US 10,882,049 · App. 15/770,713 · Granted Jan 5, 2021

Tool for working abrasive materials

Inventors: Eduardo Rossiter (Hamm, DE); Christian Neyer (Osnabrück, DE)
Assignees: THYSSENKRUPP INDUSTRIAL SOLUTIONS AG; THYSSENKRUPP AG
B02C13/2804B02C18/18B02C2210/02E02F9/285
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,882,049
App. No.
15/770,713
Granted
Jan 5, 2021
Kind
B2
Abstract

A tool for processing abrasive materials, in particular rocks, sand or ores, may include a main tool body and a hard metal plate positioned on the main tool body. A build-up weld may be applied to a surface of the hard metal plate and to the main tool body to bond the hard metal plate to the main tool body. Further, a method for producing or treating such a tool may involve positioning the hard metal plate on the main tool body and applying a build-up weld to the hard metal plate and the main tool body such that the hard metal plate is attached to the main tool body.

Claims (28)

1. A tool for processing abrasive materials, the tool comprising:

a main tool body;

a hard metal plate disposed on the main tool body; and

a build-up weld, wherein the hard metal plate is attached to the main tool body via the build-up weld, wherein the build-up weld is disposed on a surface of the hard metal plate and on the main tool body.

2. The tool of claim 1 wherein the hard metal plate is disposed on the main tool body so as to extend in a direction in which a force is configured to act on the tool.

3. The tool of claim 1 wherein the hard metal plate is disposed in a groove formed in a surface of the main tool body.

4. The tool of claim 1 wherein the hard metal plate is a first hard metal plate and the build-up weld is a first build-up weld, the tool comprising a second hard metal plate bonded to the main tool body by way of a second build-up weld.

5. The tool of claim 4 wherein the first and second hard metal plates are disposed parallel to one another.

6. The tool of claim 4 wherein the first hard metal plate is adjacent to the second hard metal plate and is bonded to the second hard metal plate by way of one of the build-up welds.

7. The tool of claim 1 wherein the hard metal plate is a first hard metal plate, wherein the tool comprises a second hard metal plate, wherein the main tool body comprises a first groove and a second groove, wherein the first hard metal plate is disposed in the first groove and the second hard metal plate is disposed in the second groove.

8. The tool of claim 1 wherein the main tool body comprises an indentation in which the hard metal plate is disposed.

9. The tool of claim 8 wherein the hard metal plate fills a cross section of the indentation in the main tool body.

10. The tool of claim 1 wherein a thickness of the build-up weld is greater than a thickness of the hard metal plate.

11. The tool of claim 1 wherein the hard metal plate comprises 90-94% tungsten carbide and 6-10% cobalt.

12. A processing apparatus for processing abrasive materials, the processing apparatus comprising a tool that includes

a main tool body;

a hard metal plate disposed on the main tool body; and

a build-up weld, wherein the hard metal plate is attached to the main tool body via the build-up weld, wherein the build-up weld is disposed on a surface of the hard metal plate and on the main tool body.

13. A method for producing or treating a tool for processing abrasive materials, wherein the tool comprises a main tool body, the method comprising:

positioning a first hard metal plate on the main tool body; and

applying a first build-up weld to the first hard metal plate and the main tool body to attach the first hard metal plate to the main tool body.

14. The method of claim 13 comprising positioning a second hard metal plate on the main tool body such that the second hard metal plate is parallel to the first hard metal plate.

15. The method of claim 14 comprising bonding the second hard metal plate to the main tool body and to the first hard metal plate, which is adjacent to the second hard metal plate, by way of a second build-up weld.

16. The method of claim 13 comprising machining a surface of the main tool body before the first hard metal plate is positioned on the main tool body.

17. The method of claim 13 comprising positioning the first hard metal plate on the main tool body such that the first hard metal plate extends in a direction in which a force is configured to act on the tool.

18. The method of claim 13 comprising forming a groove into a surface of the main tool body before positioning the first hard metal plate on the main tool body, wherein the first hard metal plate is positioned in the groove.

19. The method of claim 13 comprising forming first and second grooves that are parallel into a surface of the main tool body before positioning the first hard metal plate on the main tool body, wherein the first hard metal plate is positioned in the first groove and a second hard metal plate is positioned in the second groove.

20. The method of claim 13 wherein the main tool body comprises an indentation, wherein the first hard metal plate is positioned in the indentation.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 29, 2022
From: THYSSENKRUPP INDUSTRIAL SOLUTIONS AG
To: FLSMIDTH A/S
Reel/Frame 061571/0838 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 21, 2018
From: ROSSITER, EDUARDO; NEYER, CHRISTIAN
To: THYSSENKRUPP INDUSTRIAL SOLUTIONS AG; THYSSENKRUPP AG
Reel/Frame 046168/0195 →
Priority Claims (1)
DE 10 2015 222 020 · Nov 9, 2015 · national
Continuity (1)
Related Publication 20180250681A1 · Sep 6, 2018