Building energy system with predictive control of battery and green energy resources

Inventors: Robert D. Turney (Watertown, WI); Nishith R. Patel (Madison, WI)
Assignee: Johnson Controls Technology Company
F24F11/47F24F11/56F24F11/64F24F11/65F25B27/00G05B13/021G05B13/048G05B15/02G06Q10/06G06Q50/06H02J3/32F24F2130/10F24F2140/60G05B2219/2642H02J3/003H02J2310/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,816,235
App. No.
15/963,857
Granted
Oct 27, 2020
Kind
B2
Abstract

A building energy system includes HVAC equipment, green energy generation, a battery, and a predictive controller. The HVAC equipment provide heating or cooling for a building. The green energy generation collect green energy from a green energy source. The battery stores electric energy including at least a portion of the green energy provided by the green energy generation and grid energy purchased from an energy grid and discharges the stored electric energy for use in powering the HVAC equipment. The predictive controller generates a constraint that defines a total energy consumption of the HVAC equipment at each time step of an optimization period as a summation of multiple source-specific energy components and optimizes the predictive cost function subject to the constraint to determine values for each of the source-specific energy components at each time step of the optimization period.

Claims (73)

1. A building energy system comprising:

HVAC equipment configured to provide heating or cooling for a building;

green energy generation configured to collect green energy from a green energy source;

a battery configured to store electric energy comprising at least a portion of the green energy provided by the green energy generation and grid energy purchased from an energy grid and configured to discharge the stored electric energy for use in powering the HVAC equipment; and

a predictive controller configured to generate a constraint that defines a total energy consumption of the HVAC equipment at each time step of an optimization period as a summation of multiple source-specific energy components comprising:

a grid energy component indicating an amount of the grid energy to purchase from the energy grid during the time step;

a green energy component indicating an amount of the green energy provided by the green energy generation during the time step; and

a battery energy component indicating an amount of the electric energy to store in the battery or discharge from the battery during the time step;

wherein the predictive controller is configured optimize the predictive cost function subject to the constraint to determine values for each of the source-specific energy components at each time step of the optimization period.

2. The building energy system of claim 1 , wherein the battery energy component:

adds to the grid energy component and the green energy component when the amount of the electric energy is discharged from the battery during the time step; and

subtracts from the grid energy component and the green energy component when the amount of the electric energy is stored in the battery during the time step.

3. The building energy system of claim 1 , wherein the predictive cost function accounts for:

a cost of the grid energy purchased from the energy grid at each time step of the optimization period; and

a cost savings resulting from discharging the stored electric energy from the battery at each time step of the optimization period.

4. The building energy system of claim 1 , wherein the predictive controller is configured to:

receive energy pricing data defining a cost per unit of the grid energy purchased from the energy grid at each time step of the optimization period; and

use the energy pricing data as inputs to the predictive cost function.

5. The building energy system of claim 1 , wherein the HVAC equipment comprise waterside equipment of a central plant and airside equipment within a building;

wherein the predictive cost function accounts for a cost of energy consumed by both the waterside equipment and the airside equipment at each time step of the optimization period.

6. The building energy system of claim 5 , wherein the predictive controller is configured to:

generate a second constraint that defines the total energy consumption of the HVAC equipment at each time step as a summation of multiple equipment-specific energy components comprising:

a waterside energy component indicating an amount of energy consumed by the waterside equipment during the time step; and

one or more airside energy components indicating one or more amounts of energy consumed by the airside equipment during the time step; and

optimize the predictive cost function subject to the second constraint to determine values for each of the equipment-specific energy components at each time step of the optimization period.

7. The building energy system of claim 6 , wherein the one or more airside energy components comprise at least one of:

an air handler unit (AHU) energy component indicating an amount of energy consumed by one or more AHUs of the building at each time step; or

a rooftop unit (RTU) energy component indicating an amount of energy consumed by one or more TRUs of the building at each time step.

8. The building energy system of claim 1 , wherein the predictive cost function accounts for a demand charge based on a maximum power consumption of the building energy system during a demand charge period that overlaps at least partially with the optimization period;

wherein the predictive controller is configured to receive energy pricing data defining the demand charge and to use the energy pricing data as inputs to the predictive cost function.

9. The building energy system of claim 1 , wherein the predictive controller comprises:

an economic controller configured to determine optimal power setpoints for the HVAC equipment and for the battery at each time step of the optimization period;

a tracking controller configured to use the optimal power setpoints to determine optimal temperature setpoints for one or more building zones at each time step of the optimization period; and

an equipment controller configured to use the optimal temperature setpoints to generate control signals for the HVAC equipment and for the battery at each time step of the optimization period.

10. The building energy system of claim 1 , further comprising a battery power inverter operable to control the amount of the electric energy stored in the battery or discharged from the battery during each time step;

wherein the predictive controller is configured to operate the battery power inverter to cause the battery to store or discharge the amount of the electric energy indicated by the battery energy component at each time step.

11. A method for controlling a building energy system, the method comprising:

operating HVAC equipment to provide heating or cooling for a building;

collecting green energy from a green energy source at green energy generation;

storing, in a battery, electric energy comprising at least a portion of the green energy collected by the green energy generation and grid energy purchased from an energy grid;

discharging, from the battery, the stored electric energy for use in powering the HVAC equipment;

generating a constraint that defines a total energy consumption of the HVAC equipment at each time step of an optimization period as a summation of multiple source-specific energy components comprising:

a grid energy component indicating an amount of the grid energy to purchase from the energy grid during the time step;

a green energy component indicating an amount of the green energy provided by the green energy generation during the time step; and

a battery energy component indicating an amount of the electric energy to store in the battery or discharge from the battery during the time step; and

optimizing the predictive cost function subject to the constraint to determine values for each of the source-specific energy components at each time step of the optimization period.

12. The method of claim 11 , wherein the battery energy component:

adds to the grid energy component and the green energy component when the amount of the electric energy is discharged from the battery during the time step; and

subtracts from the grid energy component and the green energy component when the amount of the electric energy is stored in the battery during the time step.

13. The method of claim 11 , wherein the predictive cost function accounts for:

a cost of the grid energy purchased from the energy grid at each time step of the optimization period; and

a cost savings resulting from discharging the stored electric energy from the battery at each time step of the optimization period.

14. The method of claim 11 , further comprising:

receiving energy pricing data defining a cost per unit of the grid energy purchased from the energy grid at each time step of the optimization period; and

using the energy pricing data as inputs to the predictive cost function.

15. The method of claim 11 , wherein the HVAC equipment comprise waterside equipment of a central plant and airside equipment within a building;

wherein the predictive cost function accounts for a cost of energy consumed by both the waterside equipment and the airside equipment at each time step of the optimization period.

16. The method of claim 15 , further comprising:

generating a second constraint that defines the total energy consumption of the HVAC equipment at each time step as a summation of multiple equipment-specific energy components comprising:

a waterside energy component indicating an amount of energy consumed by the waterside equipment during the time step; and

one or more airside energy components indicating one or more amounts of energy consumed by the airside equipment during the time step; and

optimizing the predictive cost function subject to the second constraint to determine values for each of the equipment-specific energy components at each time step of the optimization period.

17. The method of claim 16 , wherein the one or more airside energy components comprise at least one of:

an air handler unit (AHU) energy component indicating an amount of energy consumed by one or more AHUs of the building at each time step; or

a rooftop unit (RTU) energy component indicating an amount of energy consumed by one or more TRUs of the building at each time step.

18. The method of claim 11 , wherein the predictive cost function accounts for a demand charge based on a maximum power consumption of the building energy system during a demand charge period that overlaps at least partially with the optimization period;

the method further comprising receiving energy pricing data defining the demand charge and to using the energy pricing data as inputs to the predictive cost function.

19. The method of claim 11 , wherein optimizing the predictive cost function comprises determining optimal power setpoints for the HVAC equipment and for the battery at each time step of the optimization period;

the method further comprising:

using the optimal power setpoints to determine optimal temperature setpoints for one or more building zones at each time step of the optimization period; and

using the optimal temperature setpoints to generate control signals for the HVAC equipment and for the battery at each time step of the optimization period.

20. The method of claim 11 , further comprising operating a battery power inverter to control the amount of the electric energy stored in the battery or discharged from the battery during each time step;

wherein operating the battery power inverter causes the battery to store or discharge the amount of the electric energy indicated by the battery energy component at each time step.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 9, 2024
From: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
To: TYCO FIRE & SECURITY GMBH
Reel/Frame 067056/0552 →
NUNC PRO TUNC ASSIGNMENT Recorded Feb 4, 2022
From: JOHNSON CONTROLS TECHNOLOGY COMPANY
To: JOHNSON CONTROLS TYCO IP HOLDINGS LLP
Reel/Frame 058959/0764 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 12, 2020
From: TURNEY, ROBERT D.; PATEL, NISHITH R.
To: JOHNSON CONTROLS TECHNOLOGY COMPANY
Reel/Frame 052096/0646 →
Continuity (2)
Provisional Application 62491059 · Apr 27, 2017
Related Publication 20180313563A1 · Nov 1, 2018