IP Library Granted Patent US 10,320,195
Granted Patent B2
US 10,320,195 · App. 15/847,355 · Granted Jun 11, 2019

Distributing power between data centers

Inventor: Izuru Narita (Kamakura, JP)
Assignee: International Business Machines Corporation
H02J3/382G06F1/3212G06F9/5094H02J3/386H02J7/0052H02J7/35H02J9/061H02J2003/003Y02B10/72Y02B70/126Y02D10/174Y10T307/625
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,320,195
App. No.
15/847,355
Granted
Jun 11, 2019
Kind
B2
Abstract

A data center operable using only electric power based on renewable energy. The data center includes at least one device driven by the electric power, a storage battery for storing the electric power, and a controller for switching the operating mode of the device over the course of time on the basis of predicted values for the amount of electric power generated using renewable energy, the amount of electric power stored in the storage battery, and the amount of electric power consumed by the device.

Claims (14)

1. A method for distributing a load between data centers, each data center operable using electric power generated by renewable energy, and including one or more devices driven by the electric power and at least one storage battery for storing the electric power, wherein one or more of the one or more devices driven by the electric power are servers, and wherein at least one of the one or more servers is a server for executing the method, the method comprising steps of:

receiving a predicted value for an amount of the electric power stored in the storage battery at the each data center; and

assigning servers from the one or more servers to execute jobs in response to the predicted value for the amount of the stored electric power.

2. The method according to claim 1 , wherein the step of assigning servers further comprises a step of assigning servers to execute jobs in descending order beginning with servers in a data center that has a highest predicted value for the amount of the stored electric power.

3. The method according to claim 1 , wherein the step of assigning servers further comprises a step of assigning a job to at least one server in a data center that has a predicted value for the amount of the stored electric power exceeding a predetermined threshold value.

4. The method according to claim 1 , wherein the step of assigning servers further comprises a step of switching an operating mode of a device from the one or more devices to power saving mode when the predicted value for the amount of the stored electric power is lower than the predetermined threshold value.

5. The method according to claim 1 , wherein a predicted value B(T) for the amount of the electric power stored in the storage battery at time T is determined based on a formula:

B ( T )= B (0)+∫( g ( t )− c ( t )) dt

where g(t) is an amount of the electric power generated by the renewable energy, and c(t) is an amount of electric power consumed by the one or more devices driven by the electric power.

6. The method according to claim 5 , wherein the step of assigning servers further comprises a step of assigning a job from a server in a first data center from the data centers, the first data center having at time T 1 a predicted value B(T) for the amount of the electric power stored in the storage battery that is lower than a predetermined threshold value Bth, to a server in a second data center from the data centers.

7. The method according to claim 5 , wherein a predicted value for the amount of the electric power generated by the renewable energy is determined based on weather forecast data at time t when the amount of the electric power generated using the renewable energy g(t) changes in response to weather conditions in a region including a location of power generation.

8. The method according to claim 1 , wherein the renewable energy is supplied by wind power.

9. The method according to claim 1 , wherein the renewable energy is supplied by solar power.

10. The method according to claim 9 , wherein the step of assigning servers further comprises a step of selecting a data center from the data centers for a job assignment on the basis of a regional time difference between the data centers.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 19, 2017
From: NARITA, IZURU
To: INTERNATIONAL BUSINESS MACHINES CORPORATION
Reel/Frame 044440/0004 →
Priority Claims (1)
JP 2014-064898 · Mar 26, 2014 · national
Continuity (2)
Continuation 14619394 · Feb 11, 2015
Related Publication 20180109135A1 · Apr 19, 2018