IP Library Granted Patent US 11,060,746
Granted Patent B2
US 11,060,746 · App. 15/874,630 · Granted Jul 13, 2021

Systems and methods for detecting and responding to refrigerant leaks in heating, ventilating, and air conditioning systems

Inventors: Steven M. Maddox (Elmond, OK); William F. McQuade (New Cumberland, PA)
Assignee: Johnson Controls Technology Company
F24F11/36F24F1/0035F24F1/0041F24F1/022F24F7/007F24F11/70F24F11/72F24F11/89F24F2110/65
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,060,746
App. No.
15/874,630
Granted
Jul 13, 2021
Kind
B2
Abstract

The present disclosure relates to a heating, ventilating, and air conditioning (HVAC) system that includes a refrigerant circuit and a sensor configured to measure a refrigerant concentration external to the refrigeration circuit. The HVAC system also includes a controller that is communicatively coupled to the sensor and to an economizer. The controller is configured to control a flow of environmental air into the HVAC system. The controller is further configured to increase a ratio of the flow of environmental air relative to a flow of return air from a conditioned interior space of a building when the sensor measures the refrigerant concentration above a predetermined threshold concentration.

Claims (21)

1. A heating, ventilating, and air conditioning (HVAC) system comprising:

a first HVAC unit having a first economizer comprising a damper having at least one baffle, wherein the first economizer is configured to control a first flow of environmental air into the HVAC system;

a first sensor configured to measure a first leaked refrigerant concentration within the HVAC system;

a first controller communicatively coupled to the first sensor and the first economizer, wherein the first controller is configured to adjust the at least one baffle of the first economizer to increase a first ratio of the first flow of environmental air relative to a first flow of return air from a conditioned interior space of a building when the first sensor measures the first leaked refrigerant concentration above a predetermined threshold concentration;

a second HVAC unit, wherein the second HVAC unit comprises a second economizer configured to control a second flow of environmental air into the HVAC system;

a second sensor configured to measure a second leaked refrigerant concentration near the second HVAC unit; and

a second controller communicatively coupled to the second sensor and the second economizer, wherein the second controller is configured to increase a second ratio of the second flow of environmental air relative to a second flow of return air from the conditioned interior space of the building when the second sensor measures the second leaked refrigerant concentration above the predetermined threshold concentration.

2. The HVAC system of claim 1 , wherein the first controller of the first HVAC unit and the second controller of the second HVAC unit are communicatively coupled, wherein the first controller is configured to increase the second ratio of the second flow of environmental air relative to the second flow of return air when the first sensor measures the first leaked refrigerant concentration above the predetermined threshold concentration.

3. The HVAC system of claim 1 , wherein the first sensor is disposed upstream of supply ductwork of the HVAC system and is configured to measure the first leaked refrigerant concentration in conditioned air before the conditioned air enters the supply ductwork of the HVAC system.

4. The HVAC system of claim 1 , wherein the HVAC system comprises an alarm and the first controller is configured to activate the alarm when the first sensor measures the first leaked refrigerant concentration above the predetermined threshold concentration.

5. The HVAC system of claim 1 , wherein the first controller is configured to send a notification to an electronic device when the first sensor measures the first leaked refrigerant concentration above the predetermined threshold concentration.

6. A heating, ventilating, and air conditioning (HVAC) system comprising:

a first HVAC unit, wherein the first HVAC unit comprises:

an economizer comprising a damper having at least one baffle, wherein the economizer is configured to control a flow of environmental air into the HVAC system;

a first sensor configured to measure a first leaked refrigerant concentration within the HVAC system;

a first controller communicatively coupled to the first sensor and the economizer, wherein the first controller is configured to adjust the at least one baffle of the economizer to increase a ratio of the flow of environmental air relative to a flow of return air from a conditioned interior space of a building when the first sensor measures the first leaked refrigerant concentration above a predetermined threshold concentration; and

a second HVAC unit, wherein the second HVAC unit comprises:

a second sensor configured to measure a second leaked refrigerant concentration near the second HVAC unit;

a second controller communicatively coupled to the second sensor and the first controller, wherein the first controller is configured to increase the ratio of the flow of environmental air relative to the flow of return air when the second sensor measures the second leaked refrigerant concentration above the predetermined threshold concentration.

7. The HVAC system of claim 6 , wherein the second HVAC unit does not include a respective economizer.

8. The HVAC system of claim 6 , wherein the second sensor is disposed within ductwork of the conditioned interior space.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 30, 2025
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 072298/0096 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 24, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067832/0947 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2018
From: MADDOX, STEVEN M; MCQUADE, WILLIAM F.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 044716/0566 →
Continuity (2)
Provisional Application 62593585 · Dec 1, 2017
Related Publication 20190170385A1 · Jun 6, 2019
Cited By (2)
US 12,410,926 US 12,578,124