IP Library Granted Patent US 10,604,915
Granted Patent B2
US 10,604,915 · App. 15/781,434 · Granted Mar 31, 2020

Hydraulic system and hydraulic control method for construction machine

Inventor: Choon-shik Joo (Incheon, KR)
Assignee: DOOSAN INFRACORE CO., LTD.
E02F9/2267E02F9/2217E02F9/2246E02F9/2292E02F9/2296F02D29/04F15B2211/88
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,604,915
App. No.
15/781,434
Granted
Mar 31, 2020
Kind
B2
Abstract

A hydraulic system for construction machinery includes a boom cylinder, a main control valve including a boom control spool that is configured to selectively supply a hydraulic oil from a hydraulic pump to a boom head chamber and a boom rod chamber of the boom cylinder, a regeneration device connected to the boom head chamber of the boom cylinder through a hydraulic regeneration line, a regeneration valve unit installed in the regeneration line, and a control unit connected to the main control valve and the regeneration valve unit, wherein in a boom down low speed mode the hydraulic oil is drained through the regeneration device to lower the boom at a first speed, and in a boom down high speed mode the hydraulic oil is drained through the regeneration device and the main control valve to lower the boom at a second speed greater than the first speed.

Claims (28)

1. A hydraulic system for construction machinery, comprising:

a boom cylinder configured to operate a boom of the construction machinery;

a main control valve including a boom control spool configured to selectively supply a hydraulic oil from a hydraulic pump to a boom head chamber through a boom head hydraulic line and a boom rod chamber of the boom cylinder through a boom rod hydraulic line;

a regeneration device connected to the boom head chamber of the boom cylinder through a hydraulic regeneration line to regenerate energy of the boom cylinder;

a regeneration valve unit installed in the hydraulic regeneration line and including a discharge amount control valve configured to control an amount of the hydraulic oil flowing through the hydraulic regeneration line;

a control unit connected to the main control valve and the regeneration valve unit and configured to control operations of the main control valve and the regeneration valve unit; and

a bypass valve provided between a manipulation portion for manipulating the boom and the main control valve and configured to block a control pressure from the manipulation portion from being transferred to the main control valve,

wherein,

in a boom down low speed mode, the hydraulic oil is drained through the regeneration device to lower the boom at a first speed, and

in a boom down high speed mode, the hydraulic oil is drained through the regeneration device and the main control valve to lower the boom at a second speed greater than the first speed.

2. The hydraulic system for construction machinery of claim 1 , wherein the regeneration valve unit further comprises a check valve installed in the hydraulic regeneration line between the boom head chamber and the discharge amount control valve.

3. The hydraulic system for construction machinery of claim 1 , wherein the regeneration valve unit further comprises an opening/closing valve installed in a connection line which connects the hydraulic regeneration line to the boom rod chamber and configured to selectively supply a portion of the hydraulic oil discharged through the hydraulic regeneration line to the boom rod chamber.

4. The hydraulic system for construction machinery of claim 1 , wherein the regeneration device comprises a hydraulic motor connected to the hydraulic regeneration line and the hydraulic motor is connected to a drive axis of an engine to provide a rotational force to the hydraulic pump.

5. The hydraulic system for construction machinery of claim 4 , wherein the regeneration device further comprises an accumulator connected to the hydraulic regeneration line.

6. The hydraulic system for construction machinery of claim 5 , further comprising:

an opening/closing valve installed in the hydraulic regeneration line connected to the accumulator and configured to selectively supply the hydraulic oil to the accumulator.

7. A hydraulic system for construction machinery, comprising:

a boom cylinder configured to operate a boom of the construction machinery;

a main control valve including a boom control spool configured to selectively supply a hydraulic oil from a hydraulic pump to a boom head chamber through a boom head hydraulic line and a boom rod chamber of the boom cylinder through a boom rod hydraulic line;

a regeneration device connected to the boom head chamber of the boom cylinder through a hydraulic regeneration line to regenerate energy of the boom cylinder;

a regeneration valve unit installed in the hydraulic regeneration line and including a discharge amount control valve configured to control an amount of the hydraulic oil flowing through the hydraulic regeneration line; and

a control unit connected to the main control valve and the regeneration valve unit and configured to control operations of the main control valve and the regeneration valve unit

wherein,

in a boom down low speed mode, the hydraulic oil is drained through the regeneration device to lower the boom at a first speed, and

in a boom down high speed mode, the hydraulic oil is drained through the regeneration device and the main control valve to lower the boom at a second speed greater than the first speed, and

wherein the control unit controls such that, in the boom down low speed mode, the discharge amount control valve is opened and a control pressure from a manipulation portion is blocked from being transferred to the boom control spool.

8. The hydraulic system for construction machinery of claim 7 , wherein the control unit controls such that, in the boom down high speed mode, the discharge amount control valve is opened and a control pressure from a manipulation portion is transferred to the boom control spool.

9. The hydraulic system for construction machinery of claim 8 , wherein the hydraulic oil from the boom head chamber is drained to a drain tank through the boom head hydraulic line and the boom control spool.

Assignments (4)
MERGER Recorded Jul 15, 2026
From: HD HYUNDAI INFRACORE CO., LTD.
To: HD CONSTRUCTION EQUIPMENT CO., LTD.
Reel/Frame 075281/0543 →
CHANGE OF NAME Recorded Dec 4, 2023
From: DOOSAN INFRACORE CO., LTD.
To: HYUNDAI DOOSAN INFRACORE CO., LTD.
Reel/Frame 065761/0942 →
CHANGE OF NAME Recorded Dec 4, 2023
From: HYUNDAI DOOSAN INFRACORE CO., LTD.
To: HD HYUNDAI INFRACORE CO., LTD.
Reel/Frame 065761/0957 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 3, 2018
From: JOO, CHOON-SHIK
To: DOOSAN INFRACORE CO., LTD.
Reel/Frame 046797/0093 →
Priority Claims (1)
KR 10-2015-0172666 · Dec 4, 2015 · national
Continuity (1)
Related Publication 20180355584A1 · Dec 13, 2018
Cited By (1)
US 12,352,293