System and method for controlling ramp imbalances in model predictive controllers

Inventors: Rishi Amrit (Katy, TX); Pierre Christian Marie Carrette (Seria, BN); John Martin Williamson (Houston, TX); William Matthew Canney (Fulshear, TX)
Assignee: Shell Oil Company
G05B13/048G05B13/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,656,606
App. No.
15/578,084
Granted
May 19, 2020
Kind
B2
Abstract

The temporary relaxation of constraints permits the efficient and cost-effective operation of certain process models. Ramp imbalances are controlled using soft-landing constraints. Such soft-landing constraints permit a smooth return to a ramp limit which permits continued operation of a system, such as a petrochemical system that includes several inflows and outflows, as opposed to a forced shut-down of the system. A ramp imbalance may be controlled by determining imbalance ramp rates and imbalance set-point ramp rates and using those constraints to resolve the dynamic control problem of a process model.

Claims (29)

1. A method for controlling ramp imbalances in a model predictive controller by allowing temporary relaxation of ramp imbalance constraints when within limits to better control a petrochemical process, comprising:

determining user specified settings comprising minimum/maximum allowed ramp rates (δ in min −δ in max ), time to balance (t bal ), and set-point recovery rate (δ r );

determining a change (Δ) in current ramp imbalance induced by changes in one or more external disturbance affecting one or more ramp variables;

modifying low (y lo,sp ) and high (y hi,sp ) set-point limits in accordance with y lo,sp =y lo,sp +min(t bal Δ,0) and y hi,sp =y hi,sp +max(0,t bal Δ);

determining soft-landing ramp limit time constants (T lo and T hi ) based on ramp limits (y lo and y hi ) and the user-defined minimum/maximum allowed ramp rates in accordance with T lo =max(T min ,(y lo −y)/δ in min ) and T hi =max(T min ,(y hi −y)/δ in max ) where y is a current ramp and T min is a minimum time constant that determines how fast the ramp rate may be driven to zero;

determining soft-land set-point limit time constants (T lo,sp and T hi,sp ) in accordance with T lo,sp =max(T min ,(y lo,sp −y)/δ in min ) and T hi,sp =max(T min ,(y hi,sp −y)/δ in max );

determining imbalance ramp rate constraints (δ min,ss and δ max,ss ) in accordance with δ min,ss =(y lo −y)/max(T lo ,h) and δ max,ss =(y hi −y)/max(T hi ,h) where h is the dynamic control horizon;

determining imbalance set-point ramp rate constraints (δ min,sp,ss and δ max,sp,ss ) in accordance with δ min,sp,ss =(y lo,sp −y)/max(T lo,sp ,h) and δ max,sp,ss =(y hi,sp −y)/max(T hi,sp ,h);

resolving static control process problem by imposing the determined imbalance ramp rate constraints (δ min,ss and δ max,ss ) at a priority higher than the ramp limits (y lo and y hi ) and imposing the determined imbalance set-point ramp rate constraints (δ min,sp,ss and δ max,sp,ss ) at a priority higher than the ramp set point limits (y lo,sp and y hi,sp );

updating constraints for the ramp limits (y lo and y hi ) in accordance with y lo ≤y k +T lo δ k and y k +T hi δ k ≤y hi where k is a prediction time and δ k is a ramp rate at the prediction time;

updating constraints for the set-point limit trajectories in accordance with y lo,sp,k ≤y k +T lo,sp δ k and y k +T hi,sp δ k ≤y hi,sp,k where set-point limit trajectories (y lo,sp,k and y hi,sp,k ) are defined as y lo,sp,k =min(y lo,sp +kδ r ,y sp ) and y hi,sp,k =max(y sp y hi,sp −kδ r );

resolving a dynamic control process problem using said updates; and

controlling the ramp imbalances in the model predictive controller by said ramp imbalance constraints to better control the petrochemical process.

2. A system comprising:

one or more processors for processing information;

a memory communicatively coupled to the one or mom processors; and

one or more modules that comprise instructions stored in the memory, the instructions, when executed by the processor, operable to perform calculations of a static control problem and a dynamic control problem comprising:

determining user specified settings comprising minimum/maximum allowed ramp rates (δ in min −δ in max ), time to balance ramp (t bal ), and set-point recovery rate (δ r );

determining a change (Δ) in a current ramp imbalance induced by changes in one or more external disturbances affecting one or more ramp variables;

modifying low (y lo,sp ) and high (y hi,sp ) set-point limits in accordance with y lo,sp =y lo,sp +min(t bal Δ,0) and y hi,sp =y hi,sp +max(0,t bal Δ);

determining soft-landing ramp limit time constants (T lo and T hi ) based on ramp limits (y lo and y hi ) and the user-defined minimum/maximum allowed ramp rates in accordance with T lo =max(T min ,(y lo −y)/δ in min ) and T hi =max(T min ,(y hi −y)/δ in max ) where y is a current ramp and T min is a minimum time constant that determines how fast the ramp rate may be driven to zero;

determining soft-land set-point limit time constants (T lo,sp and T hi,sp ) in accordance with T lo,sp =max(T min ,(y lo,sp −y)/δ in min ) and T hi,sp =max(T min ,(y hi,sp −y)/δ in max );

determining imbalance ramp rate constraints (δ min,ss and δ max,ss ) in accordance with δ min,ss =(y lo −y)/max(T lo ,h) and δ max,ss =(y hi −y)/max(T hi ,h) where h is the dynamic control horizon;

determining imbalance set-point ramp rate constraints (δ min,sp,ss and δ max,sp,ss ) in accordance with δ min,sp,ss =(y lo,sp −y)/max(T lo,sp ,h) and δ max,sp,ss =(y hi,sp −y)/max(T hi,sp ,h);

resolving static control process problem by imposing the determined imbalance ramp rate constraints (δ min,ss and δ max,ss ) at a priority higher than the ramp limits (y lo and y hi ) and imposing the determined imbalance set-point ramp rate constraints (δ min,sp,ss and δ max,sp,ss ) at a priority higher than the ramp set point limits (y lo,sp and y hi,sp );

updating constraints for the ramp limits (y lo and y hi ) in accordance with y lo ≤y k +T lo δ k and y k +T hi δ k ≤y hi where k is a prediction time and δ k is a ramp rate at the prediction time;

updating constraints for the set-point limit trajectories in accordance with y lo,sp,k ≤y k +T lo,sp δ k and T hi,sp δ k ≤y hi,sp,k where set-point limit trajectories (y lo,sp,k and y hi,sp,k ) are defined as y lo,sp,k =min(y lo,sp +kδ k y sp ) and y hi,sp,k =max(y sp y hi,sp −kδ r );

resolving a dynamic control process problem using said updates; and

controlling the ramp imbalances in the model predictive controller by said ramp imbalance constraints to better control the petrochemical process.

Assignments (2)
CHANGE OF NAME Recorded Mar 7, 2022
From: SHELL OIL COMPANY
To: SHELL USA, INC.
Reel/Frame 059694/0819 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 8, 2018
From: AMRIT, RISHI; CARRETTE, PIERRE CHRISTIAN MARIE; WILLIAMSON, JOHN MARTIN; CANNEY, WILLIAM MATTHEW
To: SHELL OIL COMPANY
Reel/Frame 045147/0701 →
Continuity (2)
Provisional Application 62171577 · Jun 5, 2015
Related Publication 20180150039A1 · May 31, 2018