IP Library Granted Patent US 10,870,242
Granted Patent B2
US 10,870,242 · App. 15/985,840 · Granted Dec 22, 2020

Methods for modifying wind turbine blade molds

Inventors: Christopher Daniel Caruso (Greenville, SC); Aaron A. Yarbrough (Greenville, SC); Daniel Alan Hynum (Simpsonville, SC); James Robert Tobin (Simpsonville, SC)
Assignee: General Electric Company
B29C73/10B29C33/3892B29C33/40B29C33/74B29C65/08B29C73/12B29C33/306B29C33/42B29C2033/0094B29K2105/06B29K2901/12B29L2031/085Y02P70/50
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,870,242
App. No.
15/985,840
Granted
Dec 22, 2020
Kind
B2
Abstract

The present disclosure is directed methods for modifying molds of rotor blades of a wind turbine. In certain embodiments, the blade mold is constructed, at least in part, of a thermoplastic material optionally reinforced with a fiber material. In one embodiment, the method includes identifying at least one blade mold addition for the mold of the rotor blade and positioning the blade mold addition at a predetermined location of the mold of the rotor blade. Further, the blade mold addition is constructed, at least in part, of a thermoplastic material. Thus, the method includes applying at least one of heat, pressure, or one or more chemicals at an interface of the blade mold addition and the mold so as to join the blade mold addition to the mold. In further embodiments, the methods described herein are also directed repairing thermoplastic blade molds.

Claims (13)

1. A method for repairing a mold of a rotor blade of a wind turbine, the method comprising:

identifying at least one defect on the mold, the mold constructed, at least in part, of a thermoplastic material reinforced with at least one fiber material;

annealing the at least one defect for a predetermined time period to allow the thermoplastic material to at least partially fill the at least one defect;

positioning one or more layers of thermoplastic material at the at least one defect;

welding the one or more layers of thermoplastic material to the at least one defect of the mold for a predetermined time period until the defect is repaired.

2. The method of claim 1 , further comprising reinforcing at least a portion of the one or more layers of thermoplastic material with at least one fiber material.

3. The method of claim 1 , wherein welding the one or more layers of thermoplastic material to the at least one defect further comprises at least one of laser welding, resistance welding, direct heat welding, ultrasonic welding, induction welding, or chemical welding.

4. The method of claim 1 , further comprising reinforcing the mold at the at least one defect with at least one of a predetermined thickness or a structural member such that the welding is localized to the defect.

5. The method of claim 1 , wherein welding the one or more layers of thermoplastic material to the at least one defect further comprises providing one or more heating elements at the at least one defect and heating the mold via the one or more heating elements.

6. The method of claim 5 , wherein the heating elements are provided in at least one of the following locations: within the mold or on a surface of the mold.

7. The method of claim 1 , further comprising providing one or more support members configured to support the mold, the support members being constructed, at least in part, of a thermoplastic material.

8. The method of claim 7 , further comprising determining one or more locations for the support members based on a location of the defect.

9. The method of claim 1 , wherein the mold is reinforced with one or more fiber materials.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 22, 2024
From: LM WIND POWER US TECHNOLOGY APS
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 066869/0770 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 9, 2023
From: GENERAL ELECTRIC COMPANY
To: LM WIND POWER US TECHNOLOGY APS
Reel/Frame 065531/0160 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2018
From: CARUSO, CHRISTOPHER DANIEL; YARBROUGH, AARON A.; HYNUM, DANIEL ALAN; TOBIN, JAMES ROBERT
To: GENERAL ELECTRIC COMPANY
Reel/Frame 045869/0007 →
Continuity (2)
Division 14862191 · Sep 23, 2015
Related Publication 20180264760A1 · Sep 20, 2018