IP Library Granted Patent US 10,118,218
Granted Patent B2
US 10,118,218 · App. 15/541,499 · Granted Nov 6, 2018

Method for continuously casting slab

Inventors: Toshihiko Murakami (Kashima, JP); Hiroyuki Yotsuhashi (Fukuoka, JP); Shin Takaya (Narita, JP)
Assignee: NIPPON STEEL & SUMITOMO METAL CORPORATION
B22D11/049B22D11/041B22D11/043B22D11/124B22D11/16B22D11/22C21D1/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,118,218
App. No.
15/541,499
Granted
Nov 6, 2018
Kind
B2
Abstract

To provide a continuous casting method according to which a slab difficult for surface cracking to appear can be manufactured, in a first water cooling step, the slab is cooled so that only a surface temperature of corner parts is below Ar 3 point, in a first recuperation step, the slab is recuperated so that the surface temperature of all the slab including the corner parts is no less than the Ar 3 point, in a second water cooing step, the slab is cooled so that the surface temperature of all the slab including the corner parts is below the Ar 3 point, and in a second recuperation step, the slab is recuperated so that the surface temperature of only a portion of the slab other than the corner parts is no less than the Ar 3 point.

Claims (24)

1. A method for continuously casting a slab using a curved type or vertical bending type continuous casting machine, the method comprising:

the step of cooling the slab just beneath a mold in a secondary cooling zone, the slab being withdrawn from the mold, the step further comprising: a first water cooling step, a first recuperation step that follows the first water cooling step, a second water cooling step that follows the first recuperation step, and a second recuperation step that follows the second water cooling step,

wherein the first water cooling step is a step of cooling the slab of which a surface temperature is no less than 1000° C., by supplying cooling water to wide surfaces of the slab, including that only a surface temperature of a corner part is below Ar 3 point, and a surface temperature of a portion of the slab other than the corner part is kept no less than Ar 3 point, the corner part being a region within 20 mm from an apex and edges of the slab,

the first recuperation step is a step of recuperating the slab including that the surface temperature of all the slab including the corner part is no less than the Ar 3 point,

the second water cooing step is a step of cooling the slab of which the surface temperature is the Ar 3 point to 900° C., by supplying the cooling water to the wide surfaces of the slab, including that the surface temperature of all the slab including the corner part is below the Ar 3 point, and

the second recuperation step is a step of recuperating the slab including that the surface temperature of the corner part is kept below the Ar 3 point, and the surface temperature of the portion of the slab other than the corner part is no less than the Ar 3 point.

2. The method for continuously casting a slab according to claim 1 , wherein

flow density of the cooling water supplied to the slab in the first water cooling step is 170 to 290 L/min/m 2 , and time for supplying the cooling water to the slab in the first water cooling step is 0.95 to 4.0 minutes.

3. The method for continuously casting a slab according to claim 2 , the method comprising at least one step selected from the group consisting of:

the first recuperation step wherein time for recuperating the slab is no less than 2 minutes, and

the second recuperation step wherein time for recuperating the slab is no less than 2 minutes.

4. The method for continuously casting a slab according to claim 2 , wherein

flow density of the cooling water supplied to the slab in the second water cooling step is 170 to 290 L/min/m 2 , and time for supplying the cooling water to the slab in the second water cooling step is 0.95 to 4.0 minutes.

5. The method for continuously casting a slab according to claim 4 , the method comprising at least one step selected from the group consisting of:

the first recuperation step wherein time for recuperating the slab is no less than 2 minutes, and

the second recuperation step wherein time for recuperating the slab is no less than 2 minutes.

6. The method for continuously casting a slab according to claim 1 , wherein

flow density of the cooling water supplied to the slab in the second water cooling step is 170 to 290 L/min/m 2 , and time for supplying the cooling water to the slab in the second water cooling step is 0.95 to 4.0 minutes.

7. The method for continuously casting a slab according to claim 6 , the method comprising at least one step selected from the group consisting of:

the first recuperation step wherein time for recuperating the slab is no less than 2 minutes, and

the second recuperation step wherein time for recuperating the slab is no less than 2 minutes.

8. The method for continuously casting a slab according to claim 1 , the method comprising at least one step selected from the group consisting of:

the first recuperation step wherein time for recuperating the slab is no less than 2 minutes, and

the second recuperation step wherein time for recuperating the slab is no less than 2 minutes.

Assignments (2)
CHANGE OF NAME Recorded May 14, 2019
From: NIPPON STEEL & SUMITOMO METAL CORPORATION
To: NIPPON STEEL CORPORATION
Reel/Frame 049257/0828 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 11, 2017
From: MURAKAMI, TOSHIHIKO; YOTSUHASHI, HIROYUKI; TAKAYA, SHIN
To: NIPPON STEEL & SUMITOMO METAL CORPORATION
Reel/Frame 043265/0582 →
Priority Claims (1)
JP 2015-006209 · Jan 15, 2015 · national
Continuity (1)
Related Publication 20180015533A1 · Jan 18, 2018