IP Library Granted Patent US 10,710,308
Granted Patent B2
US 10,710,308 · App. 16/009,013 · Granted Jul 14, 2020

Heating and cooling of extrusion tool for additive manufacturing

Inventor: Cory Mark Bloome (San Francisco, CA)
Assignee: Autodesk, Inc.
B29C64/393B29C48/92B29C64/209B29C64/227B29C64/295B33Y30/00B33Y50/02G05B19/4099B29C2948/92066B29C2948/9298B29C2948/92209B29C2948/92485B29C2948/92561B29C2948/92704B29C2948/92923G05B2219/35134G05B2219/49007
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,710,308
App. No.
16/009,013
Granted
Jul 14, 2020
Kind
B2
Abstract

An additive manufacturing system, which can include a 3D printer, includes in at least one aspect: a build platform; a carriage and a rack configured to hold different manufacturing tools, including an extrusion tool; a heating device associated with the extrusion tool; a 3D motion system configured to move the carriage between the rack and a build space associated with the build platform, and to move the carriage within the build space associated with the build platform; and one or more computers programmed to trigger the heating device to begin pre-heating the extrusion tool at a point before mounting of the extrusion tool to the carriage by the 3D motion system, such that the material in the extrusion tool is melted by a point in the manufacturing process when the extrusion tool will be mounted on the carriage and in position to extrude material in the build space.

Claims (48)

1. A three dimensional (3D) printer system comprising:

a build platform;

a carriage configured to hold different manufacturing tools, including an extrusion tool;

a rack configured to hold the different manufacturing tools, including the extrusion tool, when not mounted on the carriage;

a heating device associated with the extrusion tool;

a 3D motion system coupled with the carriage and configured to move the carriage between the rack and a build space associated with the build platform, and to move the carriage within the build space associated with the build platform;

one or more computer storage media having instructions stored thereon; and

one or more data processing apparatus configured to execute the instructions to perform operations comprising

identifying a first point in a manufacturing process when the extrusion tool will be mounted on the carriage and in position to extrude material in the build space,

determining a second point, which precedes the first point in the manufacturing process, when the extrusion tool will be located on the rack, wherein a time between the second point and the first point in the manufacturing process is determined in accordance with the material to be extruded by the extrusion tool, and

triggering the heating device to begin pre-heating the extrusion tool at the second point before mounting of the extrusion tool to the carriage by the 3D motion system, such that the material in the extrusion tool is melted by the first point in the manufacturing process;

wherein the heating device is integrated with the extrusion tool, the system comprises a cooling device associated with the extrusion tool, and the one or more data processing apparatus are configured to execute the instructions to perform operations comprising triggering the cooling device to reduce a temperature of the extrusion tool when the extrusion tool is relocated on the rack after use of the extrusion tool in the manufacturing process;

wherein the one or more data processing apparatus are configured to execute the instructions to perform operations comprising:

identifying a third point after the first point in the manufacturing process when use of the extrusion tool will end and the extrusion tool will be relocated on the rack;

determining a fourth point, which succeeds the third point in the manufacturing process, when the extrusion tool will be relocated on the rack, wherein a time between the third point and the fourth point in the manufacturing process is determined in accordance with the material extruded by the extrusion tool and the temperature of the extrusion tool during the material extrusion; and

operating the cooling device until the fourth point in the manufacturing process to reduce the temperature of the extrusion tool;

wherein the one or more data processing apparatus are configured to execute the instructions to determine the fourth point by performing operations comprising repeatedly recalculating a cooling equation using actively collected temperature measurements.

2. The 3D printer system of claim 1 , wherein the extrusion tool reaches a target temperature just before arriving in the position to extrude the material in the build space.

3. The 3D printer system of claim 1 , wherein the heating device is coupled with the rack.

4. The 3D printer system of claim 3 , wherein the heating device is a Peltier device.

5. The 3D printer system of claim 3 , wherein the rack comprises a temperature sensor.

6. The 3D printer system of claim 1 , wherein the rack is coupled with the 3D motion system and moves along with at least one axis of the 3D printer system.

7. The 3D printer system of claim 1 , wherein the one or more data processing apparatus are configured to execute the instructions to determine the second point by performing operations comprising repeatedly recalculating a heating equation using actively collected temperature measurements.

8. The 3D printer system of claim 1 , wherein the cooling device is coupled with the rack.

9. The 3D printer system of claim 1 , wherein the extrusion tool comprises a melt zone and a heat sink, the melt zone is upstream from an aperture of a nozzle of the extrusion tool, the heat sink is upstream from the melt zone, and the cooling device is configured to actively cool the heat sink, the nozzle, or both.

10. The 3D printer system of claim 9 , wherein the cooling device comprises a fan.

11. The 3D printer system of claim 9 , wherein the cooling device comprises a Peltier device positioned on the rack to make contact with the heat sink, the nozzle, or both, when the extrusion tool is relocated on the rack.

12. The 3D printer system of claim 1 , wherein the extrusion tool comprises at least a hot end of a Fused Filament Fabrication (FFF) extruder assembly.

13. A method comprising:

identifying a first point in a manufacturing process when an extrusion tool will be mounted on a carriage and in position to extrude material in a build space;

determining a second point, which precedes the first point in the manufacturing process, when the extrusion tool will be located on a rack, wherein a time between the second point and the first point in the manufacturing process is determined in accordance with the material to be extruded by the extrusion tool; and

triggering a heating device to begin pre-heating the extrusion tool at the second point before mounting of the extrusion tool to the carriage, such that the material in the extrusion tool is melted by the first point in the manufacturing process;

triggering a cooling device to reduce a temperature of the extrusion tool when the extrusion tool is relocated on the rack after use of the extrusion tool in the manufacturing process;

identifying a third point after the first point in the manufacturing process when use of the extrusion tool will end and the extrusion tool will be relocated on the rack;

determining a fourth point, which succeeds the third point in the manufacturing process, when the extrusion tool will be relocated on the rack, wherein a time between the third point and the fourth point in the manufacturing process is determined in accordance with the material extruded by the extrusion tool and the temperature of the extrusion tool during the material extrusion; and

operating the cooling device until the fourth point in the manufacturing process to reduce the temperature of the extrusion tool;

wherein determining the fourth point comprises repeatedly recalculating a cooling equation using actively collected temperature measurements.

14. The method of claim 13 , wherein the extrusion tool reaches a target temperature just before arriving in the position to extrude the material in the build space.

15. The method of claim 13 , wherein determining the second point comprises repeatedly recalculating a heating equation using actively collected temperature measurements.

16. A non-transitory computer-readable medium encoding instructions that cause a data processing apparatus associated with a three dimensional (3D) printer system to perform operations comprising:

identifying a first point in a manufacturing process when an extrusion tool will be mounted on a carriage and in position to extrude material in a build space;

determining a second point, which precedes the first point in the manufacturing process, when the extrusion tool will be located on a rack, wherein a time between the second point and the first point in the manufacturing process is determined in accordance with the material to be extruded by the extrusion tool; and

triggering a heating device to begin pre-heating the extrusion tool at the second point before mounting of the extrusion tool to the carriage, such that the material in the extrusion tool is melted by the first point in the manufacturing process;

triggering a cooling device to reduce a temperature of the extrusion tool when the extrusion tool is relocated on the rack after use of the extrusion tool in the manufacturing process;

identifying a third point after the first point in the manufacturing process when use of the extrusion tool will end and the extrusion tool will be relocated on the rack;

determining a fourth point, which succeeds the third point in the manufacturing process, when the extrusion tool will be relocated on the rack, wherein a time between the third point and the fourth point in the manufacturing process is determined in accordance with the material extruded by the extrusion tool and the temperature of the extrusion tool during the material extrusion; and

operating the cooling device until the fourth point in the manufacturing process to reduce the temperature of the extrusion tool;

wherein determining the fourth point comprises repeatedly recalculating a cooling equation using actively collected temperature measurements.

Assignments (2)
CHANGE OF ADDRESS FOR ASSIGNEE Recorded Aug 19, 2022
From: AUTODESK, INC.
To: AUTODESK, INC.
Reel/Frame 061572/0061 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 25, 2020
From: BLOOME, CORY MARK
To: AUTODESK, INC.
Reel/Frame 052221/0877 →
Continuity (2)
Provisional Application 62519567 · Jun 14, 2017
Related Publication 20180361671A1 · Dec 20, 2018
Cited By (1)
US 12,709,060