IP Library Granted Patent US 10,821,415
Granted Patent B2
US 10,821,415 · App. 15/602,673 · Granted Nov 3, 2020

Methods and tools for installing reactor components

Inventors: William Alan Whittenberger (Ravenna, OH); Joseph W. Whittenberger (Ravenna, OH); Frank James Podojil, III (Ravenna, OH)
Assignee: Johnson Matthey Public Limited Company
B01J19/2415B01J19/2485G01L19/086B01J19/0053B01J19/32B01J2219/00018B01J2219/2441B01J2219/2496
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,821,415
App. No.
15/602,673
Granted
Nov 3, 2020
Kind
B2
Abstract

An installation tool for installing reactor components into a reactor is disclosed. The tool comprises a housing having a first end and a second end opposite the first end; a releasable attachment assembly for securing a reactor component support to the tool, the attachment assembly being pivotably inside the housing; a gas supply hose connected to the first end of the housing; and a gas outlet at the second end of the housing in fluid communication with the gas supply hose. The gas outlet is configured to provide gas to expand a reactor component secured by the releasable attachment assembly. A control line for the releasable attachment assembly runs inside the gas supply hose.

Claims (14)

1. An installation tool for installing reactor components into a reactor, the tool comprising:

a housing having a first end and a second end opposite the first end;

a releasable attachment assembly for securing a reactor component support to the tool,

the attachment assembly being mounted inside the housing;

a gas supply hose connected to the first end of the housing; and a gas outlet at the second end of the housing in fluid communication with the gas supply hose,

wherein the gas outlet is configured to provide gas to expand a reactor component secured by the releasable attachment assembly and wherein a control line for the releasable attachment assembly runs inside the gas supply hose;

wherein the installation tool comprises a seal assembly mounted on the second end of the housing and the gas outlet is configured to provide pressurized gas to expand the reactor component via the seal assembly.

2. An installation tool according to claim 1 , wherein the seal assembly is mounted on the second end of the housing by a twist-lock.

3. An installation tool according to claim 1 , wherein the tool comprises more than one control line running inside the gas supply hose.

4. An installation tool according to claim 1 , wherein the attachment assembly is pivotably mounted inside the housing.

5. An installation tool according to claim 1 , wherein the gas supply hose has length markings on its outer surface.

6. An installation tool according to claim 1 , wherein the tool comprises a pressure sensor to measure the pressure within the housing.

7. An installation tool according to claim 6 , wherein a sensing hose runs inside the gas supply hose.

8. An installation tool according to claim 1 , wherein the gas supply hose is configured to support the weight of the tool.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 26, 2025
From: JOHNSON MATTHEY PLC
To: JOHNSON MATTHEY DAVY TECHNOLOGIES LIMITED
Reel/Frame 072941/0488 →
Continuity (2)
Provisional Application 62340105 · May 23, 2016
Related Publication 20170333865A1 · Nov 23, 2017