IP Library Granted Patent US 10,422,020
Granted Patent B2
US 10,422,020 · App. 15/567,180 · Granted Sep 24, 2019

Scrap melting in anode furnace processes

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,422,020
App. No.
15/567,180
Granted
Sep 24, 2019
Kind
B2
Abstract

Provided is a method for melting copper scrap and/or refining blister copper, comprising the steps of: (a) charging of copper scrap into an empty anode furnace and melting the copper scrap; (b) charging molten blister copper into the anode furnace; (c) optionally charging more copper scrap into the anode furnace and melting the copper scrap; (d) optionally repeating steps (b) and/or (c) one or more times until the anode furnace is full and a desired amount of copper scrap has been charged and melted until a final copper batch is obtained; and (e) refining the final copper batch to obtain anode copper.

Claims (14)

1. A method of melting copper scrap and/or refining blister copper, comprising the steps of:

(a) charging of copper scrap into an empty anode furnace and melting the copper scrap;

(b) after performing step (a) charging molten blister copper into the anode furnace;

(c) optionally charging more copper scrap into the anode furnace and melting the copper scrap;

(d) optionally repeating steps (b) and/or (c) one or more times until the anode furnace is full and a desired amount of copper scrap has been charged and melted until a final molten copper batch is obtained which occurs at least after step (b);

(e) refining the final molten copper batch to obtain anode copper;

(f) emptying the anode furnace by pouring the anode copper from the anode furnace into anode molds to provide said empty anode furnace and repeating steps (a) to (f) after step (f).

2. The method as claimed in claim 1 , wherein melting of copper scrap is accomplished by providing additional heat energy to the anode furnace by using one or more mantle burners selected from pipe-in-a-pipe air-fuel, air/oxy-fuel or oxy-fuel burner(s) located at a furnace mantle.

3. The method as claimed in claim 2 , wherein the use of the one or more mantle burners is combined with use of an end-wall burner for mixing combustion gases in the anode furnace.

4. The method as claimed in claim 1 , wherein at least 15 wt % of the total weight of the final copper batch is copper scrap.

5. The method as claimed in claim 1 , wherein at least 50 wt % of the weight of the total charged copper scrap in the final molten copper batch is charged in step (a).

6. The method as claimed in claim 1 , wherein the charging of copper scrap of step (a) is initiated immediately after anode casting.

7. The method as claimed in claim 1 , wherein at least 20 wt % of the total weight of the final copper batch is copper scrap.

8. The method as claimed in claim 1 , wherein from 60 to 100 wt % of the weight of the total charged copper scrap in the final molten copper batch is charged in step (a).

Assignments (5)
DE-MERGER Recorded Oct 3, 2023
From: METSO OUTOTEC FINLAND OY
To: METSO OUTOTEC METALS OY
Reel/Frame 065114/0419 →
CHANGE OF NAME Recorded Oct 3, 2023
From: METSO OUTOTEC METALS OY
To: METSO METALS OY
Reel/Frame 065114/0684 →
MERGER Recorded Jan 6, 2023
From: OUTOTEC (FINLAND) OY
To: METSO MINERALS OY
Reel/Frame 062308/0415 →
CHANGE OF NAME Recorded Jan 6, 2023
From: METSO MINERALS OY
To: METSO OUTOTEC FINLAND OY
Reel/Frame 062308/0451 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 15, 2017
From: TALVENSAARI, HARRI; JAATINEN, AKUSTI
To: OUTOTEC (FINLAND) OY
Reel/Frame 044137/0360 →