IP Library Granted Patent US 10,364,609
Granted Patent B2
US 10,364,609 · App. 15/921,615 · Granted Jul 30, 2019

Method for excavating mud line cellar for subsea well drilling

Inventors: Hans H. J. Deul (Richmond, TX); Patrick O'Neill (Houston, TX); Matthew Sibrel (Missouri City, TX); Robert van Kuilenburg (Sugar Land, TX)
Assignee: NOBLE DRILLING SERVICES INC.
E21B7/20E21B4/18E21B7/136E21B33/037E21B41/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,364,609
App. No.
15/921,615
Granted
Jul 30, 2019
Kind
B2
Abstract

A method for excavating a well cellar includes lowering an excavating apparatus having a cellar liner therein to a bottom of a body of water. The well cellar is excavated while contemporaneously lowering the cellar liner into the well cellar until a top of the cellar liner is substantially level with the bottom of the body of water. A pilot well is excavated below a bottom of the cellar. A well head support pipe is inserted into the pilot well. The bottom of the well cellar and a top of the cellar liner are covered.

Claims (19)

1. A method for excavating a well cellar, comprising:

lowering an excavating apparatus having a cellar liner therein to a bottom of a body of water, the excavating apparatus comprising pads mounted to articulated arms, the arms extendable and retractable to selectively lock the excavating apparatus in place inside the cellar liner, a first motor coupled to a drill bit, the first motor mounted to the excavating apparatus by a pivoting element operable so that an angle of the first motor with respect to a longitudinal axis of the excavating apparatus is controllable during use, means to move the excavating apparatus upwardly and downwardly, and a second motor attached to excavating apparatus enable rotation of the first motor about the longitudinal axis;

excavating the well cellar by operating the excavating apparatus, while contemporaneously lowering the cellar liner into the well cellar until a top of the cellar liner is substantially level with the bottom of the body of water;

excavating a pilot well below a bottom of the cellar using the excavating apparatus; and

inserting a well head support pipe into the pilot well.

2. The method of claim 1 further comprising inserting an extension pipe into the wellhead support pipe, the extension pipe extending through a cover on the top of the cellar liner.

3. The method of claim 2 further comprising covering the extension pipe with a cap having a locating beacon affixed thereto.

4. The method of claim 3 further comprising:

removing the cap;

drilling a surface well to a selected depth;

removing the extension pipe; and

inserting a surface casing in the surface well to the selected depth and cementing the surface casing in the surface well.

5. The method of claim 4 further comprising removing the cover from the top of the cellar liner and affixing a well pressure control apparatus to an upper end of the surface casing.

6. The method of claim 4 wherein the removing the cap, drilling the surface well, removing the extension pipe and inserting and cementing the surface casing is performed from a drilling unit moved to a location of the well cellar.

7. The method of claim 1 wherein the cellar liner comprises concrete.

8. The method of claim 1 wherein the excavating apparatus and cellar liner are lowered to the bottom of the body of water from a transport vessel.

9. The method of claim 8 further comprising moving the transport vessel from a location of the well cellar after covering the bottom of the well cellar and the top of the cellar liner.

10. The method of claim 9 further comprising moving the transport vessel to a location different than the location of the well cellar and repeating the lowering an excavating apparatus having a cellar liner therein to a bottom of a body of water, excavating the well cellar while contemporaneously lowering the cellar liner into the well cellar until a top of the cellar liner is substantially level with the bottom of the body of water, excavating a pilot well below a bottom of the cellar, inserting a well head support pipe into the pilot well and covering the bottom of the well cellar and a top of the cellar liner at the different location.

11. The method of claim 1 further comprising covering the bottom of the well cellar and a top of the cellar liner.

Assignments (4)
SECURITY INTEREST Recorded Mar 22, 2021
From: NOBLE SERVICES COMPANY LLC; NOBLE FINANCE COMPANY (F/K/A NOBLE CORPORATION)
To: JPMORGAN CHASE BANK, N.A., AS COLLATERAL AGENT
Reel/Frame 055671/0373 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 5, 2021
From: NOBLE DRILLING SERVICES LLC
To: NOBLE SERVICES COMPANY LLC
Reel/Frame 055163/0481 →
CHANGE OF NAME Recorded Feb 5, 2021
From: NOBLE DRILLING SERVICES INC.
To: NOBLE DRILLING SERVICES LLC
Reel/Frame 055239/0325 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2018
From: DEUL, HANS H.J.; O'NEILL, PATRICK; VAN KUILENBURG, ROBERT; SIBREL, MATTHEW
To: NOBLE DRILLING SERVICES INC.
Reel/Frame 045215/0324 →
Continuity (3)
Continuation PCTUS2016051920 · Sep 15, 2016
Provisional Application 62218600 · Sep 15, 2015
Related Publication 20180274301A1 · Sep 27, 2018