IP Library Granted Patent US 10,633,828
Granted Patent B2
US 10,633,828 · App. 15/781,313 · Granted Apr 28, 2020

Hydraulic control device and hydraulic control method for construction machine

View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,633,828
App. No.
15/781,313
Granted
Apr 28, 2020
Kind
B2
Abstract

A hydraulic control apparatus for construction machinery, includes an accumulator to accumulate a high-pressure hydraulic oil discharged from a boom cylinder for driving a boom of the construction machinery, a hydraulic pump connected to the accumulator and driven by the high-pressure hydraulic oil, a pressure sensor configured to detect a pressure of the accumulator, and a control unit connected to the accumulator and the hydraulic motor and configured to control operations of the accumulator and the hydraulic motor, and having a determiner that receives a pressure value of the accumulator and number of revolution of the hydraulic motor to determine whether or not the hydraulic motor fails when the hydraulic oil accumulated in the accumulator is supplied to the hydraulic motor.

Claims (29)

1. A hydraulic control apparatus for construction machinery comprising:

an accumulator to accumulate a high-pressure hydraulic oil discharged from a boom cylinder for driving a boom of the construction machinery;

a hydraulic pump connected to the accumulator and driven by the high-pressure hydraulic oil;

a pressure sensor configured to detect a pressure of the accumulator; and

a control unit connected to the accumulator and a hydraulic motor and configured to control operations of the accumulator and the hydraulic motor, and having a determiner that receives a pressure value of the accumulator and a number of revolution of the hydraulic motor to determine whether or not the hydraulic motor fails when the hydraulic oil accumulated in the accumulator is supplied to the hydraulic motor.

2. The hydraulic control apparatus for construction machinery of claim 1 , wherein the determiner comprises

a first calculator to calculate a volume change of the accumulator from the pressure value of the accumulator;

a second calculator to calculate a flow rate of the hydraulic oil flowing through the hydraulic motor from the number of revolution of the hydraulic motor; and

a comparer to compare the volume change and the flow rate to determine a failure in the hydraulic motor and output a control signal.

3. The hydraulic control apparatus for construction machinery of claim 1 , wherein the hydraulic motor includes a variable displacement hydraulic motor.

4. The hydraulic control apparatus for construction machinery of claim 3 , wherein when it is determined that the hydraulic motor fails, the control unit controls such that the hydraulic oil discharged from the boom cylinder is blocked from being supplied to the hydraulic motor and a pilot pressure from a manipulation portion is supplied to a main control valve.

5. The hydraulic control apparatus for construction machinery of claim 4 , wherein the hydraulic oil discharged from a boom head chamber of the boom cylinder is drained to a drain tank through the main control valve.

6. The hydraulic control apparatus for construction machinery of claim 1 , wherein when it is determined that the hydraulic motor operates normally, the control unit controls such that a pilot pressure from a manipulation portion is blocked from being transferred to a main control valve.

7. The hydraulic control apparatus for construction machinery of claim 6 , further comprising a bypass valve provided between the manipulation portion and the main control valve to block the pilot pressure from being transferred to the main control valve.

8. The hydraulic control apparatus for construction machinery of claim 1 , wherein the accumulator and the hydraulic motor are connected to a boom head chamber of the boom cylinder through a hydraulic regeneration line.

9. The hydraulic control apparatus for construction machinery of claim 8 , further comprising a regeneration valve unit installed in the hydraulic regeneration line, wherein the regeneration valve unit includes a discharge amount control valve to control an amount of the hydraulic oil flowing through the hydraulic regeneration line.

10. The hydraulic control apparatus for construction machinery of claim 1 , wherein the hydraulic motor is connected to a drive axis of an engine to provide a rotational force to a hydraulic pump that supplies the hydraulic oil to the boom cylinder.

11. A hydraulic control method for construction machinery, comprising:

supplying a hydraulic oil accumulated in an accumulator to a hydraulic motor so as to regenerate energy of the hydraulic oil discharged from a boom cylinder of the construction machinery;

calculating a volume change of the accumulator and a flow rate of the hydraulic oil flowing through the hydraulic motor; and

comparing the volume change and the flow rate to determine whether or not the hydraulic motor fails.

12. The hydraulic control method for construction machinery of claim 11 , wherein calculating the volume change of the accumulator and the flow rate of the hydraulic oil flowing through the hydraulic motor comprises

detecting a pressure of the accumulator to calculate the volume change of the accumulator; and

calculating the flow rate of the hydraulic oil flowing through the hydraulic motor from a number of revolution of the hydraulic motor.

13. The hydraulic control method for construction machinery of claim 11 , further comprising when it is determined that the hydraulic motor fails, blocking the hydraulic oil discharged from the boom cylinder from being supplied to the hydraulic motor and supplying a pilot pressure from a manipulation portion to a main control valve.

14. The hydraulic control method for construction machinery of claim 13 , further comprising draining the hydraulic oil discharged from a boom head chamber of the boom cylinder to a drain tank through the main control valve.

15. The hydraulic control method for construction machinery of claim 11 , further comprising when it is determined that the hydraulic motor operates normally, blocking a pilot pressure from a manipulation portion from being transferred to a main control valve.

16. The hydraulic control method for construction machinery of claim 15 , further comprising supplying the hydraulic oil from a boom head chamber of the boom cylinder to the accumulator or the hydraulic motor through a hydraulic regeneration line.

17. The hydraulic control method for construction machinery of claim 11 , wherein the hydraulic motor is connected to a drive axis of an engine to provide a rotational force to a hydraulic pump that supplies the hydraulic oil to the boom cylinder.

Assignments (3)
CHANGE OF NAME Recorded Dec 4, 2023
From: DOOSAN INFRACORE CO., LTD.
To: HYUNDAI DOOSAN INFRACORE CO., LTD.
Reel/Frame 065761/0942 →
CHANGE OF NAME Recorded Dec 4, 2023
From: HYUNDAI DOOSAN INFRACORE CO., LTD.
To: HD HYUNDAI INFRACORE CO., LTD.
Reel/Frame 065761/0957 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 3, 2018
From: JOO, CHOON-SHIK
To: DOOSAN INFRACORE CO., LTD.
Reel/Frame 046712/0192 →