IP Library Granted Patent US 10,351,401
Granted Patent B2
US 10,351,401 · App. 15/611,438 · Granted Jul 16, 2019

Work implement frame with gate

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,351,401
App. No.
15/611,438
Granted
Jul 16, 2019
Kind
B2
Abstract

A work implement frame having a top support and a bottom support. The top support and bottom support are tied together structurally by end plates and/or vertical ribs. One or more fork tines may be combined with the top or bottom support of the frame and are adapted to carry pallets or other loads as is know in the art. The frame includes a load rest to help support the load. The load rest is typically positioned near the top of the frame. A gate in the load rest is movable between an open position and a closed position. In its open position an operator may pass through the gate to enter the cab. The gate may be pivotally or slidably combined with the load rest.

Claims (32)

1. A work implement adapted to carry a load and be moved by an operator, said work implement comprising:

a pallet fork frame;

a load rest combined with the pallet fork frame;

wherein the load rest has a gate movable between an open position having a walkway therethrough and a closed position, wherein the gate is adapted to be positioned between the load and the operator.

2. The work implement of claim 1 wherein the gate is pivotally combined with the load rest.

3. The work implement of claim 2 wherein the pivotal connection includes a hinge having a first portion combined with the load rest and a second portion combined with the gate.

4. The work implement of claim 1 wherein the gate is slidably combined with the load rest.

5. The work implement of claim 1 wherein the pallet fork frame further comprises a step positioned beneath the gate.

6. The work implement of claim 1 wherein the load rest includes a middle portion and a side portion and the gate is in the middle portion.

7. The work implement of claim 1 further comprising a biasing member for biasing the gate in the closed position.

8. The work implement of claim 1 further comprising one or more fork tines combined with the pallet fork frame.

9. A work implement comprising:

a frame adapted to be combined with a lift truck vehicle, wherein the frame has a top support aligned generally in a vertical plane with a bottom support;

a load rest combined with the top support of the frame;

wherein a portion of the load rest is a gate movable between an open position having a walkway through the load rest and a closed position where the gate functions as part of the load rest to help support the load;

wherein the bottom support of the frame does not include a gate.

10. The work implement of claim 9 wherein the gate is pivotally combined with the load rest.

11. The work implement of claim 9 wherein the gate is pivotally combined with the frame.

12. The work implement of claim 9 wherein the gate is slidably combined with the load rest.

13. The work implement of claim 9 wherein the gate is slidably combined with the frame.

14. The work implement of claim 9 wherein the frame further comprises a step positioned beneath the gate.

15. The work implement of claim 9 further comprising one or more fork tines combined with the frame.

16. A work implement comprising:

a frame having a width;

a load rest combined with the frame and extending across the width of the frame in a first plane, wherein the load rest includes a middle portion adjacent to a side portion;

wherein the middle portion of the load rest is a gate movable between an open position and a closed position, wherein in the open position the gate provides a walkway through the load rest and in the closed position the gate functions as part of the load rest to help support the load;

wherein the middle portion of the load rest and the side portion of the load rest are positioned in the first plane when the gate is in the closed position.

17. The work implement of claim 16 wherein the gate is pivotally combined with the load rest.

18. The work implement of claim 16 wherein the gate is pivotally combined with the frame.

19. The work implement of claim 16 wherein the gate is slidably combined with the load rest.

20. The work implement of claim 16 wherein the gate is slidably combined with the frame.

21. The work implement of claim 16 further comprising a step combined with the frame beneath the gate.

Assignments (7)
TERMINATION AND RELEASE OF GRANT OF SECURITY INTEREST IN UNITED STATES PATENTS AND TRADEMARKS Recorded Mar 11, 2019
From: PNC BANK, NATIONAL ASSOCIATION
To: PENGO CORPORATION; PALADIN BRANDS GROUP, INC.; GENESIS ATTACHMENTS, LLC; EMCOR ENCLOSURES, INC.; CWS INDUSTRIES (MFG) CORP.; CRENLO CAB PRODUCTS, INC.
Reel/Frame 048558/0592 →
RELEASE OF SECURITY INTEREST Recorded Mar 11, 2019
From: BANK OF AMERICA, N.A.
To: PALADIN BRANDS GROUP, INC.
Reel/Frame 050117/0001 →
RELEASE OF SECURITY INTEREST Recorded Feb 15, 2018
From: KPS CAPITAL FINANCE MANAGEMENT, LLC
To: PALADIN BRANDS GROUP, INC.
Reel/Frame 045349/0962 →
SECURITY INTEREST Recorded Sep 27, 2017
From: PALADIN BRANDS GROUP, INC., AS GRANTOR
To: KPS CAPITAL FINANCE MANAGEMENT, LLC, AS COLLATERAL AGENT
Reel/Frame 043719/0017 →
SECURITY INTEREST Recorded Sep 27, 2017
From: PALADIN BRANDS GROUP, INC., AS GRANTOR
To: PNC BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 043718/0959 →
SECURITY INTEREST Recorded Sep 26, 2017
From: PALADIN BRANDS GROUP, INC.
To: BANK OF AMERICA, N.A.
Reel/Frame 043689/0174 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 1, 2017
From: PISARIK, RONALD JAMES
To: PALADIN BRANDS GROUP, INC.
Reel/Frame 042567/0764 →