IP Library Granted Patent US 10,526,259
Granted Patent B2
US 10,526,259 · App. 15/755,810 · Granted Jan 7, 2020

Staged pressure for butadiene reactors to enhance energy recovery

Inventors: John J. Senetar (Des Plaines, IL); Jillian M. Horn (Decatur, GA)
Assignees: UOP LLC; TPC Group LLC
C07C5/48C07C2523/02C07C2523/22C07C2523/26C07C2523/28C07C2523/745C07C2523/80Y02P20/51
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,526,259
App. No.
15/755,810
Granted
Jan 7, 2020
Kind
B2
Abstract

A process is presented for the oxidative dehydrogenation of butenes to butadienes. The process includes the use of parallel reactors, wherein the reactors are operated at different pressures. A butene feedstream is split into several portions wherein each portion is passed to a different reactor. Each reactor generates an effluent stream, and the effluent stream is cooled to generate steam for use in a lower pressure reactor.

Claims (30)

1. A process for the production of 1,3 butadiene, comprising:

splitting a feedstream comprising butene into two portions;

passing an oxidizing agent and a first steam stream to a first reactor;

passing a first portion of the feedstream to the first reactor operated at first reaction conditions including a first pressure to generate a first reactor effluent;

passing water and the first reactor effluent through a heat exchanger to generate a second steam stream having a pressure less than the first stream and a cooled first reactor effluent;

passing an oxidizing agent and the second steam stream to a second reactor; and

passing a second portion of the feedstream to the second reactor operated at second reaction conditions including a second pressure less than the first pressure to generate a second reactor effluent.

2. The process of claim 1 further comprising passing the cooled first reactor effluent to a quench tower to generate a quenched first reactor effluent.

3. The process of claim 1 further comprising passing the second reactor effluent to a second quench tower to generate a quenched second reactor effluent.

4. The process of claim 1 wherein the first pressure is in a range of 300 kPa to 800 kPa.

5. The process of claim 1 wherein the second pressure is in a range of 100 kPa to 300 kPa.

6. The process of claim 1 wherein the oxidizing agent is air.

7. The process of claim 1 wherein a steam to butene ratio in the first reactor is greater than 9:1.

8. The process of claim 1 wherein a steam to butene ratio in the second reactor is between 1:1 and 5:1.

9. The process of claim 1 wherein the first reaction conditions include a catalyst on a support.

10. The process of claim 9 wherein the catalyst is selected from the group consisting of zinc ferrite, vanadium oxide, molybdenum oxide, chromium oxide, vanadium-magnesium oxide catalyst, and a combination of the metal oxides.

11. The process of claim 9 wherein the support is selected from the group consisting of zirconia, titania, refractory materials, and mixtures thereof.

12. A process for the oxidative dehydrogenation of a butene feedstock, comprising:

splitting the butene feedstock into a plurality of portions, wherein each portion is passed to a separate reactor in a plurality of reactors, and wherein the reactors are operated at different pressures, and wherein the reactors operating in parallel have decreasing pressures with a first reactor having the highest pressure and each subsequent reactor having a lower pressure than a previous reactor;

passing an oxidizing agent to each reactor;

passing steam to each reactor, wherein the amount and pressure of steam passed to the first reactor being the highest and wherein the amount and pressure of steam passed to each subsequent reactor is less than the amount and pressure passed to the previous reactor to generate an effluent stream from each reactor; and

passing each reactor effluent to a quench tower to generate a cooled process stream with a reduced water content compared to the reactor effluent prior to quenching.

13. The process of claim 12 wherein the plurality of reactors is between 2 and 6 reactors.

14. The process of claim 12 further comprising passing each cooled process stream to a compressor to generate a compressed product stream.

15. The process of claim 12 wherein the pressures in the reactors range from 1000 kPa to 100 kPa.

16. The process of claim 12 wherein a steam to butene ratio of the first reactor is greater than 9:1 and each subsequent reactor has a lower steam to butene ration that the previous reactor.

17. The process of claim 12 wherein the steam used in each reactor after the first reactor is partially generated by cooling the effluent stream from the first reactor.

18. The process of claim 17 wherein the ratio of steam to butene decreases from the first reactor to the last reactor.

19. The process of claim 12 further comprising passing the cooled process streams to a compressor to generate a compressed product stream.

20. The process of claim 19 further comprising passing the compressed product streams to a butadiene recovery unit.

Assignments (17)
SECURITY INTEREST Recorded Dec 16, 2024
From: TPC GROUP LLC
To: JEFFERIES FINANCE LLC, AS AGENT
Reel/Frame 069594/0055 →
RELEASE OF SECURITY INTEREST Recorded Dec 16, 2024
From: GLAS TRUST COMPANY LLC
To: TPC GROUP LLC
Reel/Frame 069602/0182 →
TERMINATION AND RELEASE OF GRANT OF SECURITY INTEREST IN UNITED STATES PATENTS AT REEL/FRAME 060287/0820 Recorded Dec 20, 2022
From: GLAS AMERICAS LLC, AS COLLATERAL AGENT
To: TPC GROUP LLC
Reel/Frame 062171/0674 →
TERMINATION AND RELEASE OF SUPPLEMENTAL GRANT OF SECURITY INTEREST IN UNITED STATES PATENTS AT REEL/FRAME 055119/0158 Recorded Dec 20, 2022
From: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS SUCCESSOR COLLATERAL AGENT TO U.S. BANK NATIONAL ASSOCIATION
To: TPC GROUP LLC
Reel/Frame 062171/0666 →
TERMINATION AND RELEASE OF SUPPLEMENTAL GRANT OF SECURITY INTEREST IN UNITED STATES PATENTS AT REEL/FRAME 051754/0914 Recorded Dec 20, 2022
From: U.S. BANK TRUST COMPANY, NATIONAL ASSOCIATION, AS SUCCESSOR COLLATERAL AGENT TO U.S. BANK NATIONAL ASSOCIATION
To: TPC GROUP LLC
Reel/Frame 062171/0652 →
RELEASE OF SECURITY INTEREST AT REEL/FRAME 60113/0169 Recorded Dec 16, 2022
From: ECLIPSE BUSINESS CAPITAL LLC, AS AGENT
To: TPC GROUP LLC
Reel/Frame 062142/0523 →
SECURITY INTEREST Recorded Dec 16, 2022
From: TPC GROUP LLC
To: ECLIPSE BUSINESS CAPITAL LLC, AS COLLATERAL AGENT
Reel/Frame 062130/0001 →
SECURITY INTEREST Recorded Dec 16, 2022
From: TPC GROUP LLC
To: GLAS TRUST COMPANY LLC, AS COLLATERAL AGENT
Reel/Frame 062130/0137 →
RELEASE OF SECURITY INTEREST AT REEL/FRAME 49942/0467 Recorded Jun 8, 2022
From: BANK OF AMERICA, N.A., AS AGENT
To: TPC GROUP LLC
Reel/Frame 060392/0673 →
RELEASE OF SECURITY INTEREST AT REEL/FRAME 56544/0168 Recorded Jun 8, 2022
From: BANK OF AMERICA, N.A., AS AGENT
To: TPC GROUP LLC
Reel/Frame 060307/0988 →
GRANT OF SECURITY INTEREST IN UNITED STATES PATENTS Recorded Jun 6, 2022
From: TPC GROUP LLC
To: GLAS AMERICAS LLC, AS COLLATERAL AGENT
Reel/Frame 060287/0820 →
SECURITY INTEREST Recorded Jun 6, 2022
From: TPC GROUP LLC
To: ECLIPSE BUSINESS CAPITAL LLC, AS AGENT
Reel/Frame 060113/0169 →
SUPPLEMENTAL GRANT OF SECURITY INTEREST IN UNITED STATES PATENTS Recorded Jun 10, 2021
From: TPC GROUP LLC
To: BANK OF AMERICA, N.A.
Reel/Frame 056544/0168 →
SECURITY INTEREST Recorded Feb 2, 2021
From: TPC GROUP LLC
To: U.S. BANK NATIONAL ASSOCIATION, AS AGENT
Reel/Frame 055119/0158 →
SECURITY INTEREST Recorded Feb 7, 2020
From: TPC GROUP LLC
To: U.S. BANK NATIONAL ASSOCIATION
Reel/Frame 051754/0914 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 10, 2019
From: HORN, JILLIAN M.
To: TPC GROUP LLC
Reel/Frame 050329/0251 →
SECURITY INTEREST Recorded Aug 2, 2019
From: TPC GROUP LLC
To: BANK OF AMERICA, N.A.
Reel/Frame 049942/0467 →
Continuity (2)
Provisional Application 62211781 · Aug 29, 2015
Related Publication 20180327337A1 · Nov 15, 2018