IP Library Granted Patent US 10,651,648
Granted Patent B2
US 10,651,648 · App. 15/869,029 · Granted May 12, 2020

System for powering auxiliary loads of an energy storage system

Inventors: Ralph Teichmann (Niskayuna, NY); Honggang Wang (Clifton Park, NY)
Assignee: General Electric Company
H02J1/10H02J9/066
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,651,648
App. No.
15/869,029
Granted
May 12, 2020
Kind
B2
Abstract

An energy storage system is presented. The energy storage system includes a primary energy storage device operatively couplable to a main bus, where the main bus is operatively coupled to a power generation device. Further, the energy storage system includes an auxiliary bus operatively couplable to the main bus and a grid bus. Furthermore, the energy storage system includes a plurality of auxiliary loads operatively coupled to the auxiliary bus and a housing configured to encompass the primary energy storage device, the auxiliary bus, and the plurality of auxiliary loads, where the auxiliary bus is configured to supply power to the plurality of auxiliary loads from the primary energy storage device, the power generation device, a grid, or combinations thereof.

Claims (36)

1. An energy storage system, comprising:

a primary energy storage device operably couplable to a main bus;

the main bus is operatively coupled to a power generation device;

an auxiliary bus operatively couplable to the main bus and a grid bus;

a plurality of auxiliary loads operatively coupled to the auxiliary bus;

a housing, at least the primary energy storage device and one or more of the plurality of auxiliary loads located within the housing;

the auxiliary loads configured to provide thermal support to the primary energy storage device to maintain an operating condition of the energy storage system; and

the auxiliary bus is configured to supply power to the plurality of auxiliary loads from the primary energy storage device, the power generation device, a grid, or combinations thereof.

2. The energy storage system of claim 1 , further comprising a first converter configured to operatively couple one end of the auxiliary bus to the power generation device via the main bus.

3. The energy storage system of claim 1 , further comprising a rectifier configured to operatively couple another end of the auxiliary bus to the grid via the grid bus.

4. The energy storage system of claim 1 , further comprising a second converter configured to operatively couple the primary energy storage device to the main bus.

5. The energy storage system of claim 1 , wherein a voltage of the main bus is higher than a voltage of the auxiliary bus.

6. The energy storage system of claim 1 , wherein the plurality of auxiliary loads comprises a cooling blower, a ventilation blower, a battery thermal management device, a battery electrical control device, a control and instrumentation device, or combinations thereof.

7. The energy storage system of claim 1 , wherein the plurality of auxiliary loads is operatively coupled to the auxiliary bus via corresponding auxiliary power conversion units.

8. The energy storage system of claim 1 , further comprising a back-up energy storage device, wherein the back-up energy storage device is operatively coupled to the auxiliary bus.

9. The energy storage system of claim 1 , further comprising a bidirectional converter, wherein the bidirectional converter is operatively coupled to the power generation device via the main bus.

10. A power generation system, comprising:

a power generation device;

a bidirectional converter;

a main bus configured to couple the power generation device to the bidirectional converter;

a primary energy storage device operatively coupled to the main bus, the primary energy storage device located within a housing;

an auxiliary bus operatively coupled to the main bus and a grid bus;

a plurality of auxiliary loads configured to provide thermal support to the primary energy storage device to maintain an operating condition of the energy storage system;

the plurality of auxiliary loads operatively coupled to the auxiliary bus; and

the auxiliary bus is configured to supply power to the plurality of auxiliary loads from the primary energy storage device, the power generation device, a grid, or combinations thereof.

11. The power generation system of claim 10 , wherein the power generation device comprises a solar based power generation device, a wind based power generation device, a fuel cell based power generation device, or combinations thereof.

12. The power generation system of claim 10 , further comprising a transformer, wherein the transformer is operatively coupled between the bidirectional converter and the grid.

13. The power generation system of claim 10 , further comprising a back-up energy storage device, wherein the back-up energy storage device is operatively coupled to the auxiliary bus and configured to provide power to the plurality of auxiliary loads when insufficient power is available from the primary energy storage device, the power generation device, and the grid.

14. The power generation system of claim 13 , wherein the primary energy storage device, the power generation device, the grid, the back-up energy storage device, or combinations thereof are configured to facilitate an uninterrupted supply of power to the plurality of auxiliary loads.

15. A method of providing power to a plurality of auxiliary loads of an energy storage system from a power generation device, a primary energy storage device, a grid, or combinations thereof, the method comprising:

providing a first power to at least one of a rectifier and a first converter from at least one of the power generation device, the primary energy storage device, and the grid;

converting, using at least one of the first converter and the rectifier, the first power to a second power;

providing the second power to an auxiliary bus; and

converting, using one or more auxiliary power conversion units, the second power on the auxiliary bus for use by the plurality of auxiliary loads of the energy storage system; and

the auxiliary loads providing thermal support to the primary energy storage device to maintain an operating condition of the energy storage system.

16. The method of claim 15 , further comprising providing a third power from a back-up energy storage device to the auxiliary bus via an additional converter coupled directly between the back-up energy storage device and the auxiliary bus.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 14, 2023
From: GENERAL ELECTRIC COMPANY
To: GE GRID SOLUTIONS LLC
Reel/Frame 066000/0694 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 12, 2018
From: TEICHMANN, RALPH; WANG, HONGGANG
To: GENERAL ELECTRIC COMPANY
Reel/Frame 044604/0655 →
Continuity (1)
Related Publication 20190214817A1 · Jul 11, 2019