IP Library Granted Patent US 10,588,040
Granted Patent B2
US 10,588,040 · App. 15/565,726 · Granted Mar 10, 2020

Measurement gap configuration in dual connectivity enhancement

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,588,040
App. No.
15/565,726
Granted
Mar 10, 2020
Kind
B2
Abstract

In embodiments, a UE may measure system frame number (SFN)/subframe timing differences between a master eNB (MeNB) and secondary eNB (SeNB) for dual connectivity (DC). When network-based reporting on the SFN/subframe timing offset is used, no new radio access network (RAN) signaling may be needed. However, in the case of multi-vendor deployments, no network coordination via different Operations, Administration, and Maintenance (OAM) for DC may occur. In this case, the network may not be able to obtain SFN/subframe timing offset information. To address this issue, various embodiments disclosed herein include UE-based reporting on SFN/subframe offset between an MeNB and an SeNB.

Claims (21)

1. A user equipment, UE, apparatus, comprising:

receive logic at least partially implemented in hardware to:

receive, from a master eNodeB, MeNB, master cell group, MCG, measurement gap information, and

receive, from a secondary eNodeB, SeNB, secondary cell group, SCG, measurement gap information;

control logic at least partially implemented in hardware to compare the MCG measurement gap information and the SCG measurement gap information; and

transmit logic to transmit, to the MeNB, based on a result of the comparison:

a synchronization indicator representative of whether an MCG subframe boundary is synchronized to an SCG subframe boundary,

a system frame number, SFN, difference between an MCG and an SCG, and

a frame boundary timing difference between an MCG and an SCG.

2. The UE apparatus of claim 1 , wherein the MeNB and/or SeNB measurement gap information includes: a primary synchronizing signal, PSS, and/or a secondary synchronizing signal, SSS, and/or a master information block, MIB.

3. The UE apparatus of claim 1 , wherein the frame boundary timing difference is specified at a subframe level.

4. The UE apparatus of claim 1 , wherein an SCG gap length is 6 milliseconds.

5. A method of wireless communication, comprising:

receiving, by a user equipment, UE, from a Master eNodeB, MeNB, master cell group, MCG, measurement gap information;

receiving, by the UE from a SeNB, secondary cell group, SCG, measurement gap information;

comparing, by the UE, the MCG measurement gap information and the SCG measurement gap information; and

transmitting, by the UE to the MeNB, based on a result of the comparison:

a synchronization indicator representative of whether an MCG subframe boundary is synchronized to an SCG subframe boundary,

a system frame number, SFN, difference between an MCG and an SCG, and

a frame boundary timing difference between an MCG and an SCG.

6. The method of claim 5 , wherein the measurement gap information includes: a primary synchronizing signal, PSS, and/or a secondary synchronizing signal, SSS, and/or a master information block, MIB.

Assignments (2)
CONFIRMATORY ASSIGNMENT Recorded Jul 17, 2020
From: INTEL IP CORPORATION
To: INTEL CORPORATION
Reel/Frame 053236/0805 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 25, 2020
From: INTEL CORPORATION
To: APPLE INC.
Reel/Frame 053066/0001 →