IP Library Granted Patent US 10,446,340
Granted Patent B2
US 10,446,340 · App. 15/539,649 · Granted Oct 15, 2019

Method for controlled energising of a transformer

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,446,340
App. No.
15/539,649
Granted
Oct 15, 2019
Kind
B2
Abstract

In aspects, the present invention provides a method for controlled energizing of a transformer ( 150 ) being connected to a first electrical subsystem ( 110 ) through a first circuit breaker ( 140 ). The method comprises acquiring electrical current waveform in a first phase of the transformer during a closing operation of the first circuit breaker at an instance for switching determined by a controller ( 130 ), determining a first peak ( 310 ) in the current in the first phase within a first predetermined time window (Tpw), calculating a first correction factor for adjusting the instance for switching in the first phase, and adjusting the instance for switching based on the calculated first correction factor for performing a next controlled energization at the adjusted instance of switching in the first phase.

Claims (22)

1. A method for controlled energizing in a multiphase electrical system having a transformer being connected to a first electrical subsystem through a first circuit breaker, the first circuit breaker operated by a first controller, wherein the transformer comprises a first phase, the method comprising:

acquiring an electrical current waveform in the first phase of the transformer from a current measuring device during a closing operation of the first circuit breaker at an instance for switching determined by the first controller;

determining a first peak in the current in the first phase within a first predetermined window, wherein the first peak is an instance at which the magnitude of the current in the first phase is maximum within the first predetermined window;

calculating a first correction factor for adjusting the instance for switching in the first phase based on the first peak, wherein calculating the first correction factor comprises determining another peak in the current in the first phase within the first predetermined window and determining a ratio of the first peak and the another peak for calculating the first correction factor, wherein the ratio is indicative of a symmetry of the current waveform in the first phase during the closing operation; and

adjusting the instance for switching based on the calculated first correction factor for performing a next controlled energization at the adjusted instance of switching in the first phase.

2. The method as claimed in 1 , wherein the transformer includes a second phase, the method further comprising:

acquiring an electrical current waveform in the second phase of the transformer from a current measuring device during the closing operation of the first circuit breaker;

determining a second peak in the current in the second phase within a second predetermined window, wherein the second peak is an instance at which the magnitude of the current in the second phase is maximum within the second predetermined window;

calculating a second correction factor for adjusting the instance for switching in the second phase based the first peak and the second peak, and

adjusting the instance for switching in the second phase based on the calculated second correction factor for performing a next controlled energization at the adjusted instance of switching in the second phase.

3. The method as claimed in claim 2 , wherein calculating the first correction factor and the second correction factor comprises

determining at least one pair of values indicative of an apparent magnetic property of the transformer and an apparent residual flux in first phase of the transformer; and

determining at least one second pair of values indicative of the apparent magnetic property of the transformer and an apparent residual flux in the second phase of the transformer.

4. The method as claimed in claim 3 , wherein the electrical system further comprises a second electrical subsystem being connected to the transformer through a second circuit breaker, the second circuit breaker operated by a second controller, the method further comprising

transmitting the at least one pair of values and the at least one second pair of values from the first controller to the second controller for adjusting another instance for switching determined by the second controller for operating the second circuit breaker;

calculating a third correction factor for adjusting the another instance for switching determined by the second controller in the first phase of the second circuit breaker based on the at least one pair of values and the at least one second pair of values, and

adjusting the another instance for switching based on one of the calculated third correction factor for performing a next controlled energization at the adjusted another instance of switching in the first phase.

5. The method as claimed in claim 3 , further comprising resetting the at least one pair of values and the at least one second pair of values to predetermined values.

6. The method as claimed in claim 4 , wherein the first phase of the transformer is inter-coupled to the second phase of the transformer, the method further comprising determining a flux distribution coefficient indicative of a proportion of flux of one of the first phase and second phase, flowing in one of the second phase and first phase respectively.

7. A controller configured to operate a circuit breaker in a multiphase electrical system having a subsystem connectable to a transformer, the controller comprising:

one or more processors configured to (i) acquire an electrical current waveform in at least one phase of the transformer from a current measuring device during the closing operation of the circuit breaker; (ii) determine one or more peaks in the current in the at least one phase within a predetermined window; (iii) calculate at least one correction factor for adjusting an instance for switching in the at least one phase based the one or more peaks, wherein calculating the at least one correction factor comprises determining another peak in the current in the at least one phase within the predetermined window and determining a ratio of the one or more peaks and the another peak for calculating the first correction factor, wherein the ratio is indicative of a symmetry of the current waveform in the at least one phase during the closing operation and (iv) adjust the instance for switching in the at least one phase based on the calculated at least one correction factor for performing a next controlled energization at the adjusted instance of switching in the at least one phase, and

a memory module functionally coupled to the one or more processors.

Assignments (4)
MERGER Recorded Nov 13, 2023
From: HITACHI ENERGY SWITZERLAND AG
To: HITACHI ENERGY LTD
Reel/Frame 065549/0576 →
CHANGE OF NAME Recorded Dec 31, 2021
From: ABB POWER GRIDS SWITZERLAND AG
To: HITACHI ENERGY SWITZERLAND AG
Reel/Frame 058666/0540 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2020
From: ABB SCHWEIZ AG
To: ABB POWER GRIDS SWITZERLAND AG
Reel/Frame 052916/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 14, 2019
From: TALLURI, ANIL; PARAPURATH, ANOOP; PARIKH, URMIL
To: ABB SCHWEIZ AG
Reel/Frame 050044/0480 →