Gas turbine manufacturing method

Inventors: Yasuo Takahashi (Yokohama, JP); Takanori Shibata (Yokohama, JP); Yasunori Kimura (Yokohama, JP); Chihiro Myoren (Yokohama, JP)
Assignee: Mitsubishi Hitachi Power Systems, Ltd.
F04D19/02F02C3/04F02C3/06F02C3/22F02C6/08F04D29/54F04D29/66F04D29/661F04D29/542F05D2220/32F05D2220/3216F05D2220/72F05D2230/50F05D2230/80F05D2240/40Y02E20/16Y10T29/49238
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,718,340
App. No.
15/559,164
Granted
Jul 21, 2020
Kind
B2
Abstract

In a gas turbine manufacturing method for manufacturing a derivative gas turbine having a different cycle from a reference gas turbine including a reference compressor, a compressor of the derivative gas turbine is designed to add at least one additional stage further on an upstream side than a last stage of the reference compressor and on a downstream side of a bleed slit of a bleed chamber of the reference compressor, the compressor of the derivative gas turbine is manufactured on the basis of the design, and the derivative gas turbine is manufactured. Consequently, it is possible to manufacture a gas turbine that can secure a surge margin of a compressor with respect to fluctuation in the composition of fuel.

Claims (11)

1. A gas turbine manufacturing method for manufacturing a derivative gas turbine having a different cycle from a reference gas turbine including a reference compressor, the gas turbine manufacturing method comprising:

designing a compressor of the derivative gas turbine by adding at least one additional stage further on an upstream side than a last stage of the reference compressor and on a downstream side of a bleed slit of a bleed chamber of the reference compressor;

manufacturing the compressor of the derivative gas turbine on the basis of the designed compressor; and

designing and manufacturing the derivative gas turbine, wherein a connecting section to a turbine side of a distance piece that configures the last stage of a rotor of the reference compressor is reduced in length.

2. The gas turbine manufacturing method according to claim 1 , wherein a disk of the at least one additional stage is formed in structure same as structure of a disk of a pre-stage of the last stage of the reference compressor.

3. The gas turbine manufacturing method according to claim 2 , wherein a distance piece of the compressor of the derivative gas turbine is formed in structure same as structure of a distance piece of the last stage of the reference compressor.

4. The gas turbine manufacturing method according to claim 1 , wherein the bleed slit is a bleed slit provided on a most downstream side among a plurality of the bleed slits provided in the reference compressor.

5. The gas turbine manufacturing method according to claim 1 , wherein a position where the at least one additional stage is added is included in a region where an inner diameter and an outer diameter of a compressor channel are fixed.

6. The gas turbine manufacturing method according to claim 1 , wherein a rotor blade of the at least one additional stage is formed in a shape same as a shape of a rotor blade of a pre-stage of the at least one additional stage.

7. The gas turbine manufacturing method according to claim 1 , wherein a stator vane of the last stage and an exit guide vane of the reference compressor are used as a stator vane of the last stage and an exit guide vane of the derivative gas turbine.

8. The gas turbine manufacturing method according to claim 1 , wherein a number of stages of the at least one additional stage is calculated on the basis of a pressure ratio increase value corresponding to fluctuation in a composition of fuel.

Assignments (3)
CORRECTIVE ASSIGNMENT TO CORRECT THE REMOVING PATENT APPLICATION NUMBER 11921683 PREVIOUSLY RECORDED AT REEL: 054975 FRAME: 0438. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded May 26, 2023
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 063787/0867 →
CHANGE OF NAME Recorded Jan 13, 2021
From: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
To: MITSUBISHI POWER, LTD.
Reel/Frame 054975/0438 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 18, 2017
From: TAKAHASHI, YASUO; SHIBATA, TAKANORI; KIMURA, YASUNORI; MYOREN, CHIHIRO
To: MITSUBISHI HITACHI POWER SYSTEMS, LTD.
Reel/Frame 043613/0357 →
Priority Claims (1)
JP 2015-082277 · Apr 14, 2015 · national
Continuity (1)
Related Publication 20180066662A1 · Mar 8, 2018
Cited By (1)
US 12,650,093