IP Library Granted Patent US 10,876,497
Granted Patent B2
US 10,876,497 · App. 15/865,625 · Granted Dec 29, 2020

Method for fast thermalization and thermal management operation optimization

Inventors: Erik A. Munevar (Indianapolis, IN); Eric S. Donovan (Fishers, IN); Ken S. Rubel (Indianapolis, IN)
Assignee: ROLLS-ROYCE NORTH AMERICAN TECHNOLOGIES INC.
F02G5/02F01N5/02F02B29/0412F02B29/0443F02C6/18F41H13/0068F05D2220/76F05D2260/213F05D2260/4031F41H13/0043
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,876,497
App. No.
15/865,625
Granted
Dec 29, 2020
Kind
B2
Abstract

Systems and methods are provided for decreasing thermalization time and/or increasing coefficients of performance by adding waste heat. A thermal management system may include a coolant loop and be configured to cool a target component via the coolant loop, the thermal management system may be further configured to heat the target component during a thermalization period with a waste heat source via the same coolant loop with which the thermal management system is configured to cool the target component.

Claims (24)

1. A thermal management system comprising:

a coolant loop, the thermal management system configured to cool a gearbox via the coolant loop, the gearbox configured to transfer power from a gas turbine engine to an electric generator, the thermal management system further configured to heat oil in the gearbox during a thermalization period with a waste heat source via the coolant loop with which the thermal management system is configured to cool the gearbox; and

a pump configured to pump a coolant in the coolant loop faster during at least a portion of the thermalization period than outside of the thermalization period.

2. The thermal management system of claim 1 further comprising a switch configured to switch off flow of the coolant to a component of the thermal management system when the coolant is pumped faster during the at least a portion of the thermalization period than outside of the thermalization period.

3. The thermal management system of claim 1 , wherein the thermal management system is further configured to cool a directed-energy weapon via the coolant loop.

4. The thermal management system of claim 1 , wherein the waste heat source includes a heat exchanger in an exhaust path of an engine.

5. The thermal management system of claim 1 , wherein the waste heat source includes power electronics.

6. The thermal management system of claim 1 , wherein the thermal management system is configured to increase a coefficient of performance of the thermal management system by addition of heat to a coolant in the cooling loop from the waste heat source in response to thermal load on the thermal management system being below a threshold level.

7. A method of decreasing thermalization time, the method comprising:

heating a target component by pumping a coolant through a coolant loop during a thermalization period, the coolant comprising thermal energy obtained from a waste heat source;

cooling the target component with the coolant in the coolant loop after the thermalization period;

adding, outside of the thermalization period, waste heat from the waste heat source to the coolant after the coolant passes through the target component but before the coolant is cooled by a cooling system; and

pumping the coolant through the coolant loop faster when heating the target component than when cooling the target component.

8. The method of claim 7 further comprising switching off a flow of the coolant to a component of a thermal management system when pumping the coolant through the coolant loop faster.

9. The method of claim 7 , wherein the heating the target component includes heating oil that flows through a gearbox, wherein the gearbox is configured to transfer power from a gas turbine engine to an electric generator, and wherein the cooling the target component includes cooling the oil that flows through the gearbox.

10. The method of claim 7 , wherein at a start of the thermalization period, a temperature of the target component is below an operating temperature of the target component.

11. An integrated power and thermal management system, the integrated power and thermal management system comprising:

an electric generator configured to generate electricity for a directed-energy weapon;

an engine configured to power the electric generator;

a thermal management system comprising a coolant loop, a cooling system, and a heat exchanger, wherein the heat exchanger is arranged on the coolant loop between the directed-energy weapon and the cooling system, and wherein the heat exchanger is configured to add waste heat to coolant in the coolant loop as the coolant passes from the directed-energy weapon to the cooling system, the thermal management system configured to cool a target component via the coolant loop, the thermal management system further configured to heat the target component with a waste heat source via the coolant loop, wherein the target component includes the directed-energy weapon; and

a bypass valve, the bypass valve configured to selectively direct the coolant in the coolant loop received from the directed-energy weapon to either the heat exchanger or a branch that bypasses the heat exchanger based on a determination that a thermal load on the thermal management system is above or below a threshold value.

12. The integrated power and thermal management system of claim 11 , wherein the electric generator is configured to generate electricity for a component of the thermal management system.

13. The integrated power and thermal management system of claim 11 , wherein the directed-energy weapon includes a pulsed-powered device.

14. The integrated power and thermal management system of claim 11 further comprising a gearbox between the engine and the electric generator, wherein the target component includes the gearbox.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 9, 2018
From: MUNEVAR, ERIK A.; DONOVAN, ERIC S.; RUBEL, KEN S.
To: ROLLS-ROYCE NORTH AMERICAN TECHNOLOGIES INC.
Reel/Frame 044573/0972 →
Continuity (2)
Provisional Application 62547522 · Aug 18, 2017
Related Publication 20190055899A1 · Feb 21, 2019
Cited By (6)
US 12,247,519 US 12,313,002 US 12,358,638 US 12,404,033 US 12,434,851 US 12,618,366