IP Library Granted Patent US 10,753,276
Granted Patent B2
US 10,753,276 · App. 15/777,486 · Granted Aug 25, 2020

Gas turbine system

Inventors: Ghenadie Bulat (Lincoln, GB); Timothy Hughes (Wantage, GB); Jonathan May (Lincoln, GB); Ian Wilkinson (Witney, GB)
Assignee: Siemens Aktiengesellschaft
F02C3/22C01B3/047F02C3/28F02C6/003C01B2203/1614C01B2203/84F05D2220/70Y02E60/364
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,753,276
App. No.
15/777,486
Granted
Aug 25, 2020
Kind
B2
Abstract

A gas turbine system has a source of ammonia and a source of an oxygen-containing gas, a first combustion chamber connected to receive ammonia, a hydrogen-rich gas stream and oxygen-containing gas, a turbine connected to receive an exhaust gas stream from the first combustion chamber; and a second combustion chamber connected to receive an exhaust gas from the turbine, ammonia and a hydrogen-rich gas stream.

Claims (27)

1. A gas turbine system comprising:

an ammonia source and an oxygen-containing gas source;

a first combustion chamber connected to receive a first ammonia gas stream, a first hydrogen-comprising gas stream, and an oxygen-containing gas stream;

a first turbine connected to receive a first exhaust gas stream from the first combustion chamber;

a second combustion chamber connected to receive a second exhaust gas stream from the first turbine, a second ammonia gas stream, and a second hydrogen-comprising gas stream;

said ammonia source connected to the first combustion chamber to provide the first ammonia gas stream to the first combustion chamber;

said ammonia source also connected to the second combustion chamber to provide the second ammonia gas stream to the second combustion chamber; and

a first cracker chamber arranged to receive a third ammonia gas stream from the ammonia source and to supply the first hydrogen-comprising gas stream to the first combustion chamber.

2. A gas turbine system as claimed in claim 1 further comprising a second cracker chamber arranged to receive a fourth ammonia gas stream from the ammonia source and to supply the second hydrogen-comprising gas stream to the second combustion chamber.

3. A gas turbine system as claimed in claim 2 wherein a temperature of at least one of said first cracker chamber and said second cracker chamber is regulated by mass control of a flow of a third exhaust gas stream from the second combustion chamber.

4. A gas turbine system as claimed in claim 1 further comprising a heat exchanger arranged to receive a third exhaust gas stream from the second combustion chamber.

5. A gas turbine system as claimed in claim 4 comprising a second turbine, which is a steam turbine operated by heat derived from said heat exchanger.

6. A method for extracting energy from ammonia, comprising:

providing an oxygen-containing gas stream to a first combustion chamber;

providing a first ammonia gas stream to the first combustion chamber;

providing a first hydrogen-comprising gas stream to the first combustion chamber;

performing a first combustion in the first combustion chamber that produces a first exhaust gas stream;

providing said first exhaust gas stream from said first combustion chamber to a second combustion chamber;

supplying a second ammonia gas stream to the second combustion chamber;

supplying a second hydrogen-comprising gas stream to the second combustion chamber;

performing a second combustion in the second combustion chamber with an enhanced equivalence ratio;

generating the first hydrogen-comprising gas stream, which is supplied through the first combustion chamber, by cracking a third ammonia stream; and

connecting a turbine to receive the first exhaust gas stream from the first combustion chamber and providing a second exhaust gas stream from the turbine to the second combustion chamber, thereby causing the turbine to generate a mechanical output.

7. A method for extracting energy from ammonia as claimed in claim 6 wherein said equivalence ratio is in a range between 1.0 and 1.2.

8. A method as claimed in claim 6 comprising generating the second hydrogen-comprising gas stream to the second combustion chamber by cracking a fourth ammonia stream.

9. A method as claimed in claim 8 comprising conducting said cracking the third ammonia stream or the fourth ammonia stream at an elevated temperature provided by a third exhaust gas stream from the second combustion chamber.

10. A method as claimed in claim 6 comprising removing waste heat from a third exhaust gas stream from the second combustion chamber, and recovering energy from said waste heat.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 5, 2021
From: SIEMENS AKTIENGESELLSCHAFT
To: SIEMENS ENERGY GLOBAL GMBH & CO. KG
Reel/Frame 056501/0020 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2018
From: HUGHES, TIMOTHY, MR.; WILKINSON, IAN, MR.
To: SIEMENS PLC
Reel/Frame 047695/0786 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2018
From: BULAT, GHENADIE; MAY, JONATHAN, MR.
To: SIEMENS INDUSTRIAL TURBOMACHINERY LIMITED
Reel/Frame 047696/0387 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2018
From: SIEMENS INDUSTRIAL TURBOMACHINERY LIMITED
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 047696/0494 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 6, 2018
From: SIEMENS PLC
To: SIEMENS AKTIENGESELLSCHAFT
Reel/Frame 047696/0577 →
Priority Claims (1)
GB 1520612.1 · Nov 20, 2015 · national
Continuity (1)
Related Publication 20180355794A1 · Dec 13, 2018
Cited By (4)
US 12,222,106 US 12,429,225 US 12,473,856 US 12,644,422