IP Library Granted Patent US 10,577,777
Granted Patent B2
US 10,577,777 · App. 15/542,987 · Granted Mar 3, 2020

Control system for construction machinery

Inventors: Yong-Lak Cho (Incheon, KR); Hyun-Sik Lim (Incheon, KR); Soo-Kwang Lee (Seoul, KR); Young-Shik Cho (Gyeonggi-do, KR)
Assignee: DOOSAN INFRACORE CO., LTD.
E02F9/2228E02F9/2267E02F9/2271E02F9/2282E02F9/2285E02F9/268F15B13/025F15B13/0416F15B21/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,577,777
App. No.
15/542,987
Granted
Mar 3, 2020
Kind
B2
Abstract

A control system for construction machinery includes a main control valve installed in a hydraulic line between a hydraulic pump and actuators, and including a first group of electro proportional pressure reducing valves outputting a secondary pressure in proportion to an external pressure command signal to a first spool for controlling a first group of actuators of the actuators, and a second group of electro proportional pressure reducing valves outputting a secondary pressure in proportion to an external pressure command signal to a second spool for controlling a second group of actuators of the actuators, a first pressure sensor configured to detect the secondary pressure outputted from the first group of electro proportional pressure reducing valves and a second pressure sensor configured to detect the secondary pressure outputted from the second group of electro proportional pressure reducing valves, and a controller configured to output pressure command signals to the electro proportional pressure reducing valves corresponding to a manipulation signal of the construction machinery, and configured to compare the secondary pressures detected by the first and second pressure sensors and the pressure command signals to determine to determine whether or not the electro proportional pressure reducing valves fail.

Claims (26)

1. A control system for construction machinery, comprising:

a main control valve installed in a hydraulic line between a hydraulic pump and actuators, and including a first group of electro proportional pressure reducing valves outputting a first secondary pressure in proportion to a first pressure command signal to a first spool for controlling a first group of actuators of the actuators, and a second group of electro proportional pressure reducing valves outputting a second secondary pressure in proportion to a second pressure command signal to a second spool for controlling a second group of actuators of the actuators;

a safety lever valve installed in a pilot line through which a pilot working fluid discharged from a pilot pump is supplied and configured to selectively open and close the pilot line;

a first control valve installed in a first control line through which the pilot working fluid is supplied to the first group of electro proportional pressure reducing valves and configured to selectively open and close the first control line, the first control line being connected to the safety lever valve;

a second control valve installed in a second control line through which the pilot working fluid is supplied to the second group of electro proportional pressure reducing valves and configured to selectively open and close the second control line, the second control line being connected to the safety lever valve;

a first pressure sensor configured to detect the first secondary pressure outputted from the first group of electro proportional pressure reducing valves and a second pressure sensor configured to detect the second secondary pressure outputted from the second group of electro proportional pressure reducing valves; and

a controller configured to output the first and second pressure command signals to the first and second groups of electro proportional pressure reducing valves corresponding to a manipulation signal of the construction machinery, and configured to compare the first and second secondary pressures detected by the first and second pressure sensors and the first and second pressure command signals to determine whether or not the first and second groups of electro proportional pressure reducing valves fail,

wherein when it is determined that any one of the first group of electro proportional pressure reducing valves fails, the controller closes the first control valve to block the pilot working fluid from being supplied to the first group of electro proportional pressure reducing valves, and when it is determined that any one of the second group of electro proportional pressure reducing valves fails, the controller closes the second control valve to block the pilot working fluid from being supplied to the second group of electro proportional pressure reducing valves,

wherein the safety lever valve is configured to be closed based upon a manipulation of a safety lever or push of an engine emergency stop button in a cabin, to block the supply of the pilot working fluid through the pilot line, and

wherein the first group of actuators comprises at least one of a right traveling hydraulic motor, a left traveling hydraulic motor and a swing motor, and the second group of actuators comprises at least one of a boom cylinder, an arm cylinder and a bucket cylinder.

2. The control system for construction machinery of claim 1 , wherein at least one of the first and second control valves includes a solenoid valve.

3. The control system for construction machinery of claim 1 , wherein the controller comprises

a first controller configured to compare the first secondary pressure detected by the first pressure sensor and the first pressure command signal inputted to the first group of the electro proportional pressure reducing valves to determine whether or not the first group of electro proportional pressure reducing valves fail; and

a second controller configured to compare the second secondary pressure detected by the second pressure sensor and the second pressure command signal inputted to the second group of the electro proportional pressure reducing valves to determine whether or not the second group of electro proportional pressure reducing valves fail.

4. The control system for construction machinery of claim 3 , wherein when it is determined that any one of the first group of electro proportional pressure reducing valves fails, the first controller generates a first block signal for blocking the pilot working fluid from being supplied to the first group of electro proportional pressure reducing valves, and

when it is determined that any one of the second group of electro proportional pressure reducing valves fails, the second controller generates a second block signal for blocking the pilot working fluid from being supplied to the second group of electro proportional pressure reducing valves.

5. A control system for construction machinery, comprising:

a main control valve installed in a hydraulic line between a hydraulic pump and actuators, and including a first group of electro proportional pressure reducing valves outputting a first secondary pressure in proportion to a first pressure command signal to a first spool for controlling a first group of actuators of the actuators, and a second group of electro proportional pressure reducing valves outputting a second secondary pressure in proportion to a second pressure command signal to a second spool for controlling a second group of actuators of the actuators;

a safety lever valve installed in a pilot line through which a pilot working fluid discharged from a pilot pump is supplied and configured to selectively open and close the pilot line;

a first control valve installed in a first control line through which the pilot working fluid is supplied to the first group of electro proportional pressure reducing valves and configured to selectively open and close the first control line, the first control line being connected to the safety lever valve;

a second control valve installed in a second control line through which the pilot working fluid is supplied to the second group of electro proportional pressure reducing valves and configured to selectively open and close the second control line, the second control line being connected to the safety lever valve;

a first pressure sensor configured to detect the first secondary pressure outputted from the first group of electro proportional pressure reducing valves and a second pressure sensor configured to detect the second secondary pressure outputted from the second group of electro proportional pressure reducing valves; and

a controller configured to output the first and second pressure command signals to the first and second groups of electro proportional pressure reducing valves corresponding to a manipulation signal of the construction machinery, and configured to compare the first and second secondary pressures detected by the first and second pressure sensors and the first and second pressure command signals to determine whether or not the first and second groups of electro proportional pressure reducing valves fail,

wherein when it is determined that any one of the first group of electro proportional pressure reducing valves fails, the controller closes the first control valve to block the pilot working fluid from being supplied to the first group of electro proportional pressure reducing valves, and when it is determined that any one of the second group of electro proportional pressure reducing valves fails, the controller closes the second control valve to block the pilot working fluid from being supplied to the second group of electro proportional pressure reducing valves,

wherein the safety lever valve is configured to be closed based upon a manipulation of a safety lever or push of an engine emergency stop button in a cabin, to block the supply of the pilot working fluid through the pilot line, and

wherein the main control valve further comprises a hydraulic control valve having a third spool for controlling a third group of actuators of the actuators, the third spool being controlled by a pilot pressure in proportion to a manipulation amount of a manipulation lever.

Assignments (4)
MERGER Recorded Jul 27, 2026
From: HD HYUNDAI INFRACORE CO., LTD.
To: HD CONSTRUCTION EQUIPMENT CO., LTD.
Reel/Frame 075412/0880 →
CHANGE OF NAME Recorded Dec 4, 2023
From: DOOSAN INFRACORE CO., LTD.
To: HYUNDAI DOOSAN INFRACORE CO., LTD.
Reel/Frame 065761/0942 →
CHANGE OF NAME Recorded Dec 4, 2023
From: HYUNDAI DOOSAN INFRACORE CO., LTD.
To: HD HYUNDAI INFRACORE CO., LTD.
Reel/Frame 065761/0957 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 12, 2018
From: CHO, YONG-LAK; LIM, HYUN-SIK; LEE, SOO-KWANG; CHO, YOUNG-SHIK
To: DOOSAN INFRACORE CO., LTD.
Reel/Frame 044609/0549 →
Priority Claims (1)
KR 10-2015-0006614 · Jan 14, 2015 · national
Continuity (1)
Related Publication 20180044891A1 · Feb 15, 2018