IP Library Granted Patent US 10,649,420
Granted Patent B2
US 10,649,420 · App. 15/648,614 · Granted May 12, 2020

Generator management system and method that selectively activate at least one of a plurality of generators in a power generation system

Inventors: Isaac S. Frampton (Strattanville, PA); Frank C. Formas (Kohler, WI); Joseph Petrus Eduardus Raats (Zevenbergen, NL)
Assignee: Kohler Co.
G05B15/02H02J3/38H02P9/02
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,649,420
App. No.
15/648,614
Granted
May 12, 2020
Kind
B2
Abstract

A method of determining an operation of at least one of a plurality of generators in a power generation system. The method includes identifying a system parameter that is related to operation of the power generation system; and determining which of the plurality of generators to operate to minimize fuel consumption of the power generation system based on the system parameter. Other methods include identifying a system parameter that is related to operation of the power generation system; and determining which of the plurality of generators to operate by optimizing an operating variable of the power generation system based on the system parameter.

Claims (32)

1. A method of operating a plurality of generators to provide power to a load, the method comprising:

comparing a primary operating parameter of each of the plurality of generators, the primary operating parameter being modifiable through generator operation;

determining a first order to operate the plurality of generators based on the comparison of the primary operating parameters;

operating the plurality of generators according to the first order until the primary operating parameter of the plurality of generators is equalized;

comparing a secondary operating parameter of each of the plurality of generators when the primary operating parameter of the plurality of generators is equalized; and

determining a second order to operate the plurality of generators based on the comparison of the secondary operating parameters.

2. The method of claim 1 , wherein the primary operating parameter is generator run time.

3. The method of claim 2 , wherein determining a first order to operate the plurality of generators comprises ordering a generator with the lowest number of total run hours first.

4. The method of claim 1 , wherein the primary operating parameter is fuel level.

5. The method of claim 4 , wherein determining a first order to operate the plurality of generators comprises ordering a generator with the highest fuel level first.

6. The method of claim 1 , wherein the secondary operating parameter is noise emissions.

7. The method of claim 1 , wherein the secondary operating parameter is pollutant emissions.

8. The method of claim 1 , further comprising dynamically changing the first order or the second order in response to a change in the load.

9. A method of operating a plurality of generators, the method comprising:

comparing a primary operating parameter of each of the plurality of generators;

determining a first order to operate the plurality of generators based on the comparison of the primary operating parameters when the primary operating parameter of each of the plurality of generators are not equal;

operating the plurality of generators according to the first order until the primary operating parameter of the plurality of generators is equalized;

comparing a secondary operating parameter of each of the plurality of generators when the primary operating parameter of each of the plurality of generators are equal; and

determining a second order to operate the plurality of generators based on the comparison of the secondary operating parameters when the primary operating parameter of each of the plurality of generators are equal.

10. The method of claim 9 , wherein one of the primary operating parameter and the secondary operating parameter is generator run time.

11. The method of claim 10 , wherein determining the first order to operate the plurality of generators based on the comparison of the primary operating parameters comprises ordering a generator with the lowest number of total run hours first.

12. The method of claim 9 , wherein one of the primary operating parameter and the secondary operating parameter is fuel level.

13. The method of claim 12 , wherein determining the first order to operate the plurality of generators based on the comparison of the primary operating parameters comprises ordering a generator with the highest fuel level first.

14. The method of claim 9 , wherein one of the primary operating parameter and the secondary operating parameter is maintenance cost.

15. The method of claim 9 , wherein one of the primary operating parameter and the secondary operating parameter is pollutant emissions.

16. A system, comprising:

a plurality of generators that are adapted to supply power to a load; and

a control system that operates the plurality of generators, wherein the control system is configured to compare a primary operating parameter of each of the plurality of generators, operate a first subset of the plurality of generators according to a first order until the primary operating parameter of each of the plurality of generators is equalized, and operates a second subset of the plurality of generators based on a comparison of secondary operating parameters when the primary operating parameter of each of the plurality of generators are equal.

17. The system of claim 16 , wherein the control system selectively activates the smallest number of generators possible to power the load.

18. The system of claim 16 , wherein one of the primary system parameter and the secondary operating parameters includes generator load capacity.

19. The system of claim 16 , wherein one of the primary system parameter and the secondary operating parameters includes generator run time or fuel level.

20. The system of claim 16 , wherein one of the primary system parameter and the secondary operating parameters includes noise emissions or pollutant emissions.

Assignments (4)
PATENT SECURITY AGREEMENT (ABL) Recorded May 3, 2024
From: CURTIS INSTRUMENTS, INC.; DISCOVERY ENERGY, LLC; HEILA TECHNOLOGIES, INC.
To: BANK OF AMERICA, N.A., AS COLLATERAL AGENT
Reel/Frame 067306/0903 →
PATENT SECURITY AGREEMENT (TERM) Recorded May 2, 2024
From: CURTIS INSTRUMENTS, INC.; DISCOVERY ENERGY, LLC; HEILA TECHNOLOGIES, INC.
To: BANK OF AMERICA, N.A, AS COLLATERAL AGENT
Reel/Frame 067290/0853 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 1, 2024
From: KOHLER CO.
To: DISCOVERY ENERGY, LLC
Reel/Frame 067289/0516 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 13, 2017
From: FRAMPTON, ISAAC S.; FORMAS, FRANK C.; RAATS, JOSEPH PETRUS EDUARDUS
To: KOHLER CO.
Reel/Frame 042994/0416 →
Continuity (3)
Continuation 14251057 · Apr 11, 2014
Continuation In Part 13540133 · Jul 2, 2012
Related Publication 20170322528A1 · Nov 9, 2017