IP Library Patent Application 15531055
Patent Application
App. No. 15/531,055

Bogie For A Railway Vehicle

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/531,055
Abstract

A bogie for a railway vehicle has at least two track guide units, in particular at least two wheels sets. A traction motor is arranged in the region of one of the track guide units, hereinafter called the first track guide unit. The traction motor drives the first track guide unit. A power converter supplies power to the traction motor driving the first track guide unit. The power converter is arranged in a region of a different track guide unit, which is not driven, i.e., the second track guide unit.

Claims (22)

1 - 14 . (canceled)

15 . A bogie for a rail-borne vehicle, the bogie comprising:

at least two track-guiding units including a first track-guiding unit, being a driven track-guiding unit, and a second track-guiding unit, being a non-driven track-guiding unit;

a traction motor for driving said first track-guiding unit disposed at said first track-guiding unit;

a current convertor for supplying current to said traction motor, said current converter being disposed at said second track-guiding unit.

16 . The bogie according to claim 15 , wherein said track-guiding units are wheel sets.

17 . The bogie according to claim 15 , wherein an axis of rotation of the bogie divides the bogie, viewed in a longitudinal direction thereof, into a front section and a rear section, and wherein said traction motor and said current convertor are arranged in mutually different said sections.

18 . The bogie according to claim 15 , wherein said track-guiding units are precisely two track-guiding units consisting of said first, driven track-guiding unit and said second, non-driven track-guiding unit.

19 . The bogie according to claim 15 , wherein each of said track-guiding units comprises an axle and two wheels, and said traction motor is configured to drive said axle of said first track-guiding unit.

20 . The bogie according to claim 15 , which comprises two axles, including a first axle equipped with a block brake and a second axle equipped with a wheel disc brake.

21 . The bogie according to claim 15 , which comprises two axles each equipped with a respective block brake.

22 . The bogie according to claim 15 , wherein the bogie comprises two axles and both axles are equipped with a wheel disc brake.

23 . The bogie according to claim 15 , which comprises a bogie frame and axles of said track-guiding units supporting said bogie frame, wherein said frame is supported on said axles to form an externally-mounted bogie.

24 . The bogie according to claim 15 , which comprises a bogie frame and axles of said track-guiding units supporting said bogie frame, wherein said frame is supported on said axles to form an internally-mounted bogie.

25 . A rail-borne vehicle, comprising at least one bogie, the at least one bogie having:

at least two track-guiding units including a first track-guiding unit, being a driven track-guiding unit, and a second track-guiding unit, being a non-driven track-guiding unit;

a traction motor for driving said first track-guiding unit disposed at said first track-guiding unit;

a current convertor for supplying current to said traction motor, said current converter being disposed at said second track-guiding unit.

26 . The rail-borne vehicle according to claim 25 , wherein the rail-born vehicle is an individual railcar train having two or more individual railcars.

27 . The rail-borne vehicle according to claim 26 , wherein each of said individual railcars is equipped with at least one of said bogies.

28 . The rail-borne vehicle according to claim 25 , wherein the rail-borne vehicle is an articulated train in which at least two railcar bodies are supported on one common said bogie and said bogie is a bogie according to claim 15 .

29 . The rail-borne vehicle according to claim 28 , wherein said articulated train are equipped with a plurality of bogies each being a bogie according to claim 15 .

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2020
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS MOBILITY GMBH
Reel/Frame 052060/0205 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 16, 2019
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS MOBILITY GMBH
Reel/Frame 048079/0310 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 30, 2017
From: SCHLAHT, JUERGEN
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 042532/0235 →