IP Library Granted Patent US 10,859,063
Granted Patent B2
US 10,859,063 · App. 16/028,801 · Granted Dec 8, 2020

Power reduction in a plurality of wind power plants in a wind farm

Inventor: Jens Geisler (Rendsburg, DE)
Assignee: SENVION GmbH
F03D7/028F03D7/0284F03D7/043F03D7/047F03D7/048G05B13/024F05B2270/1033F05B2270/20F05B2270/335F05D2270/20F05D2270/335
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 10,859,063
App. No.
16/028,801
Granted
Dec 8, 2020
Kind
B2
Abstract

A method for operating a wind farm in a reduced-power throttle mode in which a farm master determines an individual setpoint power reduction for each participating wind power plant by determining an available power for each wind power plant, reducing this available power by a reduction proportion; determining the reduction proportions using an optimization method with the optimization condition of equal increase time for the wind power plants; and repeating until the optimization method reaches a presettable termination criterion.

Claims (31)

1. A method for operating a wind farm that comprises a plurality of wind power plants, each with a controller, for generating electrical power and a farm master for controlling the power output of the wind power plants, wherein the wind farm can be operated in a normal mode and a reduced-power throttle mode, the method comprising, in the throttle mode:

receiving at the farm master a signal for a power reduction of the wind farm ΔP set,farm ;

determining an individual setpoint power reduction P set,i for each participating wind power plant of the plurality of wind power plants, wherein determining the individual setpoint power reduction comprises:

determining an available power P avail(i) for each of the participating wind power plants,

determining a power reduction proportion ΔP i for each participating wind power plant using an optimization method that is based on an optimization condition of equal power increase time T regain, opt =T regain, i for all of the participating wind power plants, wherein the determination of the power reduction proportion is repeated until the optimization method meets a presettable termination criterion, and

subtracting the power reduction proportion ΔP i for a respective participating wind power plant from the available power P avail(i) for the respective participating wind power plant; and

providing the individual setpoint power reduction P set,i to each participating wind power plant for throttling each participating wind power plant.

2. The method of claim 1 , wherein the optimization method is carried out incompletely over a fixed period.

3. The method of claim 2 , wherein the period is a time period.

4. The method of claim 2 , wherein the period is a number of repetitions.

5. The method of claim 2 , wherein the optimization method is executed incrementally, starting from the result of an optimization method that was executed last.

6. The method of claim 1 , wherein the optimization method comprises enforcing a secondary condition even in the case of incomplete optimization.

7. The method of claim 6 , wherein the enforcement is executed by a correction factor.

8. The method of claim 6 , wherein the secondary condition comprises a sum of the reduction proportions ΔP i .

9. The method of claim 8 , wherein the secondary condition comprises the sum of the reduction proportions being equal to the power reduction of the wind farm.

10. The method of claim 1 , wherein the determination of the individual setpoint power reduction P set,i for each participating wind power plant is based on a minimum power of each participating wind power plant.

11. The method of claim 1 , wherein at least one wind power plant of the plurality of wind power plants are excluded from throttling.

12. The method of claim 11 , wherein the at least one wind power plant that is excluded has available power that is below a settable threshold.

13. The method of claim 1 , wherein the optimization method uses a polynomial function for the increase time of the participating wind power plants that is stored at the farm master.

14. The method of claim 1 , wherein the optimization method uses a multidimensional characteristic map function for the increase time of the participating wind power plants that is stored at the farm master.

15. The method of claim 1 , comprising locally calculating an increase time at each participating wind power plant and transmitting the increase time from each participating wind power plant to a central unit for the optimization method.

16. The method of claim 1 , wherein execution of the optimization method is at least partially decentralized.

17. A wind farm operable in a normal mode and a reduced-power throttle mode, the wind farm comprising:

a plurality of wind power plants, each with a controller, for generating electrical power; and

a farm master for controlling the power output of the wind power plants, wherein the farm master is configured to, in the throttle mode:

receive at the farm master a signal for a power reduction of the wind farm ΔP set,farm ;

determine an individual setpoint power reduction P set,i for each participating wind power plant of the plurality of wind power plants, wherein determining the individual setpoint power reduction comprises:

determining an available power P avail(i) for each of the participating wind power plants,

determining a power reduction proportion ΔP i for each participating wind power plant using an optimization method that is based on an optimization condition of equal power increase time T regain, opt =T regain, i for all of the participating wind power plants, wherein the determination of the power reduction proportion is repeated until the optimization method meets a presettable termination criterion, and

subtracting the power reduction proportion ΔP i for a respective participating wind power plant from the available power P avail(i) for the respective participating wind power plant; and

provide the individual setpoint power reduction P set,i to each participating wind power plant for throttling each participating wind power plant.

Assignments (4)
CHANGE OF ADDRESS Recorded Aug 31, 2023
From: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064834/0873 →
CHANGE OF NAME Recorded Oct 20, 2022
From: SENVION DEUTSCHLAND GMBH
To: SIEMENS GAMESA RENEWABLE ENERGY SERVICE GMBH
Reel/Frame 064371/0624 →
CHANGE OF NAME Recorded Sep 16, 2022
From: SENVION GMBH
To: SENVION DEUTSCHLAND GMBH
Reel/Frame 061462/0567 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 22, 2018
From: GEISLER, JENS
To: SENVION GMBH
Reel/Frame 046663/0355 →