IP Library Granted Patent US 10,438,757
Granted Patent B2
US 10,438,757 · App. 15/531,310 · Granted Oct 8, 2019

Method for estimating an electrical operating time of a circuit breaker

Inventors: Anil Talluri (Bangalore, IN); Anoop Parapurath (Bangalore, IN); Rahul Radhakrishnan (Trivandrum, IN)
Assignee: ABB Schweiz AG
H01H9/56G04F10/10H01H9/563H01H33/593H03K17/16H03K17/28H01H2009/566H03K17/13
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,438,757
App. No.
15/531,310
Granted
Oct 8, 2019
Kind
B2
Abstract

The present invention provides a method of determining an electrical operating time of a circuit breaker ( 140 ) in a multiphase electrical system having a subsystem ( 160 ) at an electric potential resulting from electrical characteristics of electrical components within the subsystem. The method comprises monitoring ( 145 ) the voltage of the subsystem in the first phase, determining a first rate of change from the monitored voltage in the first phase, detecting at least one instance of switching based on the first rate of change, determining an electrical operating time of the circuit breaker based on the detected at least one instance of switching and an instance at which a command for switching was provided to the circuit breaker.

Claims (23)

1. A method ( 200 ) of determining an electrical operating time of a circuit breaker ( 140 ) for performing point on wave switching in a multiphase electrical system ( 100 ) having a subsystem ( 160 ) connectable to a power source ( 110 ), through the circuit breaker ( 140 ) operated by a controller ( 130 ), wherein the subsystem ( 160 ) is at an electric potential resulting from electrical characteristics of electrical components within the subsystem ( 160 ) and wherein the controller ( 130 ) is connected to a potential transformer ( 145 ) for measuring voltage of the subsystem ( 160 ) in a first phase, the method ( 200 ) comprising:

a. monitoring ( 210 ) the voltage of the subsystem ( 160 ) in the first phase,

b. determining ( 220 ) a first rate of change from the monitored voltage in the first phase;

c. detecting ( 230 ) at least one instance of switching based on the first rate of change ( 325 ) associated with voltage of the subsystem ( 160 ) in the first phase of the multiphase electrical system; and

d. determining ( 240 ) an electrical operating time of the circuit breaker ( 140 ) based on the detected at least one instance of switching and an instance at which a command for switching was provided to the circuit breaker ( 140 ).

2. The method as claimed in claim 1 , further comprising estimating a time for switching the circuit breaker ( 140 ), based on the determined electrical operating time of the circuit breaker ( 140 ) and system characteristics data associated with the subsystem ( 160 ).

3. The method as claimed in claim 1 , wherein detecting the at least one instance of switching further comprises:

i. monitoring a voltage associated with the power source ( 110 ) in at least one phase;

ii. calculating at least one second rate of change from voltage associated with the power source ( 110 ) in the at least one phase within a half cycle; and

iii. determining a ratio based on the first rate of change and the at least one second rate of change for detecting the at least one instance of switching.

4. The method as claimed in claim 1 , wherein the method further comprises associating the detected at least one instance of switching with a corresponding phase of the multiphase electrical system ( 100 ), wherein the at least one instance of switching, is a last instance of switching in the corresponding phase within a predetermined time window, wherein the predetermined window is based on a mechanical operating time associated with circuit breaker ( 140 ).

5. The method as claimed in claim 1 , wherein the method further comprises associating the detected at least one instance of switching with a corresponding phase of the multiphase electrical system ( 100 ), wherein the at least one instance of switching, is a first instance of switching in the corresponding phase within a predetermined time window, wherein the predetermined window is based on a mechanical operating time associated with circuit breaker ( 140 ).

6. The method as claimed in claim 4 , wherein the method further comprises determining a sequence of switching associated with the one or more phases of the multiphase electrical system ( 100 ) based on association between one or more instances of switching and the corresponding one or more phases.

7. The method as claimed in claim 5 , wherein the method further comprises determining a sequence of switching associated with the one or more phases of the multiphase electrical system ( 100 ) based on association between one or more instances of switching and the corresponding one or more phases.

8. A controller ( 130 ) configured to operate a circuit breaker ( 140 ) in a multiphase electrical system ( 100 ) having a power source ( 110 ) connectable to a subsystem ( 160 ), wherein the subsystem ( 160 ) is at an electric potential resulting from electrical characteristics of electrical components within the subsystem ( 160 ) and wherein the controller ( 130 ) is connected to a potential transformer ( 145 ) for measuring voltage of the subsystem ( 160 ) in a first phase, the controller ( 130 ) comprising:

a. one or more processors configured to

i. monitor the voltage of the subsystem ( 160 ) in the first phase, and

ii. determine a first rate of change from the monitored voltage in the first phase

iii. detect at least one instance of switching based on the first rate of change associated with voltage of the subsystem ( 160 ) in the first phase of the multiphase electrical system

iv. determine electrical operating time of the circuit breaker ( 140 ), based on the detected at least one instance of switching and;

v. estimate a time for switching based on the determined electrical operating time of the circuit breaker ( 140 ) and system characteristics data associated with the subsystem ( 160 ); and

b. a memory module functionally coupled to the one or more processors.

9. The controller ( 130 ) as claimed in claim 8 , wherein the one or more processors are further configured to detect a plurality of instances of switching associated with a plurality of phases in the multiphase electrical system ( 100 ) based on a third rate of change of voltage of the subsystem ( 160 ) in a second phase, upon unavailability of the first rate of change of voltage of the subsystem ( 160 ) in the first phase, wherein the second phase is one of a last phase to close and a first phase to open.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 15, 2021
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 055589/0769 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 28, 2019
From: TALLURI, ANIL; PARAPURATH, ANOOP; RADHAKRISHNAN, RAHUL
To: ABB SCHWEIZ AG
Reel/Frame 049882/0507 →
Priority Claims (1)
IN 5993/CHE/2014 · Nov 30, 2014 · national
Continuity (1)
Related Publication 20170358405A1 · Dec 14, 2017