, 2017
From: KUETER, CHRISTIAN; TEICHMANN, MARTIN
To: SIEMENS AG OESTERREICH
Reel/Frame 041481/0555 →