IP Library Granted Patent US 10,167,420
Granted Patent B1
US 10,167,420 · App. 15/788,457 · Granted Jan 1, 2019

Loss circulation compositions (LCM) having portland cement clinker

Inventor: B. Raghava Reddy (Pearland, TX)
Assignee: SAUDI ARABIAN OIL COMPANY
C09K8/487C04B28/04C09K8/08C09K8/426E21B21/003E21B33/138C04B2103/0062C04B2103/0067
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,167,420
App. No.
15/788,457
Granted
Jan 1, 2019
Kind
B1
Abstract

Portland cement clinker LCMs that include Portland cement clinker to mitigate or prevent lost circulation in a well are provided. A Portland cement clinker LCM may include Portland cement clinker, Portland cement, a carrier fluid, and an inorganic consolidation activator. Another Portland cement clinker LCM may include Portland cement clinker and a crosslinked fluid, such as a polyuronide crosslinked via calcium ions or a polysaccharide crosslinked via divinyl sulfone. Yet another Portland cement clinker LCM may include Portland cement clinker and polymer fibers or particulate glass. Methods of lost circulation control using a Portland cement clinker LCM are also provided.

Claims (15)

1. A method to control lost circulation in a lost circulation zone in a wellbore, comprising:

introducing a lost circulation material (LCM) into the wellbore such that the LCM contacts the lost circulation zone and reduces a rate of lost circulation into the lost circulation zone as compared to a period before introducing the LCM, wherein the LCM comprises:

Portland cement clinker, wherein the Portland cement clinker consists of non-hydraulic, non-cementiceous unground Portland cement clinker particles; and

a polyuronide, the polyuronide selected to crosslink in the presence of calcium dissolved from the clinker.

2. The method of claim 1 , wherein the Portland cement clinker comprises ASTM International Type I cement clinker, ASTM International Type V cement clinker, API Class A cement clinker, and API Class G cement clinker.

3. The method of claim 1 , wherein the polyuronide comprises an alginate or a pectinate.

4. The method of claim 1 , wherein the polyuronide comprises apple pectin or citrus pectin.

5. The method of claim 1 , wherein the polyuronide comprises an amount in the range of 0.5 weight of the total weight (w/w %) by weight of water to 3 w/w % by weight of water.

6. The method of claim 1 , wherein the cement clinker comprises a plurality of particles each having a diameter greater than 1 centimeter.

7. The method of claim 1 , comprising maintaining the LCM in contact with the lost circulation zone for a time period, such that the LCM forms at least one plug.

8. The method of claim 7 , wherein the time period is in the range of 24 hours to 76 hours.

9. The method of claim 1 , wherein the lost circulation zone is located in a karst formation.

10. The method of claim 1 , wherein introducing a lost circulation material (LCM) into the wellbore comprises:

mixing the Portland cement clinker with water comprising dissolved polyuronide to form a mixture; and

pumping the mixture into the lost circulation zone.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 23, 2017
From: ARAMCO SERVICES COMPANY
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 044260/0007 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 23, 2017
From: REDDY, B. RAGHAVA
To: ARAMCO SERVICES COMPANY
Reel/Frame 043922/0081 →
Continuity (1)
Provisional Application 62535024 · Jul 20, 2017