IP Library Granted Patent US 10,685,084
Granted Patent B2
US 10,685,084 · App. 15/846,231 · Granted Jun 16, 2020

Device and method for managing risk in area

Inventor: Shih-Cheng Wang (New Taipei, TW)
Assignee: HONGFUJIN PRECISION ELECTRONICS (TIANJN) CO., LTD.
G06F17/18G06F30/00G06Q10/0635G06Q10/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,685,084
App. No.
15/846,231
Granted
Jun 16, 2020
Kind
B2
Abstract

A risk managing device for monitoring and managing one or more areas at risk, includes an obtaining module, a setting module, an updating module, a calculating module, and a sorting module. The obtaining module obtains live inspection information of an area. The setting module sets a Severity, Occurrence, and Detection (SOD) score for each failure factor of each safety device. The updating module updates the SOD score of each failure factor of each safety device according to the live inspection information. The calculating module calculates a grey correlation degree of each safety device according to updated SOD score. The sorting module outputs a risk sorting list of the plurality of safety devices of the area according to the grey correlation degree of each safety device. A risk managing method is also provided.

Claims (47)

1. A risk managing device comprising:

at least one processor;

a storage; and

one or more programs that are stored in the storage and executed by the at least one processor, the one or more programs comprising instructions for:

obtaining live inspection information of a plurality of safety devices of an area, wherein each safety device comprises a plurality of failure factors;

setting a severity, occurrence, and detection (SOD) score for each failure factor of each safety device, wherein the SOD score comprises a severity (Sev) score, an occurrence (Occ) score, and a detection (Det) score;

updating the SOD score of each failure factor of each safety device according to the live inspection information of each safety device;

calculating a difference value between the updated SOD score and an SOD score of a reference sequence;

calculating a grey correlation degree of each safety device according to the difference value; and

outputting a risk sorting list of the plurality of safety devices of the area according to the grey correlation degree of each safety device.

2. The risk managing device of claim 1 , wherein the instruction of setting the SOD score for each failure factor of each safety device comprises:

setting the Sev score, the Occ score, and the Det score for each failure factor of each safety device according to a failure mode and effect analysis (FMEA) scoring rule.

3. The risk managing device of claim 2 , wherein the Sev score and the Det score are scored according to a predetermined scoring rule, the Occ score is set as an initial score according to the FMEA scoring rule.

4. The risk managing device of claim 3 , wherein the instruction of updating the SOD score of each failure factor of each safety device according to the live inspection information of each safety device comprises:

updating the initial score of the Occ score of each failure factor of each safety device according to the live inspection information of each safety device.

5. The risk managing device of claim 1 , wherein the instruction of calculating the grey correlation degree of each safety device according to the difference value comprises:

calculating a grey relational coefficient of each failure factor of each safety device according to the difference value; and

calculating the grey correlation degree of each safety device according to the grey relational coefficient of each failure factor of each safety device.

6. The risk managing device of claim 5 , wherein a risk priority number (RPN) value of the reference sequence is 1.

7. The risk managing device of claim 5 , wherein the instruction of calculating the grey correlation degree of each safety device according to the grey relational coefficient of each failure factor of each safety device comprises:

calculating a grey correlation degree of each failure factor of each safety device according to the grey relational coefficient of each failure factor of each safety device; and

calculating a mean value of the plurality of failure factors of each safety device to obtain the grey correlation degree of each safety device.

8. The risk managing device of claim 1 , wherein the one or more programs further comprise instructions for:

generating a risk guide map according to the risk sorting list of the area; and

displaying the safety devices that have higher priorities through different colors.

9. A risk managing method comprising:

obtaining live inspection information of a plurality of safety devices of an area, wherein each safety device comprises a plurality of failure factors;

setting a severity, occurrence, and detection (SOD) score for each failure factor of each safety device, wherein the SOD score comprises a severity (Sev) score, an occurrence (Occ) score, and a detection (Det) score;

updating the SOD score of each failure factor of each safety device according to the live inspection information of each safety device;

calculating a difference value between the updated SOD score and an SOD score of a reference sequence;

calculating a grey correlation degree of each safety device according to the difference value; and

outputting a risk sorting list of the plurality of safety devices of the area according to the grey correlation degree of each safety device.

10. The risk managing method of claim 9 , wherein the step of setting the SOD score for each failure factor of each safety device comprises:

setting the Sev score, the Occ score, and the Det score for each failure factor of each safety device according to a failure mode and effect analysis (FMEA) scoring rule.

11. The risk managing method of claim 10 , wherein the Sev score and the Det score are scored according to a predetermined scoring rule, the Occ score is set as an initial score according to the FMEA scoring rule.

12. The risk managing method of claim 11 , wherein the step of updating the SOD score of each failure factor of each safety device according to the live inspection information of each safety device comprises:

updating the initial score of the Occ score of each failure factor of each safety device according to the live inspection information of each safety device.

13. The risk managing method of claim 9 , wherein the step of calculating the grey correlation degree of each safety device according to the difference value comprises:

calculating a grey relational coefficient of each failure factor of each safety device according to the difference value; and

calculating the grey correlation degree of each safety device according to the grey relational coefficient of each failure factor of each safety device.

14. The risk managing method of claim 13 , wherein a risk priority number (RPN) value of the reference sequence is 1.

15. The risk managing method of claim 13 , wherein the step of calculating the grey correlation degree of each safety device according to the grey relational coefficient of each failure factor of each safety device comprises:

calculating a grey correlation degree of each failure factor of each safety device according to the grey relational coefficient of each failure factor of each safety device; and

calculating a mean value of the plurality of failure factors of each safety device to obtain the grey correlation degree of each safety device.

16. The risk managing method of claim 9 , further comprising:

generating a risk guide map according to the risk sorting list of the area; and

displaying the safety devices that have higher priorities through different colors.

Assignments (2)
CHANGE OF NAME Recorded Mar 10, 2022
From: HONGFUJIN PRECISION ELECTRONICS(TIANJIN)CO.,LTD.
To: FULIAN PRECISION ELECTRONICS (TIANJIN) CO., LTD.
Reel/Frame 059620/0142 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2017
From: WANG, SHIH-CHENG
To: HONGFUJIN PRECISION ELECTRONICS (TIANJIN) CO.,LTD.
Reel/Frame 044441/0528 →
Priority Claims (1)
CN 2017 1 1160799 · Nov 20, 2017 · national
Continuity (1)
Related Publication 20190155869A1 · May 23, 2019