IP Library Granted Patent US 10,416,743
Granted Patent B2
US 10,416,743 · App. 15/891,562 · Granted Sep 17, 2019

Power supply system

Inventor: Toshiyuki Hayashi (Tokyo, JP)
Assignee: NEC CORPORATION
G06F1/266G06F1/189H02J9/061H05K7/1492
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,416,743
App. No.
15/891,562
Granted
Sep 17, 2019
Kind
B2
Abstract

A power supply system includes two first power paths for supplying electric power to a first device, and two second power paths for supplying electric power to a second device. One of the first power paths is configured to be able to supply power to the second device, and one of the second power paths is configured to be able to supply power to the first device.

Claims (23)

1. A power supply system comprising:

only two first power paths connected to a first device, the two first power path supplying electric power to the first device; and

only two second power paths connected to a second device, the two second power path supplying electric power to the second device, wherein

one of the first power paths is configured to be able to constantly supply electric power to the first device or the second device,

another one of the first power paths is configured to be able to constantly supply electric power to the first device,

one of the second power paths is configured to be able to constantly supply electric power to the second device or the first device, and

another one of the second power paths is configured to be able to constantly supply electric power to the second device.

2. The power supply system according to claim 1 , further comprising

a switch for switching a destination of power supply by the one of the first power paths to either the first device or the second device, and switching a destination of power supply by the one of the second power paths to either the second device or the first device.

3. The power supply system according to claim 2 , wherein

the switch switches a state between

a state in which the destination of the power supply by the one of the first power paths is set to the first device and the destination of the power supply by the one of the second power paths is set to the second device, and

a state in which the destination of the power supply by the one of the first power paths and the one of the second power paths is set to either the first device or the second device.

4. The power supply system according to claim 2 , further comprising

a control device that controls operation of the switch to switch the destination of the power supply by the one of the first power paths and the one of the second power path, based on power consumption of at least one of the first device and the second device.

5. The power supply system according to claim 4 , wherein

in a state in which the destination of the power supply by the one of the first power paths is the first device and the destination of the power supply by the one of the second power paths is the second device, when the power consumption of the first device or the second device exceeds electric energy available from the two first power paths or the two second power paths, the control device controls the operation of the switch to switch the destination of the power supply by the one of the first power paths and the one of the second power paths to either the first device or the second device.

6. The power supply system according to claim 4 , wherein

in a state in which the destination of the power supply by the one of the first power paths and the one of the second power paths is either the first device or the second device, when the power consumption of the first device or the second device becomes lower than electric energy available from the two first power paths or the two second power paths, the control device controls the operation of the switch to switch the destination of the power supply by the one of the first power paths to the first device and switch the destination of the power supply by the one of the second power paths to the second device.

7. The power supply system according to claim 4 , wherein

the control device sets an upper limit value of the power consumption of at least one of the first device and the second device such that total power consumption of the first device and the second device does not exceed electric energy available from the two first power paths and the two second power paths.

8. The power supply system according to claim 4 , wherein

the control device sets an upper limit value of the power consumption of the first device or the second device to a value of electric energy available from another one of the first power paths or another one of the second power paths.

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 27, 2024
From: IP WAVE PTE LTD.
To: CLOUD BYTE LLC.
Reel/Frame 067944/0332 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 27, 2024
From: NEC ASIA PACIFIC PTE LTD.
To: IP WAVE PTE LTD.
Reel/Frame 066376/0276 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 17, 2023
From: NEC CORPORATION
To: NEC ASIA PACIFIC PTE LTD.
Reel/Frame 063349/0459 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 8, 2018
From: HAYASHI, TOSHIYUKI
To: NEC CORPORATION
Reel/Frame 044866/0408 →
Priority Claims (1)
JP 2017-057265 · Mar 23, 2017 · national
Continuity (1)
Related Publication 20180275733A1 · Sep 27, 2018