IP Library Granted Patent US 10,262,518
Granted Patent B2
US 10,262,518 · App. 15/895,062 · Granted Apr 16, 2019

Method of disseminating monitoring information relating to contamination and corrosion within an infrastructure

Inventors: Gregory E. Hyland (Atlanta, GA); Robert Paul Keefe (Alpharetta, GA); Marietta Edmonds Zakas (Atlanta, GA); Clayton Robert Barker (Atlanta, GA)
Assignee: Mueller International LLC
G08B21/18G01N21/94G01N33/0075G08B25/009G08B25/08H04M11/04
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,262,518
App. No.
15/895,062
Granted
Apr 16, 2019
Kind
B2
Abstract

A method of disseminating information includes detecting, by a first monitoring device, a condition of an aspect of an infrastructure; transmitting data relating to the condition and a first time stamp; detecting, by a second monitoring device, the condition; transmitting data relating to the condition and a second time stamp; determining whether a difference in data indicates a problem of contamination; subsequent to an indication of the problem of contamination, determining an amount of the contamination, an approximate location of the contamination, a direction of contamination movement, and a speed of the contamination movement, based on the first time stamp and the second time stamp; determining whether a difference in data indicates corrosion within the infrastructure; and subsequent to the indication of corrosion, determining whether the data relating to the condition indicates an amount of corrosion determined to be the problem, and a level of severity of the corrosion.

Claims (27)

1. A method of disseminating information, the method comprising:

detecting, by a first monitoring device, a first condition of a first aspect of an infrastructure and transmitting a data signal to an operations center, the data signal including data relating to the first condition and a first time stamp;

detecting, by a second monitoring device, the first condition of the first aspect and a second condition of a second aspect of the infrastructure, and transmitting a data signal to the operations center, the data signal including data relating to the second condition and data relating to the first condition, and the data signal comprising a second time stamp;

determining, by the operations center, whether the data included in the data signal received from either of the monitoring devices indicates a problem of contamination within the infrastructure;

subsequent to an indication of the problem of contamination, determining, by the operations center, an amount of the contamination, an approximate location of the contamination, a direction of contamination movement, and a speed of the contamination movement, wherein the direction and the speed of the contamination movement are based on the first time stamp from the first monitoring device and the second time stamp from the second monitoring device;

determining, by the operations center, whether the data included within the data signal received from either of the monitoring devices indicates a problem of corrosion within the infrastructure; and

subsequent to an indication of the problem of corrosion, determining by the operations center an amount of corrosion determined to be the problem within the infrastructure and a level of severity of the corrosion;

wherein the first aspect and the second aspect define different aspects of the infrastructure.

2. The method of claim 1 , wherein each monitoring device comprises:

at least one sensor sensing at least one of the first and second conditions within the infrastructure,

a data storage device storing data sensed by the at least one sensor,

a first communications device adapted to transmit and receive data, and

a first processor communicatively coupled to the at least one sensor, the data storage device, and the first communications device.

3. The method of claim 1 , wherein the second monitoring device monitors the first condition.

4. The method of claim 3 , further comprising determining, by the operations center, whether a change in data between data as detected by the first monitoring device relating to the first condition from data as detected by the second monitoring device relating to the first condition indicates a second problem within the infrastructure.

5. A method of disseminating information, comprising:

detecting, by a first monitoring device, a condition of an aspect of an infrastructure;

transmitting, by the first monitoring device, a data signal including data relating to the condition and a first time stamp;

detecting, by a second monitoring device, the condition of the aspect of the infrastructure;

transmitting, by the second monitoring device, a data signal including data relating to the condition and a second time stamp;

determining whether the data from the first monitoring device differs from the data from the second monitoring device;

determining whether a difference in data indicates a problem of contamination within the infrastructure;

subsequent to an indication of the problem of contamination, determining an amount of the contamination, an approximate location of the contamination, a direction of contamination movement, and a speed of the contamination movement, wherein the direction and the speed of the contamination movement are based on the first time stamp from the first monitoring device and the second time stamp from the second monitoring device;

determining whether a difference in data indicates a problem of corrosion within the infrastructure; and

subsequent to an indication of the problem of corrosion, determining whether the data relating to the condition as detected by the first monitoring device and the second monitoring device indicates an amount of corrosion determined to be the problem within the infrastructure, and a level of severity of the corrosion.

6. The method of claim 5 , wherein the determination of a level of severity of the corrosion is performed by an operations center.

7. The method of claim 6 , further comprising determining whether the corrosion is severe enough to warrant fixing based on the level of the severity of the corrosion.

Continuity (5)
Continuation 14928725 · Oct 30, 2015
Continuation 12606957 · Oct 27, 2009
Provisional Application 61108770 · Oct 27, 2008
Provisional Application 61180600 · May 22, 2009
Related Publication 20180174424A1 · Jun 21, 2018
Cited By (2)
US 12,253,507 US 12,385,233