IP Library Granted Patent US 10,655,597
Granted Patent B2
US 10,655,597 · App. 15/914,349 · Granted May 19, 2020

Wind turbine rotor blade components and methods of making same

Inventors: Joel D. Gruhn (Barrington, RI); Ethan Franklin (Morganton, NC); Kameshwaran Narasimhan (Hickory, NC)
Assignee: SENVION GMBH
F03D1/0675B23P15/04B29B11/16B29C70/023B29C70/083B29D99/0028F03D9/25F03D80/00B29L2031/085F05B2220/30F05B2230/20F05B2240/2211F05B2280/6003Y02E10/721Y02E10/722Y02E10/725Y02E10/74Y02P70/523Y10T29/4979Y10T29/49337Y10T29/49632Y10T29/49787Y10T156/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,655,597
App. No.
15/914,349
Granted
May 19, 2020
Kind
B2
Abstract

A method of forming a structural element for a wind turbine blade includes fixing a plurality of parallel strength rods to a carrier layer to form a preform layer of material, storing the preform layer in a coiled length, then dispensing the preform layer from the coiled length, partially grinding and then cutting across a width of the preform to form a plurality of cut perform layers, and then stacking them and then fixing them together using a liquid bonding resin material.

Claims (11)

1. A method for providing, storing, dispensing, tapering and cutting a preform layer of material to form a structural element for use in a wind turbine blade comprising the steps of:

a) providing a rectangular form of a preform layer of material having a length dimension and a width dimension, the preform layer of material being comprised of multiple elongate strength rods and a carrier layer, the multiple elongate strength rods being arranged on the carrier layer longitudinally and parallel relative to one another and parallel to the length dimension of the preform layer of material in a single layer, each strength rod being disposed adjacent to and spaced from at least one adjacent strength rod;

b) then fixing the multiple strength rods to the carrier layer by an adhesive;

c) then storing the preform layer of material provided from steps (a) and (b) in a coiled lengths form;

d) then dispensing lengths of the preform layer of material from the coiled lengths form;

e) then partially grinding through portions across the width of the preform layer of material dispensed from step (d) at predetermined lengths along the length of the preform layer of material to form a V-shape across the width of the preform layer of material; and

f) then cutting the grinded portions of material at the vertex of the V-shape to produce cut preform layers of predetermined lengths.

2. The method of claim 1 , further comprising the steps of:

g) then stacking a length of cut preform layer from step (f) with at least one other cut preform layer from step (f);

h) providing a liquid bonding resin, then causing the liquid bonding resin to flow between adjacent strength rods and through the carrier layer and to adjacent stacked preform layers; and

i) solidifying the liquid bonding resin to fix the stacked preform layers to form a structural element for a wind turbine blade.

Assignments (4)
REQUEST FOR ASSIGNEE ADDRESS CHANGE. Recorded Sep 5, 2025
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 072597/0865 →
CHANGE OF NAME Recorded Apr 10, 2025
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 070813/0669 →
CHANGE OF NAME Recorded Jan 28, 2025
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 070709/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 21, 2025
From: NEPTCO, INC.
To: SENVION GMBH
Reel/Frame 069947/0242 →