IP Library Granted Patent US 10,459,733
Granted Patent B2
US 10,459,733 · App. 15/880,058 · Granted Oct 29, 2019

Power budgeting in an information handling system

Inventors: John E. Jenne (Austin, TX); Kyle E. Cross (Austin, TX)
Assignee: Dell Products, LP
G06F9/4401G06F1/3206G06F9/4406
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,459,733
App. No.
15/880,058
Filed
Jan 25, 2018
Granted
Oct 29, 2019
Kind
B2
Art Unit
2186
USPC
713/300
Abstract

A halt event separates a boot up operation from a run time operation. A controller grants a request from a baseboard management controller for an electrical power associated with a boot-up operation. As the baseboard management controller completes the boot-up operation (such as a power on self-test), the baseboard management controller predicts the electrical power that is required for a run time operation (e.g., executing an operating system). The baseboard management controller is then required or forced to submit a subsequent request for the additional electrical power that is required for the run time operation. The controller compares the electrical power predicted for the run time operation to a power availability from a power supply (such as a safe or maximum operating condition). If the power supply can provide the electrical power predicted to be required during the run time operation, then the controller may permit or authorize a transition from the boot up operation to the run time operation. However, if the power supply cannot provide the electrical power predicted to be required during the run time operation, then the controller denies the run time operation.

Claims (37)

1. A method, comprising:

granting a baseboard management controller to enter a boot up procedure that executes a power on self-test;

receiving a request from the baseboard management controller for a run time operation at which an operating system is executed;

predicting a run time value of an electrical power needed by the baseboard management controller for the run time operation;

denying the request from the baseboard management controller for the run time operation in response to the run time value of the electrical power being greater than an available electrical power that is available from a power supply unit; and

executing a halt event that prevents the baseboard management controller from transitioning from the boot up procedure to the run time operation at which the operating system is executed.

2. The method of claim 1 , further comprising comparing a threshold value to the run time value of the electrical power needed by the baseboard management controller for the run time operation.

3. The method of claim 1 , further comprising maintaining the baseboard management controller at a boot value associated with the boot up procedure.

4. The method of claim 1 , further comprising granting the baseboard management controller to consume the electrical power needed for the boot up procedure.

5. The method of claim 1 , further comprising sending a denial via an interface to the baseboard management controller, the denial denying the request from the baseboard management controller for the run time operation.

6. The method of claim 1 , further comprising maintaining the baseboard management controller at a power consumption associated with the boot up procedure.

7. The method of claim 1 , further comprising determining the run time value of the electrical power needed by the baseboard management controller based on at least one of a number of central processing units and the number of dual inline memory modules.

8. A server ecosystem, comprising:

a hardware processor; and

a memory device accessible to the hardware processor, the memory device storing instructions that when executed cause the hardware processor to perform operations including:

granting a request from a baseboard management controller for an electrical power associated with a boot-up operation that executes a power on self-test;

receiving a subsequent request from the baseboard management controller for a run time operation at which an operating system is executed;

predicting a run time value of the electrical power needed by the baseboard management controller for the run time operation;

determining the run time value of the electrical power needed by the baseboard management controller for the run time operation exceeds an available electrical power that is available from a power supply unit; and

sending a denial that causes the baseboard management controller to execute a halt event, the halt event preventing the baseboard management controller from transitioning from the boot up procedure to the run time operation at which the operating system is executed.

9. The server ecosystem of claim 8 , wherein the operations further include comparing a threshold value to the run time value of the electrical power needed by the baseboard management controller for the run time operation.

10. The server ecosystem of claim 8 , wherein the operations further include approving a boot value of the electrical power associated with the boot up procedure.

11. The server ecosystem of claim 8 , wherein the operations further maintaining the baseboard management controller at the boot value associated with the boot up procedure.

12. The server ecosystem of claim 8 , wherein the operations further include sending the denial via an interface to the baseboard management controller.

13. The server ecosystem of claim 8 , wherein the operations further include determining the run time value of the electrical power needed by the baseboard management controller based on a number of central processing units.

14. The server ecosystem of claim 8 , wherein the operations further include determining the run time value of the electrical power needed by the baseboard management controller based on a number of dual inline memory modules.

15. A memory device storing instructions that when executed cause a hardware processor to perform operations, the operations comprising:

granting a request from a baseboard management controller for an electrical power associated with a boot-up operation that executes a power on self-test;

receiving a subsequent request from the baseboard management controller for a run time operation at which an operating system is executed;

predicting a run time value of the electrical power needed by the baseboard management controller for the run time operation;

determining the run time value of the electrical power needed by the baseboard management controller for the run time operation exceeds an available electrical power that is available from a power supply unit; and

sending a denial that causes the baseboard management controller to execute a halt event, the halt event preventing the baseboard management controller from transitioning from the boot up procedure to the run time operation at which the operating system is executed.

16. The memory device of claim 15 , wherein the operations further include comparing a threshold value to the run time value of the electrical power needed by the baseboard management controller for the run time operation.

17. The memory device of claim 15 , wherein the operations further include approving a boot value of the electrical power associated with the boot up procedure.

18. The memory device of claim 15 , wherein the operations further include maintaining the baseboard management controller at the boot value associated with the boot up procedure.

19. The memory device of claim 15 , wherein the operations further include sending the denial via an interface to the baseboard management controller.

20. The memory device of claim 15 , wherein the operations further include determining the run time value of the electrical power needed by the baseboard management controller based on at least one of a number of central processing units and the number of dual inline memory modules.

Assignments (8)
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (053546/0001) Recorded Jun 23, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL MARKETING L.P. (ON BEHALF OF ITSELF AND AS SUCCESSOR-IN-INTEREST TO CREDANT TECHNOLOGIES, INC.); DELL INTERNATIONAL L.L.C.; DELL PRODUCTS L.P.; DELL USA L.P.; EMC CORPORATION; DELL MARKETING CORPORATION (SUCCESSOR-IN-INTEREST TO FORCE10 NETWORKS, INC. AND WYSE TECHNOLOGY L.L.C.); EMC IP HOLDING COMPANY LLC
Reel/Frame 071642/0001 →
RELEASE OF SECURITY INTEREST IN PATENTS PREVIOUSLY RECORDED AT REEL/FRAME (045482/0131) Recorded May 20, 2022
From: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS NOTES COLLATERAL AGENT
To: DELL PRODUCTS L.P.; EMC CORPORATION; EMC IP HOLDING COMPANY LLC; DELL MARKETING CORPORATION (SUCCESSOR-IN-INTEREST TO WYSE TECHNOLOGY L.L.C.)
Reel/Frame 061749/0924 →
RELEASE OF SECURITY INTEREST AT REEL 045482 FRAME 0395 Recorded Nov 2, 2021
From: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH
To: DELL PRODUCTS L.P.; EMC CORPORATION; EMC IP HOLDING COMPANY LLC; WYSE TECHNOLOGY L.L.C.
Reel/Frame 058298/0314 →
SECURITY AGREEMENT Recorded Apr 22, 2020
From: CREDANT TECHNOLOGIES INC.; DELL INTERNATIONAL L.L.C.; DELL MARKETING L.P.; DELL PRODUCTS L.P.; DELL USA L.P.; EMC CORPORATION; FORCE10 NETWORKS, INC.; WYSE TECHNOLOGY L.L.C.; EMC IP HOLDING COMPANY LLC
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A.
Reel/Frame 053546/0001 →
SECURITY AGREEMENT Recorded Mar 21, 2019
From: CREDANT TECHNOLOGIES, INC.; DELL INTERNATIONAL L.L.C.; DELL MARKETING L.P.; DELL PRODUCTS L.P.; DELL USA L.P.; EMC CORPORATION; FORCE10 NETWORKS, INC.; WYSE TECHNOLOGY L.L.C.; EMC IP HOLDING COMPANY LLC
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A.
Reel/Frame 049452/0223 →
PATENT SECURITY AGREEMENT (CREDIT) Recorded Mar 1, 2018
From: DELL PRODUCTS L.P.; EMC CORPORATION; EMC IP HOLDING COMPANY LLC; WYSE TECHNOLOGY L.L.C.
To: CREDIT SUISSE AG, CAYMAN ISLANDS BRANCH, AS COLLATERAL AGENT
Reel/Frame 045482/0395 →
PATENT SECURITY AGREEMENT (NOTES) Recorded Mar 1, 2018
From: DELL PRODUCTS L.P.; EMC CORPORATION; EMC IP HOLDING COMPANY LLC; WYSE TECHNOLOGY L.L.C.
To: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT
Reel/Frame 045482/0131 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 5, 2018
From: JENNE, JOHN E.; CROSS, KYLE E.
To: DELL PRODUCTS, LP
Reel/Frame 044834/0821 →
Continuity (1)
Related Publication 20190227616A1 · Jul 25, 2019