US 10,331,488 · App. 15/600,602 · Granted Jun 25, 2019

Multilayered resource scheduling

Inventors: Jeremy Minor (Santa Cruz, CA); Stuart Taylor (San Jose, CA)
Assignee: Runtime Design Automation
G06F9/505G06F9/5038G06F9/5044
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,331,488
App. No.
15/600,602
Granted
Jun 25, 2019
Kind
B2
Abstract

Systems and methods for multilayered resource scheduling are provided. A system may include a user interface, an upper level scheduler, at least one lower level scheduler, and a reporting module. The user interface may receive a plurality of tasks. The upper level scheduler may sort the plurality of tasks into tasks with identical resource requirements. The lower level scheduler may be operable to receive resource requirements associated with a task. The lower level scheduler may ascertain compute resources sufficient to execute the task on a machine in a compute farm and advertise the compute resources as matching the resource requirements. The lower level scheduler may further receive a request to execute the task on the machine. The compute resources may be controlled to execute the tasks with the identical resource requirements without further scheduling operations. The lower level scheduler may control the compute resources to execute the task.

Claims (58)

1. A system for multilayered resource scheduling, the system comprising:

one or more processors; and

one or more non-transitory computer-readable media including one or more sets of instructions which, when executed by the one or more processors, causes:

providing a user interface operable to receive a plurality of tasks;

providing an upper level scheduler operable to sort a plurality of tasks into tasks with identical resource requirements;

providing at least one lower level scheduler communicatively coupled to the upper level scheduler, the at least one lower level scheduler being operable to:

receive resource requirements associated with a task;

ascertain compute resources sufficient to execute the task on a machine in a compute farm;

advertise the compute resources as matching the resource requirements;

receive a request to execute the task on the machine, wherein the compute resources are controlled to execute the tasks with the identical resource requirements without further scheduling operations; and

control the compute resources to execute the task;

providing at least one reporting module to provide a global view of the compute resources to the user interface; and

providing a mitigation mechanism to schedule priority tasks, the mitigation mechanism operable to instruct the upper level scheduler to stop sending the tasks with the identical resource requirements after a current task is executed to allow execution of higher priority tasks.

2. The system of claim 1 , wherein the at least one lower level scheduler is operable to receive the plurality of tasks directly without modifications of the plurality of tasks.

3. The system of claim 1 , wherein the at least one lower level scheduler is further operable to make the compute resources available in response to a demand by the upper level scheduler.

4. The system of claim 1 , wherein the upper level scheduler includes a private scheduler, the private scheduler being operable to manage tasks associated with a single entity.

5. The system of claim 1 , wherein the lower level scheduler includes a master scheduler process and a resource management process corresponding to each machine in the compute farm under control of the lower level scheduler.

6. The system of claim 5 , wherein the compute resources matching the resource requirements are advertised by the resource management process in conjunction with a proxy task.

7. The system of claim 6 , wherein the compute resources include at least one of a number of central processing units and an amount of memory.

8. The system of claim 1 , wherein the at least one lower level scheduler is operable to receive further tasks of the plurality of tasks via a proxy encapsulating the tasks with the identical resource requirements.

9. The system of claim 1 , wherein the upper level scheduler is aware of a subset of underlying compute resources, whereas the lower level scheduler is aware of full compute resources.

10. The system of claim 1 , wherein the mitigation mechanism is further operable to stop accepting the tasks with the identical resource requirements after a predetermined period of time to allow the lower level scheduler to schedule tasks associated with different resource requirements.

11. The system of claim 1 , wherein the at least one lower level scheduler is operable to ascertain the compute resources based on preexisting policies.

12. A method for multilayered resource scheduling, the method comprising:

receiving, by a user interface of a computer system, a plurality of tasks;

sorting, by an upper level scheduler of the computer system, the plurality of tasks into tasks with identical resource requirements;

receiving, by at least one lower level scheduler of the computer system, resource requirements associated with a task;

ascertaining, by the at least one lower level scheduler, compute resources sufficient to execute the task on a machine in a compute farm;

advertising, by the at least one lower level scheduler, the compute resources as matching the resource requirements;

receiving, by the at least one lower level scheduler, a request to execute the task on the machine, wherein the compute resources are controlled to execute the tasks with the identical resource requirements without further scheduling operations;

controlling, by the at least one lower level scheduler, the compute resources to execute the task;

providing, by at least one reporting module of the computer system, a global view of the compute resources to the user interface;

receiving, by the at least one lower level scheduler, further tasks of the plurality of tasks via a proxy encapsulating the tasks with the identical resource requirements; and

scheduling, by a mitigation mechanism of the computer system associated with the proxy, priority tasks, the mitigation mechanism being operable to stop accepting the tasks with the identical resource requirements after a predetermined period of time to allow the at least one lower level scheduler to schedule tasks associated with different resource requirements.

13. The method of claim 12 , further comprising providing, by the at least one lower level scheduler, the compute resources in response to a demand by the upper level scheduler.

14. The method of claim 12 , wherein the lower level scheduler includes a master scheduler process and a resource management process corresponding to each machine in the compute farm under control of the lower level scheduler.

15. The method of claim 12 , further comprising instructing, by a mitigation mechanism associated with the proxy, the upper level scheduler to stop sending the tasks with the identical resource requirements after a current task is executed to allow execution of higher priority tasks.

16. The method of claim 12 , further comprising managing, by the upper level scheduler, tasks associated with a single entity, the upper level scheduler including a private scheduler.

17. The method of claim 12 , further comprising receiving, by the at least one lower level scheduler, the plurality of tasks directly without modifications of the plurality of tasks.

18. The method of claim 12 , wherein the compute resources matching the resource requirements are advertised by a resource management process in conjunction with a proxy task.

19. A system for multilayered resource scheduling, the system comprising:

one or more processors; and

one or more non-transitory computer-readable media including one or more sets of instructions which, when executed by the one or more processors, causes:

providing an upper level scheduler operable to sort a plurality of tasks into tasks with identical resource requirements;

providing at least one lower level scheduler communicatively coupled to the upper level scheduler, the at least one lower level scheduler being operable to:

receive resource requirements associated with a task;

ascertain compute resources sufficient to execute the task on a machine in a compute farm;

advertise the compute resources as matching the resource requirements;

make the compute resources available in response to a demand by the upper level scheduler;

receive a request to execute the task on the machine, wherein the compute resources are controlled to execute the tasks with the identical resource requirements without further scheduling operations; and

control the compute resources to execute the task;

receive, further tasks of the plurality of tasks via a proxy encapsulating the tasks with the identical resource requirements;

wherein the lower level scheduler includes a master scheduler process and a resource management process corresponding to each machine in the compute farm under control of the lower level scheduler; and

wherein the compute resources matching the resource requirements are advertised by the resource management process; and

providing a mitigation mechanism associated with the proxy operable to instruct the upper level scheduler to stop sending the tasks with the identical resource requirements after a current task is executed to allow execution of higher priority tasks.

20. The system of claim 19 , wherein the one or more sets of instructions, when executed by the one or more processors, further causes:

providing a user interface to receive the plurality of tasks; and

providing at least one reporting module to provide a global view of the compute resources to the user interface.

Assignments (3)
MERGER Recorded Feb 4, 2026
From: ALTAIR ENGINEERING INC.
To: SIEMENS INDUSTRY SOFTWARE INC.
Reel/Frame 074348/0312 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 2, 2019
From: RUNTIME DESIGN AUTOMATION INC.
To: ALTAIR ENGINEERING, INC.
Reel/Frame 049940/0046 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 31, 2017
From: MINOR, JEREMY; TAYLOR, STUART
To: RUNTIME DESIGN AUTOMATION
Reel/Frame 043382/0880 →
Continuity (2)
Continuation 14705703 · May 6, 2015
Related Publication 20170262315A1 · Sep 14, 2017
Cited By (1)
US 12,346,723