IP Library Granted Patent US 11,072,102
Granted Patent B2
US 11,072,102 · App. 15/943,786 · Granted Jul 27, 2021

In-mold non-time dependent determination of injection molded part ejection readiness

Inventors: Nicholas Mulkern Unkovic (Mason, OH); Gene Michael Altonen (West Chester, OH); Daniel Lumpkin (Cincinnati, OH); William Francis Lawless, III (Medford, MA); H. Kenneth Hanson, III (Cincinnati, OH); Chow-Chi Huang (West Chester, OH)
Assignee: IMFLUX, INC.
B29C45/7626B29C45/4005B29C45/76B29C45/78B29C45/762B29C2945/761B29C2945/7604B29C2945/76006B29C2945/7616B29C2945/7629B29C2945/76127B29C2945/76153B29C2945/76257B29C2945/76414B29C2945/76418B29C2945/76474B29C2945/76943
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,072,102
App. No.
15/943,786
Granted
Jul 27, 2021
Kind
B2
Abstract

Non-time dependent measured variables are used to effectively determine an optimal ejection time of a part from a mold cavity. A system and/or approach may first measure at least one non-time dependent variable during an injection molding cycle. The part is ready to be ejected from the mold upon the measured variable reaching a threshold value indicative of, for example, a part temperature dropping below an activation temperature.

Claims (14)

1. A method for determining whether a part is ready to be ejected from a mold cavity during an injection molding cycle, the method comprising:

measuring at least one non-time dependent variable during the injection molding cycle;

upon the measured at least one non-time dependent variable reaching a threshold value indicative of the part being structurally sound, ejecting the part from the mold cavity;

wherein the at least one non-time dependent variable comprises at least one of a Shore D Durometer or a Rockwell R hardness value measured via a hardness sensor.

2. The method of claim 1 , wherein the at least one non-time dependent variable is measured at a location inside of the mold cavity.

3. The method of claim 1 , wherein the at least one non-time dependent variable is measured at a location outside of the mold cavity.

4. The method of claim 1 , further comprising, in a subsequent injection molding cycle, using the measured variable from the previous injection molding cycle to determine when the part is structurally sound for ejection from the mold cavity.

5. A method for determining whether an injection molded part is ready to be ejected from an injection mold cavity, the method comprising:

measuring one or more non-time dependent variables at a location outside of the mold cavity, wherein the at least one non-time dependent variable comprises at least one of a Shore D Durometer or a Rockwell R hardness value measured via a hardness sensor;

upon the measured one or more non-time dependent variables reaching a threshold value indicative of the part being structurally sound, ejecting the part from the mold cavity.

6. The method of claim 5 , further comprising, in a subsequent injection molding cycle, using the measured variable from the previous injection molding cycle to determine when the part is structurally sound for ejection from the mold cavity.

7. A method for determining whether an injection molded part is ready to be ejected from an injection mold cavity, the method comprising: in a first injection molding cycle, injecting a first shot of molten plastic material into a mold cavity; during the first injection molding cycle, measuring a first non-time dependent variable value of a non-time dependent variable, the first non-time dependent variable value being indicative of a part being structurally sound; during a second injection molding cycle subsequent to the first injection molding cycle, injecting a second shot of molten plastic material into the mold cavity; during the second injection molding cycle, measuring a second non-time dependent variable value of the non-time dependent variable; and ejecting the part from the mold cavity when the second non-time dependent variable value is approximately equal to the first non-time dependent variable value; wherein the non-time dependent variable comprises at least one of a shore D Durometer or a Rockwell R hardness value measured via a hardness sensor.

8. The method of claim 7 , wherein the first non-time dependent variable value is measured prior to ejecting the part from the mold cavity.

9. The method of claim 7 , wherein the first non-time dependent variable value is measured after the part produced during the first injection molding cycle is ejected from the mold cavity.

Assignments (2)
NUNC PRO TUNC ASSIGNMENT Recorded Jul 29, 2024
From: IMFLUX, INC.
To: THE PROCTER & GAMBLE COMPANY
Reel/Frame 068178/0055 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 4, 2018
From: UNKOVIC, NICHOLAS MULKERN; ALTONEN, GENE MICHAEL; LUMPKIN, DANIEL; LAWLESS, WILLIAM FRANCIS, III; HANSON, H. KENNETH, III; HUANG, CHOW-CHI
To: IMFLUX, INC.
Reel/Frame 045436/0124 →
Continuity (2)
Provisional Application 62481291 · Apr 4, 2017
Related Publication 20180281257A1 · Oct 4, 2018