IP Library Granted Patent US 10,394,228
Granted Patent B2
US 10,394,228 · App. 15/525,240 · Granted Aug 27, 2019

Component mounting line changeover support system and changeover support method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,394,228
App. No.
15/525,240
Granted
Aug 27, 2019
Kind
B2
Abstract

A combination of batch exchange carts that includes all of the feeders that supply components to be used in the post-changeover production from the multiple batch exchange units prepared in preparation space is decided based on the component information of feeders loaded on batch exchange carts used in the pre-changeover production and setup information of batch exchange carts that can be used for exchange memorized in memory device (component information of feeders loaded on batch exchange carts in preparation space), and then an operator is notified of the decided combination of batch exchange carts by sound or by the display of a mobile terminal or display device of production management computer.

Claims (25)

1. A component mounting line changeover support system for a component mounting line that mounts components on a circuit board using multiple component mounters lined up along a conveyance path of a circuit board, the component mounting line changeover support system comprising:

a batch exchange unit set on each of the multiple component mounters, the batch exchange unit being configured for batch exchanging multiple feeders that supply components or multiple suction nozzles that pick up the components and mount the components on the circuit board;

multiple exchange-use batch exchange units to be exchanged with the batch exchange units set on the component mounters;

a memorizing device configured to memorize setup information that is information of feeders or suction nozzles loaded on each of the multiple exchange-use batch exchange units used in a pre-changeover production; and

a changeover determining device configured to

acquire a list of the feeders and suction nozzles to be used in a post-changeover target job,

acquire the setup information from the memorizing device,

extract combinations of the setup information that include all of the feeders and suction nozzles to be used in the post-changeover target job,

calculate a production time for each extracted combination of the setup information,

decide an optimal combination of the setup information with a shortest production time, and

notify an operator of the optimal combination of batch exchange units that include all of the feeders or suction nozzles to be used in the post-changeover target job from among the multiple exchange-use batch exchange units.

2. The component mounting line changeover support system according to claim 1 , wherein

each of the batch exchange unit includes a cart provided with the feeders or suction nozzles.

3. A component mounting line changeover support method for a component mounting line that mounts components on a circuit board using multiple component mounters lined up along a conveyance path of a circuit board, the component mounting line changeover support method comprising:

setting a batch exchange unit on each of the multiple component mounters, the batch exchange unit being configured for batch exchanging multiple feeders that supply components or multiple suction nozzles that pick up the components and mount the components on the circuit board;

preparing multiple exchange-use batch exchange units to be exchanged with the batch exchange units set on the component mounters;

memorizing on a memorizing device setup information that is information of feeders or suction nozzles loaded on each of the multiple exchange-use batch exchange units used in a pre-changeover production;

acquiring a list of the feeders and suction nozzles to be used in a post-changeover target job;

acquiring the setup information from the memorizing device;

extracting combinations of the setup information that include all of the feeders and suction nozzles to be used in the post-changeover target job;

calculating a production time for each extracted combination of the setup information,

deciding an optimal combination of the setup information with a shortest production time; and

notifying the optimal combination of batch exchange units that include all of the feeders or suction nozzles to be used in the post-changeover target job from among the multiple exchange-use batch exchange units.

4. The component mounting line changeover support method according to claim 3 , wherein

each of the batch exchange unit includes a cart provided with the feeders or suction nozzles.

Assignments (2)
CHANGE OF NAME Recorded Jul 19, 2018
From: FUJI MACHINE MFG. CO., LTD.
To: FUJI CORPORATION
Reel/Frame 046591/0109 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 8, 2017
From: OHASHI, TERUYUKI
To: FUJI MACHINE MFG. CO., LTD.
Reel/Frame 042280/0704 →