IP Library Patent Application 15888671
Patent Application
App. No. 15/888,671

PHOTOVOLTAIC INVERTER HAVING AN IMPROVED COMMUNICATION ARRANGEMENT WITH A REMOTE COMPUTERISED SYSTEM

Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US None
App. No.
15/888,671
Abstract

A photovoltaic inverter for a photovoltaic electric power generation plant, the photovoltaic inverter comprising a control unit for controlling the operation of the photovoltaic inverter and a main communication port for communication with a remote computerized system through a main communication channel. The photovoltaic inverter comprises an auxiliary communication port for communication with a remote computerized system through an auxiliary communication channel. The auxiliary communication port has a narrow band so that the control unit can transmit or receive only small-size data-sets through the auxiliary communication port.

Claims (25)

1 . A photovoltaic inverter for a photovoltaic electric power generation plant, said photovoltaic inverter comprising:

a control unit for controlling the operation of said photovoltaic inverter and a main communication port for communication with a remote computerised system through a main communication channel which comprises an auxiliary communication port for communication with a remote computerised system through an auxiliary communication channel, said auxiliary communication port having a narrow band so that said control unit can transmit or receive only small-size data-sets through said auxiliary communication port.

2 . The photovoltaic inverter, according to claim 1 , wherein said control unit is configured to transmit small-size data-sets including information related the operation status of said inverter or of said plant through said auxiliary communication port.

3 . The photovoltaic inverter, according to claim 1 , wherein said control unit is configured to normally maintain deactivated said auxiliary communication port and to activate said auxiliary communication port for finite time intervals only.

4 . The photovoltaic inverter, according to claim 3 , wherein said control unit is configured to activate said auxiliary communication port on a periodic time-base to transmit one or more first data-sets, which include first predefined information related the operation status of said inverter or of said plant, through said auxiliary communication port.

5 . The photovoltaic inverter, according to claim 4 , wherein said control unit is configured to maintain said auxiliary communication port active for a predefined time interval (T W1 ) after the transmission of said one or more first data-sets.

6 . The photovoltaic inverter, according to claim 5 , wherein said control unit is configured to deactivate said auxiliary communication port if no instructions are received within said predefined time interval (T W1 ).

7 . The photovoltaic inverter, according to claim 5 , wherein said control unit is configured to carry out one or more requested tasks in response to instructions received within said predefined time interval (T W1 ).

8 . The photovoltaic inverter, according to claim 7 , wherein said requested tasks include the immediate or delayed transmission of one or more second data-sets, which include second information related the operation status of said inverter or of said plant, through said auxiliary communication port.

9 . The photovoltaic inverter, according to claim 7 , wherein said requested tasks include the activation of said auxiliary communication port at a requested time and for a further predefined time interval (T W2 ) to receive further instructions through said auxiliary communication port.

10 . The photovoltaic inverter, according to claim 7 , wherein said requested tasks include control tasks related to the management of the operation of said control unit and/or said inverter.

11 . The photovoltaic inverter, according to claim 1 , wherein said main communication port is a wide-band communication port.

12 . The photovoltaic inverter, according to claim 1 , wherein said auxiliary communication port is an ultra-narrow-band communication port.

13 . A computerised platform for monitoring the operation of one or more photovoltaic inverters ( 1 A , 1 N ), according to claim 1 , wherein it comprises:

a remote computerised system;

one or more control units comprised in said photovoltaic inverters to control the operation of said photovoltaic inverters;

for each photovoltaic inverter, a main communication port of said photovoltaic inverter and a main communication channel linking said main communication port and said remote computerised system;

for each photovoltaic inverter, a narrow-band auxiliary communication port of said photovoltaic inverter and a narrow-band auxiliary communication channel linking said auxiliary communication port and said remote computerised system.

14 . The photovoltaic inverter, according to claim 2 , wherein said control unit is configured to normally maintain deactivated said auxiliary communication port and to activate said auxiliary communication port for finite time intervals only.

15 . The photovoltaic inverter, according to claim 14 , wherein said control unit is configured to activate said auxiliary communication port on a periodic time-base to transmit one or more first data-sets, which include first predefined information related the operation status of said inverter or of said plant, through said auxiliary communication port.

16 . The photovoltaic inverter, according to claim 14 , wherein said control unit is configured to maintain said auxiliary communication port active for a predefined time interval (T W1 ) after the transmission of said one or more first data-sets (D 1 ).

17 . The photovoltaic inverter, according to claim 16 , wherein said control unit is configured to deactivate said auxiliary communication port if no instructions are received within said predefined time interval (T W1 ).

18 . The photovoltaic inverter, according to claim 16 , wherein said control unit is configured to carry out one or more requested tasks in response to instructions received within said predefined time interval (T W1 ).

19 . The photovoltaic inverter, according to claim 18 , wherein said requested tasks include the immediate or delayed transmission of one or more second data-sets (D 2 ), which include second information related the operation status of said inverter or of said plant, through said auxiliary communication port.

20 . The photovoltaic inverter, according to claim 8 , wherein said requested tasks include the activation of said auxiliary communication port at a requested time and for a further predefined time interval (T W2 ) to receive further instructions through said auxiliary communication port.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2020
From: ABB SCHWEIZ AG
To: MARICI HOLDINGS THE NETHERLANDS B.V.
Reel/Frame 054205/0806 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 18, 2019
From: TAZZARI, DAVIDE; VERNIA, FILIPPO
To: ABB SCHWEIZ AG
Reel/Frame 051034/0662 →