IP Library Granted Patent US 10,341,961
Granted Patent B2
US 10,341,961 · App. 15/933,781 · Granted Jul 2, 2019

Power control framework for multi-beam configuration

Inventor: Fang-Chen Cheng (Randolph, NJ)
Assignee: China Academy of Telecommunications Technology
H04W52/24H04L5/0048H04W52/146H04W52/242H04W52/245H04W52/265H04W52/367H04W72/0406H04W88/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,341,961
App. No.
15/933,781
Granted
Jul 2, 2019
Kind
B2
Abstract

A method for determining a Physical Uplink Share Channel (PUSCH) transmission power may comprise measuring reference signal received power, calculating downlink path loss by comparing the reference signal received power to a downlink transmit power from a next generation node B (gNB), obtaining parameters from the gNB, and determining the PUSCH transmission power based on a configured user equipment (UE) transmission power, bandwidth of PUSCH resource assignment, a target power including the sum of a cell specific nominal component and a UE specific component, a scaling factor, a downlink (DL) path loss, a UE specific parameter for different types of traffic, and a PUSCH power control adjustment state. The method may further comprise calculating a numerology adjustment factor based on a configured subcarrier spacing and a default subcarrier spacing, and utilizing the numerology adjustment factor to determine the PUSCH transmission power.

Claims (855)

1. A method for determining a Physical Uplink Share Channel (PUSCH) transmission power, the method implementable by a user equipment (UE), the method comprising:

measuring reference signal received power;

calculating downlink path loss by comparing the reference signal received power to a downlink transmit power from a next generation node B (gNB);

obtaining parameters from the gNB; and

determining the PUSCH transmission power P PUSCH,c (i,j) for a PUSCH transmission of a serving cell c using parameter set configuration with index j in PUSCH transmission period i, based on a formula as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

,

wherein P CMAX,c (i) is a configured UE transmission power for the serving cell c in the PUSCH transmission period i, M PUSCH,c (i) is bandwidth of PUSCH resource assignment expressed in number of resource blocks for PUSCH transmission period i, P O _ PUSCH,c (j) is a target power including the sum of a cell specific nominal component P O _ NOMINAL _ PUSCH,c (j) and a UE specific component P O _ UE _ PUSCH,c (j), α c (j) is a scaling factor, PL c is a downlink (DL) path loss, Δ TF,c (i) is a UE specific parameter for different types of traffic, and f c (i) is PUSCH power control adjustment state for the PUSCH transmission period i;

wherein the method further comprising:

calculating a numerology adjustment factor δ scs as follows:

δ

SCS

=

10

log

(

SCS

conf

SCS

default

)

[

dB

]

,

wherein SCS conf is a configured subcarrier spacing for the PUSCH transmission and SCS default is default subcarrier spacing; and

utilizing the numerology adjustment factor δ SCS as an additional parameter to determine the PUSCH transmission power as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

δ

SCS

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

.

2. The method of claim 1 , further comprising:

determining a reliability requirement of the PUSCH transmission; and

setting a value of a UE specific component P O _ UE _ PUSCH,c (i) in the target power P O _ PUSCH,c (j) based on the reliability requirement.

3. The method of claim 2 , wherein the reliability requirement includes one or more of Ultra Reliable Low Latency Communication (URLLC) and enhanced Mobile Broadband (eMBB).

4. The method of claim 1 , further comprising:

determining a UL multiple access scheme of the PUSCH transmission; and

setting a value of the nominal component P O _ NOMINAL PUSCH,c (j) of the target power P O _ PUSCH,c (j) based on the UL multiple access scheme.

5. The method of claim 4 , wherein the multiple access scheme includes one or more of scheduled based orthogonal multiple access (SB-OMA), non-orthogonal multiple access (NOMA) and grant free multiple access (GRMA).

6. The method of claim 1 , further comprising:

measuring peak-to-average power ratio (PAPR);

calculating a back-off factor Δ B,c (j) based on the measured PAPR, PAPR measured , and the average PAPR of Discrete Fourier Transform-spread-Orthogonal Frequency Division Multiplexing (DFT-S-OFDM), Avg.PAPR DFT-S-OFDM , as follows:

Δ

B

,

c

(

j

)

=

10

log

(

PAPR

measured

Avg

.

PAPR

DFT

-

S

-

OFDM

)

[

dB

]

;

and

 utilizing the back-off factor Δ B (j) as an additional parameter to determine the transmission power as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

-

Δ

B

,

c

(

j

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

.

7. The method of claim 1 , further comprising:

obtaining individual downlink (DL) path loss PL c,m of one beam m among multiple detected beams in multi-beam configuration, wherein m∈{1, 2 . . . , M} and M is the number of the multiple detected beams; and

calculating the DL path loss PL c as follows: PL c =PL c,R +δ c,R,m , wherein PL c,R is a reference path loss, δ c,R,m =β*(PL c,m −PL c,R ), wherein β is a correlation factor between beams configured by higher layer and 0<β≤1.

8. The method of claim 1 , further comprising:

obtaining individual downlink (DL) path loss PL c,m of one beam m among multiple detected beams in multi-beam configuration, wherein m∈{1, 2, . . . , M} and M is the number of the multiple detected beams; and

calculating the DL path loss PL c based on an optimization of joint reception of multiple path losses.

9. The method of claim 8 , wherein the DL path loss PL c is calculated as the minimum of all individual DL path loss min{PL c,1 , PL c,2 , . . . , PL c,M }.

10. The method of claim 8 , wherein the DL path loss PL c is calculated as the maximum of all individual DL path loss max{PL c,1 , PL c,2 , . . . , PL c,M }.

11. The method of claim 8 , wherein the DL path loss PL c is calculated as a weighted combination of all individual DL path loss

1

M

(

w

1

PL

c

,

1

+

w

2

PL

c

,

2

+

+

w

M

PL

c

,

M

}

.

12. A user equipment (UE) for determining a Physical Uplink Share Channel (PUSCH) transmission power, the user equipment comprising:

one or more processors; and

a memory storing instructions that, when executed by the one or more processors, cause the user equipment to perform:

measuring reference signal received power;

calculating downlink path loss by comparing the reference signal received power to a downlink transmit power from a next generation node B (gNB);

obtaining parameters from the gNB; and

determining the PUSCH transmission power P PUSCH,c (i,j) for a PUSCH transmission of a serving cell c using parameter set configuration with index j in PUSCH transmission period i, based on a formula as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

,

wherein P CMAX,c (i) is a configured UE transmission power for the serving cell c in the PUSCH transmission period i, M PUSCH,c (i) is bandwidth of PUSCH resource assignment expressed in number of resource blocks for PUSCH transmission period i, P O _ PUSCH,c (j) is a target power including the sum of a cell specific nominal component P O _ NOMINAL _ PUSCH,c (i) and a UE specific component P O _ UE _ PUSCH,c (i), α c (j) is a scaling factor, PL c is a downlink (DL) path loss, Δ TF,c (i) is a UE specific parameter for different types of traffic, and f(i) is PUSCH power control adjustment state for the PUSCH transmission period i;

wherein the instructions, when executed by the one or more processors, further cause the user equipment to perform:

calculating a numerology adjustment factor δ scs as follows:

δ

SCS

=

10

log

(

SCS

conf

SCS

default

)

[

dB

]

,

wherein SCS conf is a configured subcarrier spacing for the PUSCH transmission and SCS default is default subcarrier spacing; and

utilizing the numerology adjustment factor δ SCS as an additional parameter to determine the PUSCH transmission power as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

δ

SCS

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

.

13. The user equipment of claim 12 , wherein the instructions, when executed by the one or more processors, further cause the user equipment to perform:

determining a reliability requirement of the PUSCH transmission; and

setting a value of a UE specific component P O _ UE _ PUSCH,c (i) in the target power P O _ PUSCH,c (j) based on the reliability requirement.

14. The user equipment of claim 12 , wherein the instructions, when executed by the one or more processors, further cause the user equipment to perform:

determining a UL multiple access scheme of the PUSCH transmission; and

setting a value of the nominal component P O _ NOMINAL PUSCH,c (j) of the target power P O _ PUSCH,c (j) based on the UL multiple access scheme.

15. The user equipment of claim 12 , wherein the instructions, when executed by the one or more processors, further cause the user equipment to perform:

measuring peak-to-average power ratio (PAPR);

calculating a back-off factor Δ B,c (j) based on the measured PAPR, PAPR measured , and the average PAPR of Discrete Fourier Transform-spread-Orthogonal Frequency Division Multiplexing (DFT-S-OFDM), Avg.PAPR DFT-S-OFDM, as follows:

Δ

B

,

c

(

j

)

=

10

log

(

PAPR

measured

Avg

.

PAPR

DFT

-

S

-

OFDM

)

[

dB

]

;

and

 utilizing the back-off factor Δ B (j) as an additional parameter to determine the transmission power as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

-

Δ

B

,

c

(

j

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

.

16. The user equipment of claim 12 , wherein the instructions, when executed by the one or more processors, further cause the user equipment to perform:

obtaining individual downlink (DL) path loss PL c,m of one beam m among multiple detected beams in multi-beam configuration, wherein m∈{1,2, . . . , M} and M is the number of the multiple detected beams; and

calculating the DL path loss PL c as follows: PL c =P c,R +δ c,R,m , wherein PL c,R is a reference path loss, δ c,R,m =β*(PL c,m −PL c,R ), wherein β is a correlation factor between beams configured by higher layer and 0<β≤1.

17. The user equipment of claim 12 , wherein the instructions, when executed by the one or more processors, further cause the user equipment to perform:

obtaining individual DL path loss PL c,m of one beam m among multiple detected beams in multi-beam configuration, wherein m∈{1, 2, . . . , M} and M is the number of the multiple detected beams; and

calculating the DL path loss PL c based on an optimization of joint reception of multiple path losses.

18. A base station of a communication system for facilitating the determination of a Physical Uplink Share Channel (PUSCH) transmission power, the base station comprising:

a transceiver and a controller controlling the transceiver, the controller comprising one or more processors and a memory storing instructions that, when executed by the one or more processors, cause the controller to perform:

transmitting a signal including a reference signal to a user equipment (UE); and

signaling the parameters to the user equipment for determining a PUSCH transmission power P PUSCH,c (i,j) for a PUSCH transmission of a serving cell c using parameter set configuration with index j in PUSCH transmission period i, based on a formula as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

P

O_PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

,

wherein P CMAX,c (i) is a configured UE transmission power for the serving cell c in the PUSCH transmission period i, M PUSCH,c (i) is bandwidth of PUSCH resource assignment expressed in number of resource blocks for PUSCH transmission period i, P O _ PUSCH,c (j) is a target power including the sum of a cell specific nominal component P O _ NOMINAL _ PUSCH,c (j) and a UE specific component P O _ UE _ PUSCH,c (j), α c (j) is a scaling factor, PL c is a downlink path loss, Δ TF,c (i) is a UE specific parameter for different types of traffic, and f(i) is PUSCH power control adjustment state for the PUSCH transmission period i;

signaling the parameters to the user equipment for calculating a numerology adjustment factor δ scs as follows:

δ

SCS

=

10

log

(

SCS

conf

SCS

default

)

[

dB

]

,

wherein SCS conf is a configured subcarrier spacing for the PUSCH transmission and SCS default is default subcarrier spacing; and

utilizing the numerology adjustment factor δ SCS as an additional parameter to determine the PUSCH transmission power as follows:

P

PUSCH

,

c

(

i

,

j

)

=

min

{

P

CMAX

,

c

(

i

)

,

10

log

10

(

M

PUSCH

,

c

(

i

)

)

+

δ

SCS

+

P

O

PUSCH

,

c

(

j

)

+

α

c

(

j

)

·

PL

c

+

Δ

TF

,

c

(

i

)

+

f

c

(

i

)

}

.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 16, 2021
From: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY
To: DATANG MOBILE COMMUNICATIONS EQUIPMENT CO.,LTD.
Reel/Frame 057452/0169 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 23, 2018
From: CHENG, FANG-CHEN
To: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY
Reel/Frame 045326/0747 →
Continuity (2)
Provisional Application 62502424 · May 5, 2017
Related Publication 20180324708A1 · Nov 8, 2018
Cited By (2)
US 12,666,364 US 12,690,030