IP Library Granted Patent US 10,328,383
Granted Patent B2
US 10,328,383 · App. 15/533,460 · Granted Jun 25, 2019

Flue gas treatment system and method

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,328,383
App. No.
15/533,460
Granted
Jun 25, 2019
Kind
B2
Abstract

A wet desulfurization apparatus which removes sulfur oxides in flue gas from a boiler 11 includes a mist collection/agglomeration apparatus which is provided on a downstream side of the desulfurization apparatus and forms agglomerated SO 3 mist by causing particles of SO 3 mist contained in flue gas 12 B from the wet desulfurization apparatus to be bonded together and have bloated particle sizes; a CO 2 recovery apparatus constituted by a CO 2 absorption tower having a CO 2 absorption unit which removes CO 2 contained in flue gas by being brought into contact with a CO 2 absorbent and an absorbent regeneration tower which recovers CO 2 by releasing CO 2 from the CO 2 absorbent having absorbed CO 2 and regenerates the CO 2 absorbent; and a mist collection unit which collects CO 2 absorbent bloated mist bloated by the CO 2 absorbent being absorbed by the agglomerated SO 3 mist in the CO 2 absorption unit.

Claims (12)

1. A flue gas treatment system comprising:

a desulfurization apparatus which removes sulfur oxides in flue gas from a boiler, which is configured to generate SO 3 mist from a portion of SO 3 gas in the flue gas;

a mist collection and agglomeration apparatus which is provided on a gas flow downstream side of the desulfurization apparatus and introduces the flue gas from the desulfurization apparatus, which is configured to form agglomerated SO 3 mist by causing particles of the SO 3 mist contained in the flue gas to be bonded together and have particle sizes bloat;

wherein the mist collection and agglomeration apparatus is configured to re-scatter the agglomerated SO 3 mist therefrom in a case a flow velocity of the flue gas exceeds a critical filtration wind velocity for mist collection;

a flue gas cooling tower which is provided on the gas flow downstream side of the mist collection and agglomeration apparatus and introduces the flue gas from the mist collection and agglomeration apparatus and cools the flue gas, which is configured to form dilute sulfuric acid mist from the agglomerated SO 3 mist contained in the flue gas by absorbing water vapor; and

a CO 2 recovery apparatus which is provided on the gas flow downstream side of the flue gas cooling tower, comprising:

a CO 2 absorption tower including a CO 2 absorption unit which introduces the flue gas from the flue gas cooling tower and removes CO 2 contained in the flue gas by being brought into contact with a CO 2 absorbent and a washing unit which is provided on the gas flow downstream side of the CO 2 absorption unit and washes the flue gas, which are configured to form CO 2 absorbent bloated mist from the dilute sulfuric acid mist contained in the flue gas by absorbing water vapor and CO 2 absorbent vapor, and a mist collection unit which is provided on a gas flow downstream side of the washing unit and is configured to collects the CO 2 absorbent bloated mist; and

an absorbent regeneration tower which introduces the CO 2 absorbent having absorbed CO 2 in the CO 2 absorption tower therefrom and recovers CO 2 from the CO 2 absorbent by releasing CO 2 therefrom to regenerate the CO 2 absorbent.

2. The flue gas treatment system according to claim 1 ,

wherein the mist collection and agglomeration apparatus includes a wire mesh.

3. The flue gas treatment system according to claim 1 ,

wherein the mist collection and agglomeration apparatus includes a discharge electrode for charging the SO 3 mist and a low pressure loss filter grounded.

Assignments (5)
CHANGE OF NAME Recorded Dec 14, 2023
From: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
To: MHI ENGINEERING, LTD.
Reel/Frame 066014/0774 →
NUNC PRO TUNC ASSIGNMENT Recorded Dec 14, 2023
From: MHI ENGINEERING, LTD.
To: MITSUBISHI HEAVY INDUSTRIES, LTD.
Reel/Frame 066014/0870 →
CHANGE OF NAME Recorded Jan 21, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS ENVIRONMENTAL SOLUTIONS, LTD.
To: MITSUBISHI POWER ENVIRONMENTAL SOLUTIONS, LTD.
Reel/Frame 055055/0721 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 26, 2018
From: MITSUBISHI HEAVY INDUSTRIES, LTD.
To: MITSUBISHI HEAVY INDUSTRIES ENGINEERING, LTD.
Reel/Frame 046465/0249 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 6, 2017
From: HIRATA, TAKUYA; NAGAYASU, HIROMITSU; UEDA, YASUTOSHI; NOBORISATO, TOMOKI; TANAKA, TAKAO; KATO, MASAYA
To: MITSUBISHI HEAVY INDUSTRIES, LTD.; MITSUBISHI HITACHI POWER SYSTEMS ENVIRONMENTAL SOLUTIONS, LTD.
Reel/Frame 042617/0733 →