IP Library Granted Patent US 10,574,053
Granted Patent B2
US 10,574,053 · App. 15/861,148 · Granted Feb 25, 2020

Power management transfer system and method

Inventors: Brandon M. Batzler (Hartford, WI); Sie Teong Lim (Brookfield, WI); Todd Plichta (Germantown, WI); Nicholas Demos (Wauwatosa, WI); Brian Northway (Hartford, WI); Michael Miller (Lake Mills, WI)
Assignee: Briggs & Stratton Corporation
H02J3/14Y02B70/3225Y04S20/222
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,574,053
App. No.
15/861,148
Granted
Feb 25, 2020
Kind
B2
Abstract

A method and system for supplying electric power to a plurality of priority loads from either a utility power source or a secondary power source, such as a generator. A control unit monitors the power draw by each of a plurality of priority loads and base loads during the supply of electric power from the utility power source. When the supply of power from the utility power source is interrupted, the control unit determines the number of the priority loads that can be powered by the secondary power source based on the monitored power draw of the priority and base loads prior to power interruption. The secondary power source is activated and the determined number of priority loads is immediately connected to the secondary power source without delay. When the utility power source returns, the system and method transfers utility power back to all of the priority and base loads.

Claims (46)

1. A method of managing the supply of electric power from a utility power source or a secondary power source to a plurality of priority loads that are each connected to a switching device and a plurality of base loads, the method comprising the steps of:

monitoring the power draw from each of the priority loads in a control unit during the supply of electric power from the utility power source;

monitoring for the presence of the supply of electric power from the utility power source; upon detecting a loss of the utility power source, selectively opening one or more of the switching devices;

determining in the control unit the number of priority loads that can be powered by the secondary power source;

activating the secondary power source and closing the switching devices to the determined number of priority loads to supply electric power to the determined number of priority loads upon activation of the secondary power source.

2. The method of claim 1 further comprising the steps of:

monitoring the power draw of each of the base loads in the control unit during the supply of electric power from the utility power source; and

determining the number of priority loads that can be powered by the secondary power source based in part on the combined power draw of the monitored base loads.

3. The method of claim 1 wherein the determined number of priority loads that can be powered by the secondary power source is based on the monitored power draw of the priority loads at a time before the loss of the utility power source.

4. The method of claim 1 wherein the secondary power source is a generator.

5. The method of claim 1 wherein the control unit is contained in a transfer switch panel having a transfer switch connected to both the utility power source and the secondary power source.

6. The method of claim 5 further comprising the step of moving the transfer switch to connect the secondary power source to the base loads and the priority loads prior to activating the secondary power source.

7. The method of claim 1 further comprising the step of assigning a priority value to each of the priority loads in the control unit, wherein the control unit determines the number of priority loads that can be powered by the secondary power source based on the monitored power draw of each of the priority loads and the priority value assigned to each of the priority loads.

8. The method of claim 1 further comprising the steps of:

monitoring for the return of the supply of electric power from the utility power source;

upon detecting the return of electric power from the utility power source, opening each of the switching devices;

terminating the operation of the secondary power sources; and

supplying the utility power source to the base loads and selectively closing each of the switching devices to supply the utility power source to the priority loads.

9. A system for managing the supply of power to a plurality of base loads and a plurality of priority loads from either a utility power source or a secondary power source, comprising:

a transfer switch coupled to the utility power source and the secondary power source;

a switching device connected to each of the plurality of priority loads, each of the

switching devices being movable between an open and a closed position to control the supply of electric power to the priority load;

a control unit operable to control the position of the transfer switch and the state of each of the switching devices, wherein the control unit is configured to:

monitor the power draw from each of the priority loads during the supply of electric power from the utility power source;

monitor for the presence of the supply of electric power from the utility power source; upon detecting a loss of the utility power source, open each of the switching devices; determine the number of priority loads that can be powered by the secondary power source; and

activate the secondary power source and selectively close the switching devices to the determined number of priority loads to supply electric power to the determined number of priority loads upon activation of the secondary power source.

10. The system of claim 9 wherein the control unit is further configured to: monitor the power draw of each of the base loads in the control unit during the supply of electric power from the utility power source; and

determine the number of priority loads that can be powered by the secondary power source based in part on the combined power draw of the monitored base loads.

11. The system of claim 9 wherein the determined number of priority loads that can be powered by the secondary power source is based on the monitored power draw of the priority loads at a time before the loss of the utility power source.

12. The system of claim 9 wherein the secondary power source is a generator.

13. The system of claim 9 wherein the control unit is contained in a transfer switch panel including the transfer switch.

14. The system of claim 9 wherein a priority value is assigned to each of the priority loads in the control unit, wherein the control unit is configured to determine the number of priority loads that can be powered by the secondary power source based on the monitored power draw of each of the priority loads and the priority value assigned to each of the priority loads.

15. A method of managing the supply of electric power from a utility power source or a secondary power source to a plurality of priority loads that are each connected to a switching device and a plurality of base loads, the method comprising the steps of:

monitoring the power draw from each of the priority loads and each of the base loads in a control unit during the supply of electric power from the utility power source;

upon detecting a loss of the utility power source, selectively opening the switching devices;

determining in the control unit the number of priority loads that can be powered by the secondary power source in addition to the base loads;

activating the secondary power source and closing the switching devices to the determined number of priority loads to supply electric power to the determined number of priority loads and the base loads upon activation of the secondary power source.

16. The method of claim 15 wherein the determined number of priority loads that can be powered by the secondary power source is based on the monitored power draw of the priority loads and the base loads at a time before the loss of the utility power source.

17. The method of claim 15 wherein the control unit is contained in a transfer switch panel having a transfer switch connected to both the utility power source and the secondary power source.

18. The method of claim 17 further comprising the step of moving the transfer switch to connect the secondary power source to the base loads and the priority loads prior to activating the secondary power source.

19. The method of claim 15 further comprising the step of assigning a priority value to each of the priority loads in the control unit, wherein the control unit determines the number of priority loads that can be powered by the secondary power source based on the monitored power draw of each of the priority loads and the priority value assigned to each of the priority loads.

20. The method of claim 15 further comprising the steps of:

monitoring for the return of the supply of electric power from the utility power source;

upon detecting the return of electric power from the utility power source, opening each of the switching devices;

terminating the operation of the secondary power sources; and

supplying the utility power source to the base loads and closing each of the switching devices to supply the utility power source to the priority loads.

Assignments (9)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2021
From: BRIGGS & STRATTON CORPORATION
To: BRIGGS & STRATTON, LLC
Reel/Frame 057042/0247 →
RELEASE OF SECURITY INTEREST Recorded Sep 22, 2020
From: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
To: BRIGGS & STRATTON CORPORATION
Reel/Frame 053885/0211 →
SECURITY INTEREST Recorded Sep 22, 2020
From: BRIGGS & STRATTON, LLC
To: KPS CAPITAL FINANCE MANAGEMENT, LLC
Reel/Frame 053850/0192 →
SECURITY INTEREST Recorded Sep 21, 2020
From: BRIGGS & STRATTON, LLC
To: WELLS FARGO BANK, NATIONAL ASSOCIATION, AS COLLATERAL AGENT
Reel/Frame 053838/0046 →
RELEASE OF SECURITY INTEREST Recorded Aug 21, 2020
From: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
To: BRIGGS & STRATTON CORPORATION
Reel/Frame 054617/0331 →
SECURITY INTEREST Recorded Jul 22, 2020
From: BRIGGS & STRATTON CORPORATION
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 053287/0487 →
SECURITY INTEREST Recorded Sep 27, 2019
From: BRIGGS & STRATTON CORPORATION
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 050564/0916 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 8, 2018
From: NORTHWAY, BRIAN; MILLER, MICHAEL
To: BRIGGS & STRATTON CORPORATION
Reel/Frame 044873/0373 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 8, 2018
From: BATZLER, BRANDON M.; LIM, SIE TEONG; PLICHTA, TODD; DEMOS, NICHOLAS
To: BRIGGS & STRATTON CORPORATION
Reel/Frame 044872/0723 →
Continuity (3)
Continuation 14953791 · Nov 30, 2015
Provisional Application 62085741 · Dec 1, 2014
Related Publication 20180131187A1 · May 10, 2018