IP Library Granted Patent US 10,397,979
Granted Patent B2
US 10,397,979 · App. 15/653,223 · Granted Aug 27, 2019

Communication method and communication device

Inventors: Masataka Irie (Kanagawa, JP); Lei Huang (Singapore, SG); Hong Cheng Michael Sim (Singapore, SG)
Assignee: Panasonic Intellectual Property Management Co., Ltd.
H04W84/12H04B7/0623H04W16/14H04W28/06H04W72/0453H04W72/08H04W72/1289H04L5/0053H04L5/0091H04L47/50H04W40/24H04W48/12H04W74/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,397,979
App. No.
15/653,223
Granted
Aug 27, 2019
Kind
B2
Abstract

There is provided a communication method for a coordinator communication device, including generating a first scheduling element to be used by a first communication device and a second scheduling element to be used by a second communication device; and transmitting the first and second scheduling elements to the first and second communication devices. The second scheduling element includes a second allocation indicating a time-frequency resource allocated to the second communication device. The first scheduling element includes a first allocation indicating a time-frequency resource allocated to the first communication device and optionally includes a first virtual allocation that is a duplicate of the second allocation. The first communication device performs communication in accordance with a first communication system using a first frequency band, and the second communication device performs communication in accordance with the first communication system or a second communication system using a second frequency band that includes the first frequency band.

Claims (43)

1. A communication method for a personal basic service set Control Point/Access Point (PCP/AP) device, the communication method comprising:

generating a first scheduling element to be used by at least one first communication device that is a legacy communication device and a second scheduling element to be used by at least one second communication device that is a non-legacy communication device, the first scheduling element and the second scheduling element being included in one frame; and

transmitting the one frame to the at least one first communication device and to the at least one second communication device, wherein

the second scheduling element includes at least one second allocation field indicating information on allocation to the at least one second communication device, and

the first scheduling element includes at least one first allocation field indicating information on allocation to the at least one first communication device and includes at least one third allocation field indicating information on allocation to the at least one second communication device, and

wherein the information in the at least one second allocation field corresponds to a part of the information in the at least one third allocation field,

wherein the at least one first communication device performs communication in accordance with a first communication scheme using a first frequency band and decodes the first scheduling element and does not decode the second scheduling element, and

wherein the at least one second communication device performs communication in accordance with the first communication scheme or a second communication scheme using a second frequency band that includes the first frequency band and decodes the first and second scheduling elements.

2. The communication method according to claim 1 , wherein

the information indicated by the at least one second allocation field is used by the at least one second communication device for communication by using the second communication scheme.

3. The communication method according to claim 1 , wherein

the information indicated by the at least one first allocation field is used by the at least one first communication device or the at least one second communication device for communication by using the first communication scheme.

4. The communication method according to claim 1 , wherein

the first scheduling element includes the at least one of the third allocation field, the at least one of the third allocation field corresponding to a plurality of the second allocation fields.

5. The communication method according to claim 1 , wherein

the PCP/AP device generates a third scheduling element that includes the at least one first allocation field among the first allocation field and the third allocation field, and generates a fourth scheduling element that includes the at least one third allocation field among the first allocation field and the third allocation field.

6. The communication method according to claim 1 , wherein

the second scheduling element includes at least one fourth allocation field indicating information on allocation to the at least one first communication device, the information in the at least one fourth allocation field corresponds to a part of the information in the at least one first allocation field.

7. A communication method for a second communication device, the communication method comprising:

receiving a beacon that is transmitted from a personal basic service set Control Point/Access Point (PCP/AP) device and that includes a first scheduling element to be used by at least one first communication device that is a legacy communication device and a second scheduling element to be used by at least one second communication device that is a non-legacy communication device, the first scheduling element and the second scheduling element being included in one frame;

generating a third allocation field indicating information on allocation to the at least one second communication device;

adding the third allocation field to the first scheduling element; and

transmitting the first scheduling element to which the third allocation field is added and the second scheduling element to the at least one first communication device and to another second communication device other than the second communication device, wherein:

the first scheduling element includes a first allocation field indicating information on allocation to the at least one first communication device,

the second scheduling element includes a second allocation field indicating information on allocation to the at least one second communication device,

the at least one first communication device performs communication in accordance with a first communication scheme using a first frequency band and decodes the first scheduling element and does not decode the second scheduling element,

the at least one second communication device performs communication in accordance with the first communication scheme or a second communication scheme using a second frequency band that includes the first frequency band and decodes the first and second scheduling elements.

8. A personal basic service set Control Point/Access Point (PCP/AP) device comprising:

a generator that generates a first scheduling element to be used by at least one first communication device that is a legacy communication device and a second scheduling element to be used by at least one second communication device that is a non-legacy communication device, the first scheduling element and the second scheduling element being included in one frame; and

a transmitter that transmits the one frame to the at least one first communication device and to the at least one second communication device, wherein

the second scheduling element includes at least one second allocation field indicating information on allocation to the at least one second communication device, and

the first scheduling element includes at least one first allocation field indicating information on allocation to the at least one first communication device and includes at least one third allocation field indicating information on allocation to the at least one second communication device,

wherein the information in the at least one second allocation field corresponds to a part of the information in the at least one third allocation field,

the at least one first communication device performs communication in accordance with a first communication scheme using a first frequency band and decodes the first scheduling element and does not decode the second scheduling element, and

the at least one second communication device performs communication in accordance with the first communication scheme or a second communication scheme using a second frequency band that includes the first frequency band and decodes the first and second scheduling elements.

9. A communication device comprising:

a receiver that receives a beacon that is transmitted from a personal basic service set Control Point/Access Point (PCP/AP) device and that includes a first scheduling element to be used by at least one first communication device that is a legacy communication device and a second scheduling element to be used by the communication device that is a non-legacy communication device, the first scheduling element and the second scheduling element being included in one frame;

a generator that generates at least one third allocation field indicating information on allocation to at least one second communication device, and generates a new first scheduling element obtained by adding the third allocation to the first scheduling element; and

a transmitter that transmits, to the at least one first communication device and to another second communication device other than the communication device, the second scheduling element and the new first scheduling element, wherein

the new first scheduling element includes the at least one third allocation field, and a first allocation field indicating information on allocation to the at least one first communication device, and

the second scheduling element includes a second allocation field indicating information on allocation to the at least one second communication device,

wherein the at least one first communication device performs communication in accordance with a first communication scheme using a first frequency band and decodes the first scheduling element and does not decode the second scheduling element,

wherein the at least one second communication device performs communication in accordance with the first communication scheme or a second communication scheme using a second frequency band that includes the first frequency band and decodes the first and second scheduling elements.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 2, 2021
From: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
To: APPLE INC.
Reel/Frame 055809/0200 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 27, 2017
From: IRIE, MASATAKA; HUANG, LEI; SIM, HONG CHENG MICHAEL
To: PANASONIC INTELLECTUAL PROPERTY MANAGEMENT CO., LTD.
Reel/Frame 043707/0672 →
Priority Claims (1)
JP 2015-056352 · Mar 19, 2015 · national
Continuity (2)
Continuation PCTJP2016000180 · Jan 15, 2016
Related Publication 20170318621A1 · Nov 2, 2017